Inst. & control system engineer 14+ years’ experience FEED, EPCm, PMC Projects


Last Updated: 31st July 2018 (over 4 years ago)

Address
United Arab Emirates

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Masters

Languages
English, Gujarati, Hindi

Summary

A result oriented Instrumentation and control system professional having more than 14+ years’ experience in a wide range of FEED, EPCm, LSTK EPC, and PMC projects for large scale Oil & Gas Refinery and Petrochemical Plants.

The diversified project execution & engineering experience in multi-cultural, multiple discipline office on large scale projects with Oil & Gas and/or Petrochemical Clients- Shell QGTL, ExxonMobil, Shell-BGC, Qatargas, Qatar Petroleum, Oryx, KOC, KNPC, SADARA, Reliance, Essar, HPCL, PTTAR, SCG etc.

Education

Gujarat University Ahmedabad
Masters of Engineering-Instrumentation & Control System

   Jun 2004
— Jul 2005

Experience

Kentz Engineering, SNC Lavalin Group of Company, QATAR/UAE
Lead/Sr Instrumentation Engineer

   Aug 2016
— Current

Project : BGC-IOT8 TIE-IN PROJECTS, BASRAH-IRAQ
Client : Shell- BGC (Basrah Gas Company)
Responsibility : Lead Engineer
Job Function
Preparation, review and approval of I&C drawings and documents for FEED & detailed design engineering activities. Major Tie-Ins Interface between IOT8 (DeltaV ICSS) & CS8 (Yokogawa Centum System). Vendor offer review, Procurement, FAT, Modification pack for systems ,Interface agreement, Fiber Optic Network System Design, Man-hour estimation, Weekly/Monthly progress report, Client coordination, Participate in design review meeting, HAZOP and SIL session etc.

Project : PMC2- WEST QURNA I (WQI) DEGASSING STATIONS DS#6/7/8, BASRAH-IRAQ
Client : Exxon Mobil Iraq Limited
Responsibility :Sr. Engineer
Job Function
Prepared and review I&C drawings, specifications, Instrument selection and sizing. Major Tie-Ins work for Emerson DeltaV ICSS System, Integration of LERs, Remote IO Rooms & Desalter over DeltaV ICSS Fiber Optic Ring, 3D model review, Prepared Installation & Hook-up typical drawings, Review vendor offer & documentation, SPI-INtools activities, Review and approval of EPC Contractor’s drawing & documents.

Project :EPCm/GS - UTL GRVE IMPROVEMENT PROJECT, RLIC DOHA-QATAR
Client : Shell GTL Limited Qatar
Responsibility :Lead/Sr. Engineer
Job Function
I&C detailed engineering activities, Modification and Tie-ins with existing Honeywell Experion PKS Control system, Document retrieval from Client, Modification in existing system drawings/documents, Procurements, TQ/TBE, Vendor document review & approval, SPI-INtools activities, Man-hour estimation, Prepare DCN & TQs to Client, Weekly & Monthly progress Report, Participate in design review meeting with Client, Participation in HAZOP, Site-Survey, Construction & Commissioning Support etc.

Project : ZERO LIQUID DISCHARGE (ZLD)-LAFFAN REFINERY, RLIC DOHA-QATAR
Client :Qatargas (QG)- Qatar
Responsibility :Sr. Engineer
Job Function
I&C detailed engineering activities, Control system engineering activities (Invensys- Schneider electric), Procurements, TQ/TBE, Vendor document review & approval, Client coordination, Interface & coordination with 3rd party package supplier, SPI-INtools setup & activities, Participate in design review meeting with Client, Participation in HAZOP, Site Survey, Construction & Commissioning Support, Worked as a assistance lead engineer etc.

Project : FEED FOR HAZARDOUS WASTE INCINERATOR AT HWTC, MESAIEED DOHA-QATAR
Client :Qatar Petroleum (QP)
Responsibility :Sr. Engineer
Job Function
Prepared and review I&C engineering deliverables for FEED & Extended FEED project. Prepared Design Basis, Instrument Specification for Field Instruments, Valves and Control system, Typical Hook-up & Installation Standard etc. Incinerator vendor package review, Client coordination, preliminary cost estimation, Worked as a assistance lead engineer etc.

Project : GS WO#29,30, 36: Up gradation of Catalyst-Transfer System & Demolition of Nutsche Filter MOC-1195 : Zero TIW discharged to Sea, Interconnecting line between East and West WWTP.
Client :ORYX, JV of Qatargas & SASOL- RLIC Doha, Qatar
Responsibility :Lead Engineer
Job Function
Detailed Engineering activities for Instrumentation, Modification and Tie-ins with existing DCS/ESD Invensys Control system, Modification in logic diagram, Site survey, Vendor offer evaluation, Client & Vendor coordination, Man-hour estimation, Participate in design review meeting with Client, Participation in HAZOP, Weekly/monthly Progress Report etc.

Ad
Ad
Ad