SUMMARY OF EXPERIENCES/ QUALIFICATIONS
• Fellow Chartered Professional Engineer-Engineers Australia
• Chartered Engineer from Institution of Chemical Engineers (IChemE UK and Australia)
• More than (21) years of total work experiences in the field of Process, Operations, Process Safety, Start-up and Commissioning Engineering;
- FEED (Front End Engineering Design),
- EPCM (Engineering Procurement Construction and Management) of Oil & Gas Companies in the Philippines, China, Saudi Arabia, Iraq, Qatar and Australia.
- Turnaround (or TAR)-shutdown activities.
• Experienced in (Upstream Operation/ Exploration/ Production):
- Large producing oilfields and gas fields
- LNG (Liquefied Natural Gas) Plant
- LPG (Liquefied Petroleum Gas), Degasser, HP, LP and Test Separators interface
- Dehydrator and Desalter system
- Produced Water and Sand Jetting system, Gas/ Artificial lift
- Filtration, Scrubbers, Dehydration using TEG or MEG,
- Cryogenic Turbo Compressor-Expander, Amine System,
- Turbo Compression, Bullet and NGL Storages, Loading Racks (LPG and NGL),
- Onshore/ Offshore Facilities (Platforms, Subsea Wells), Condensate and Nitrogen System,
- Pig Launchers, Booster and MOL Pumps, Wells and Flowlines,
- Flash Gas and Export Compressors, Coolers, Fuel Gas Systems and Scrubbers
- Offshore Water Injection System using Deaerator Towers
- Effluent and Sewage Treatment Plants, Commissioning, Construction and Maintenance.
• Pipeline Experiences:
- Completed oil/ gas pipeline designs & commissioning using AS2885 & ASME B31.3 such as 300 km Jambour Gas Pipeline, 30 km Four Mile West Pipeline, 200 km Subsea Pipeline from DWG to West Chirag and others.
• Refinery skills (Shell and Saudi Aramco Yanbu refineries):
- Provided prompt and effective technical advice to troubleshoot operating issues and supported refinery safety and environmental programs.
- Monitored the performance of refinery process units, made recommendations to improve its performance.
- Sulphur recovery unit and Light Ends processing
- Hydrocracking and Hydrotreating/ hydroprocessing
- Distillation and Separation Technologies
• Worked with Brownfield and Greenfield projects in Onshore and Offshore Oil & Gas industries
• Worked with the teams within the asset organisation (Subsurface, Operations, Project Management & Engineering) and those external to it (Major Projects).
• Developed process engineering designs associated with Waste/ Water Treatment:
- Microfiltration, Membrane Bioreactor (MBR), Reverse Osmosis (RO), Ozone,
- Tertiary Membrane Filter (TMF) and Micro Porous Polymer Extraction (MPPE).
- Mono-ethylene glycol (MEG) recovery
• Very proficient in reviewing and conducting engineering tasks:
- Conceptual Designs, Hydraulic Calculations, Datasheets, alarms and trip settings
- Design Philosophies/ Design Basis (BoD), Equipment List, Process Simulations, vendor data review,
- Operating Procedures, Control Narratives, IPF Narratives (SIL), Engineering Query (EQ) and HAZOP,
- Process Descriptions/ Specifications, Management of Change (MOC), Relief Safety Project (RSP)
- Designed of Oil and Gas Process Engineering work for Onshore and Offshore projects using Codes and Client Standards (Australian Standards, BP, API, ASME, SHEL DEP and Saudi Aramco Standards).

ACHIEVEMENTS
• Designed 30 km pipeline from Central Plant to Four Mile West as per AS2885 and ASME B31.3 including 6 boosting stations. Slashed annual costs ~$5M by initiating lean design techniques (using fluid flow/ Pumpsim) to reduce OPEX/CAPEX in the pipeline project.
• Promoted as Senior Discipline Responsible Engineer-DRE (Process TA Deputy) after 1 year in the role.
• Attained Fellow Chartered Professional Engineer Certification from Engineers Australia.
• Received spot awards on DWG Produced Water and Sand System projects delivery and start-up (3 phase mode).
• DWG Special recognition award in achieving milestones with 1500 days of continuous operation without a single shutdown event.
• Boosted DWG Oil production by 5 mbod (250K/day USD) from oil optimization.
• Trained new employees (Process Eng, CRT’s, interns and challengers).
• Lazy well start-up using N2, bull heading and Gas Lift which expedite well operation.
• Led/ SPA the DWG revalidation Hazop, LOPA and RSP revalidation and finished them ahead of time.
• Optimized Water Injection system and managed to run the system on spec for water injection to downhole (450 mbwd=3M USD/day).

QUALIFICATIONS GAINED
PROFESSIONAL QUALIFICATIONS
• Fellow Chartered Professional Engineer-Engineers Australia (2802728)
• Chartered Engineer from Institution of Chemical Engineers (99916125)
• Chartered Engineer from Engineering Council, UK
• Registered Professional Engineer of Queensland (RPEQ-No. 14251)
• Professional Engineer from National Engineering Register (NER) in Australia

EDUCATIONAL ACHIEVEMENTS
Master of Business Administration
Australian Institute of Business (Project Management) - Adelaide Australia (2016)
University of Western Australia
Postgraduate Diploma in Oil and Gas Engineering - Perth Australia (2008 – 2011)
UNIVERSITY
Mapùa Institute of Technology (MIT)
Bachelor of Science in Chemical Engineering - Philippines (June 1996 – Mar 2000) Top 4, Scholar
Meralco Foundation Institute (MFI)
Industrial Instrumentation and Process Control Technology - Philippines (June 1993 – May 1996)-Scholar

PROFESSIONAL DEVELOPMENT

• Strategic Management (MBA-Australia)
• Financial Management (MBA-Australia)
• Strategic Human Resource Management (MBA-Australia)
• Marketing Management (MBA-Adelaide Australia)
• Leadership: Enhancing the Lessons of Experience (MBA-Australia)
• Operations Management (MBA-Australia)
• Corporate Management (MBA- Australia)
• Project Management (Australia)
• Environmental Engineering (Australia)
• Production Optimization (Australia)
• Subsea Engineering and Technology (Australia)
• PWMP CA-CWP and DWG-PCWU PW Guard Filters (BP-Azerbaijan)
• Chirag-DWG Process Technical Limit with BMT (BP-Azerbaijan)
• KKI Gas lift/Injection choke Valve (BP-Azerbaijan)
• HAZOP and LOPA - The BP Way (Advanced UK)
• Aspentech Flare Network Design and Rating (BP-Azerbaijan)
• Flow assurance with Olga (SPT Group-Schlumberger Baku)
• Workshop-Prepare to Lead-Future Leader (BP-Azerbaijan)
• Operational Risk Assessment (BP Azerbaijan)
• ASPEN Hysys: Process Modelling (BP-Azerbaijan)
• RCFA-Root Cause Failure Analysis (BP-Azerbaijan)
• What If Risk Analysis (BP-Azerbaijan)
• Introduction to Process Safety (BP-Azerbaijan)
• Heat Recovery in The Process Industries (Perth Australia)
• Sulphur Technology Presentation (Perth Australia)
• Senior First Aid Training-St. John Ambulance (Australia)

EMPLOYMENT SUMMARY
1. Kellogg, Brown and Root - KBR (seconded to BP-Rumaila Organisation Operations-ROO)-Basra Iraq (Exploration/ Production)
Position - Lead Process Operation Support Engineer
Duration/ Address - 26 Nov 2018 – Present (Basra Iraq) – Rotation (28/28)
Project - Rumaila Oil field (world’s largest producing oilfield) – 1,500 mbod & 900 MMscfd
2. Heathgate Resources-Uranium Mining In-Situ Recovery (Operation/Exploration/ Production)
Position - Lead Process Project Engineer
Duration/ Address - 1 June 2017 – 15 Nov 2018 (South Australia)
Project - Heathgate Resources Pty Ltd-Uranium Mining In-Situ Recovery (30 km pipeline & new plant expansion project)
3. BP Plc-BP Australia
Position - Lead Process Operation Engineer
Duration/ Address - 1 Nov 2011 – 31 Dec 2016 (BP Australia)
Project - 3 Offshore Platforms, Pipeline, Subsea, Gas Lift and Water Injection (200 mbod)
Project Cost - 50 Billion USD
4. Crescent Petroleum-Dana Gas Joint Venture-Operator
Position - Lead Process Operation Engineer
Duration/ Address - 8 March 2010 –31 Oct 2011 (Kurdistan, Iraq)
Project - Gas Compression Facilities (320 MMSCFD-Gases and 30,000 STD BPD-Condensate)
Project Cost - 900 Million USD
5. Qatar Petroleum (QP)-Operator
Position - Competency Assessor/ Coach (Process-Operations)
Duration/ Address - 04 May 2009 –27 Feb 2010 (Qatar)
Project - Qatar Petroleum – Ras Laffan LNG
6. Foster Wheeler-Worley Parsons Joint Venture
Position - Senior Process Engineer
Duration/ Address - 19 March 2007 –15 April 2009 (Perth, Western Australia)
Project - Pluto LNG Project for Woodside Energy Limited (Oil and Gas industry)
Project Cost - 30 Billion USD
7. Yanbu Refinery (Saudi Aramco)
Position - Senior Process Engineer
Duration/ Address - 15 Feb 2004 –15 Jan 2007 (Saudi Arabia)
Project - Refining capacity 100,000 barrels per day of petrol
Project Cost - 20 Billion USD
8. Arabian-American Installation Company, Ltd.
Position - Senior Project Engineer
Duration/ Address - 12 Feb 2003 –12 Dec 2003 (Saudi Arabia)
Company Business - Engineering, Design, Installation and Commissioning (Oil and Gas industry)
9. RFM Company
Position - Operation & Maintenance Superintendent
Duration/ Address - 16 April 2000 –10 Jan 2003 (Philippines)
10. Shell Refinery Philippines-Seconded
Position - Process Engineer
Duration/ Address - 26 Nov 1995 –3 March 2000 (Philippines)
Company Business - Refinery operation-60,000 barrels per day of petrol

WORK EXPERIENCES
LEAD PROCESS OPERATION SUPPORT ENGINEER (26 Nov 2017 – Present) - Rotation (28/28)
KBR (seconded to BP-Rumaila Organisation Operations-ROO)-Rumaila Oil field-Basra Iraq
RESPONSIBILITIES
• Providing daily Process engineering support to Area Operations Team and being the first point of contact for any Process Engineering queries from the area operations team.
• Working closely with optimisation and production teams to identify debottlenecking opportunities & constraints and initiating debottlenecking projects as necessary.
• Performs Process Engineering calculations and sizing or guiding others in sizing of the equipment needed to process gas and crude oil.
• Develop or lead others in developing Process Flow Diagrams, Piping & Instrumentation Diagrams, and Major Equipment Data Sheets.
• Lead internal design activities and technical decisions.
• Coordinate with owners’ representatives to optimize solutions being offered.
• Develop or lead others in developing Process Flow Diagrams, Piping & Instrumentation Diagrams, and Major Equipment Data Sheets.
• Attend internal and external meeting as the company’s technical expert. These include, but are not limited to kick off meetings, design reviews, cost studies, etc.
• Develop or guide contractors in simulation in HYSYS.
• Assumes Single Point Accountable (SPA) for the front-end definition of various technical changes originating from operational work scopes. Carry out Site Surveys, preparation of Basis of Design, SOR’s, EQs response and MOC development.
• Working closely with operations personnel (e.g. Operations Manager, Operations Team Leader, Ops advisors, Site Engineers and HSE personnel) to define and lead where necessary on the following key aspects of process safety:
- Operational Risk Assessment
- Pre-start up Safety Review (PSSR)
• Act as custodian of the station capacity and safe operating limits.
• Represent ROO on technical issues associated with 3rd party organisations such as key vendors and other IOCs as necessary.

LEAD PROCESS PROJECT ENGINEER (1 June 2017 – 15 Nov 2018)
Heathgate Resources Pty Ltd-Uranium Mining In-Situ Recovery-Australia
RESPONSIBILITIES
• Liaised with Planning & Technical, Production, Laboratory, Geology, Projects and Exploration team to optimise In-Situ Recovery of Uranium.
• Designed 30 km pipeline from Central Plant to Four Mile West as per AS2885 & ASME B31.3 including 6 boosting stations.
• Prepared and managed the quotations, technical documents, bid schedules and OPEX/ CAPEX with PMT Members, Contractor, Subcontractors and Vendors engineers to establish and maintain required technical interfaces during the Project.
• Commissioning/ Project Manager for Capital Project and Capital spend within budget at year end.
• Provide leadership for the site Technical Team.
• Managed Hazop and Hazard Studies for the Uranium In-Situ Recovery Beverley site.
• Managed contractors and consultants as required and overseeing them from all areas of operations and implementations of value-add projects (e.g. new pipeline, new well, chemical injection & etc.)
• Resolved bottlenecks and other issues using Fluid flow, Pumpsim, AquaC and other simulation software’s.
• Delivered $20M-50M projects in accordance with budgets.

LEAD PROCESS OPERATION ENGINEER- (1 Nov 2011 – 31 Dec 2016)
BP Plc-Chirag-Deepwater Guneshli Platforms (CDWG)-Azerbaijan
BP Australia employee assigned to BP Caspian in Azerbaijan
RESPONSIBILITIES
• Operations Support - provide rapid response to support the CDWG area facilities following incidents or process upsets.
• Experience in facility optimisation/ debottlenecking and generating plans to improve water injection capacity.
• Experience in improving Produced Water handling capacity by trouble-shooting existing surface facilities.
• Led process & process safety engineering within the CDWG asset providing technical support including; Operations, Maintenance, Projects (Brownfield and Greenfield Development Projects), and Construction on all aspects of process and process safety engineering in CDWG.
• Advised on engineering activities on existing & proposed facilities. Includes Field Development; Produced water handling/treatment; minimum/zero flaring; Gas/ Artificial lift.
• Close out all outstanding MOC's, EQ's, Traction actions, Maximo and SAP. Proactive to outstanding MOC's, EQ's, ORA's, ISSOW's, Tractions, PEI and others to ensure that they are in compliant and on time.
• HSE inputs to support CDWG performance contract including safety audits, Isolation Audits, Safety Observations, Risk assessments, incident investigations etc.
• Member/ leader of Management of Change (MOC), HAZOP, Layer of Protection Analysis (LOPA), Pre-start up safety review (PHSSER), RCFA, Operational Risk Assessment (ORA), Cirrus Consequence Modelling, What-If-Risk Assessment and Incident Investigation.
• Perform competency assessments of DWG/ Chirag Offshore Upstream Operations members (Field & Control Room Operators/ Technicians) in their essential job functions according to Competency Program requirements.

LEAD PROCESS OPERATION ENGINEER (8 March 2010 –31 Oct 2011)
CRESCENT PETROLEUM-DANA GAS-LPG Gas Compression Facilities and Upstream Operations-Kurdistan, Iraq
RESPONSIBILITIES
• Ensured all new design changes under Management of Change (MOC) processes are captured, assessed and documented.
• Resolved Technical Queries, HAZOP and resourcing/ scheduling to deliver outcomes to internal & external customers.
• Provided engineering and integrity expertise for the physical gas plant, whilst being part of the Commissioning/ Operations Engineering team.
• Coordinated ongoing engineering with Sharjah HQ Engineering Manager for any current and future site works.
• Provided Process Engineering Support to Early Production Facilities (EPF).
• Led and executed work plans and budgets and flexible for planned/ unplanned events in the project/ plant.
• Interfaced effectively with HSE, Engineering, Production, Construction, Commissioning, Operations, Maintenance and Client.
• Worked with all personnel to ensure safe operation on site and to resolve issues to achieve operations outcomes.
• Responsible for reviewing work permits for commissioning scope.
• Experienced of working in high H2S and CO2 operations.

COMPETENCY ASSESSOR/ COACH (PROCESS-OPERATIONS) (04 July 2009 –27 Feb 2010)
QP-Ras Laffan LNG
RESPONSIBILITIES
• Developed, used and implemented all Competency Based Training Materials/ Courses in Process Department using Qatar Petroleum-Competence Development Program Quality Standards.
• Applied and conducted regular Trainee Assessments in both theoretical and practical activities.
• Trained and guided Qatari Nationals in gathering evidence for competence assessment and in preparation of their Portfolios for Competence Assurance Systems (CAS) assessments.

SENIOR PROCESS ENGINEER (19 March 2007 –15 April 2009)
FOSTER WHEELER-WORLEYPARSONS JV-Perth, Western Australia
(PLUTO LNG PROJECT FOR WOODSIDE ENERGY LIMITED)
RESPONSIBILITIES
• Developed process engineering designs associated with Pluto LNG Project Effluent Waste/ Water Treatment and Mono-ethylene glycol (MEG) recovery:
- Microfiltration, Membrane Bioreactor (MBR),
- Reverse Osmosis (RO), Ozone, Biological Activated Carbon (BAC),
- Tertiary Membrane Filter (TMF) and Micro Porous Polymer Extraction (MPPE).
- Steam stripping of sour water.
- Conventional water treatment-oily water systems, demineralised water production, cooling tower circuits,
- Activated carbon adsorption and Nitrate polishing removal
• Carried out all aspects of Process Engineering of Pluto LNG Project (e.g. MEG, ETP) from conceptual design studies through to detailed design. Activities include- P&ID’s, PFD’s and Material Selection Scheme.
• Preparation of Heat and Mass Balances, Cause & Effect Diagrams (C&E), Line Sizing, Hydraulic calculations, Analyser Specification, Compressor Selection, Line List, Tie-Ins, Control Philosophy, Technical Notes, Study Reports and etc.
• Preparation of Process Datasheets for Control Valves, Separators, Pumps, Tanks, Seal Pots and Heat Exchangers.
• Liaised with client, vendors and outside 3rd parties during proposal and project execution.
• Sized PRV’s using API RP520 and 521, for single/ multi-phase vapour and liquid relief cases.

SENIOR PROCESS ENGINEER (15 Feb 2004 –15 Jan 2007)
YANBU REFINERY-SAUDI ARAMCO-Saudi Arabia-Refining capacity 100,000 barrels per day of petrol
BASIC & DETAILED ENGINEERING OF THE FF:
• Sulphur recovery unit and Light Ends processing
• Hydrocracking and Hydrotreating/ hydroprocessing
• Distillation and Separation Technologies
• Thermal Conversion and aromatics
• Closed Hydrocarbon System and Nitrogen Inerting/ Purging System
• Injection Dosing System and Sampling and Test System
• Power Generation System
• Water Treatment Plant System and Sewage Treatment Plant System
• Instrument Air System and Inert Gas System
RESPONSIBILITIES
• Provided prompt and effective technical advice to troubleshoot operating issues and supported refinery safety and environmental programs.
• Developed and improved PFD’s, P&ID’s, C&E Diagrams, Hazardous Area Classification, Instrument Data Sheets, Equipment Specifications and Air Flow and Instrument Diagrams (AFID’s).
• Analysed and ran process simulations work (HYSYS, FlareNet and Pro II).
• Participated in risk assessment and process hazard studies (HAZOP, LOPA and HAZID).

SENIOR PROJECT ENGINEER (12 Feb 2003 –12 Dec 2003)
ARABIAN-AMERICAN INSTALLATION COMPANY, LTD.-Saudi Arabia
RESPONSIBILITIES
• Monitored the progress of the project as per the project plan and against the client’s requirements and take corrective action whenever required.
• Participated in the review of the project planning process and create a schedule, which is in line with the project requirements including establishing the sequence and duration of activities.
• Supported the Project Manager the duties and responsibilities for project management and coordination of Concept Optimization, FEED & EPCM contractors, through Project teams of Senior Project and Project Engineers.
• Coordinated a team of multidiscipline engineers to achieve a cost-effective design through timely resolution of technical and engineering issues.
• Managed the completion progress throughout the project.
• Ensured all relevant as-Built Drawings / Documents are marked up as defined in project As-Built Procedure.
• Coordinated and ensures Project Quality Plans/HSE Plans/Environment Management Plans are in place and adhered throughout the execution phase. Ensures that CLIENT corporate requirements are complied with.

OPERATION & MAINTENANCE SUPERINTENDENT (16 April 2000 –10 Jan 2003)
RFM COMPANY-Philippines (FMCG Fast-moving consumer goods)
RESPONSIBILITIES
• Responsible for driving Production activity through a highly focused team of Operators. Ensures that the team achieves targets and KPI's, with a strong focus on modelling safe behaviour.
• Overall management of staff, production and facility to meet and exceed the production expectations and drive production targets.
• Implemented Just-in-Time (JIT) production methodology to control costs and inventory, resulting in a 20% improvement in efficiency.
• Led BTR (Batch Trial Run) to improve the qualities of new and old product formulations.
• Led, achieved and demonstrated Total Quality Management (TQM), Continuous Improvement (CI) and Good Manufacturing Practice (GMP).
• Performed Cleaning in Place systems (CPI), to allow cleaning of process equipment without dismantling or manual cleaning with minimal operator involvement.
• Executed Aseptic processing which a sterile (aseptic) product is packaged in sterile container.
• Managed processing facilities such as Pasteurisation, Ultrapasteurisation, Ultra-High temperature (UHT) and Homogenisation processes.
• Led and developed the team, rolling out training programs and continuous improvement & LEAN strategies.
• Led large teams 100+ people.

PROCESS ENGINEER (26 Nov 1995 –3 March 2000)
(SHELL REFINERY PHILIPPINES-SECONDED)-Philippines (Refining capacity-60,000 barrels per day of petrol)
RESPONSIBILITIES
• Monitored the performance of refinery process units, made recommendations to improve its performance, and provided timely and cost-effective solutions to complex problems and developed process designs and equipment process specifications.

PERSONAL INFORMATION
• Citizenship - Australian
• Civil Status - Married
• Date of Birth - 1976

PERSONAL ATTRIBUTES
• Strong technical and engineering skills as Lead/ Senior Process, Site Engineer, Operations, Commissioning or Project Manager/ Superintendent.
• Mentoring and team leadership skills with the ability to mentor and develop site personnel.
• Ability to provide innovation and logical problem-solving skills.
• Proven experience in management of people & conflict resolution.
• Strong commitment to safety.
• Strong verbal and written communication skills.
• Excellent planning and organization skills.
• Excellent fault-finding skills.

OTHER SKILLS AND INFORMATIONS
• MAXIMO, SAP, MS Office, Work order, Maximo.
• LEAN, GMP standards, JIT HACCP, CPI, OH&S and CI methodology.
• Proficient in HYSYS (ASPHEN), Pro II, PIPESIM, PIPESYS, FlareNet, SMARTPLANT, AutoCAD.
• Flow Assurance-PVTSim, Multiflash (Wax, Asphaltenes, Hydrates and etc.).
• Pumpsim, AquaC, Fluid Simulation, METBal, Reagents Forecasting.

r from Institution of Chemical Engineers (IChemE UK and Australia)
• More than (19) years of total work experiences in the field of Process, Operations, Process Safety, Commissioning and Instrumentation Engineering;
- FEED (Front End Engineering Design),
- EPCM (Engineering Procurement Construction and Management) of Oil & Gas Companies in the Philippines, China, Saudi Arabia, Iraq, Qatar and Australia.
- Turnaround (or TAR)-shutdown activities.
• Experienced in:
- LNG (Liquefied Natural Gas) Plant
- LPG (Liquefied Petroleum Gas), Degasser, HP, LP and Test Separators interface
- Produced Water and Sand Jetting system, Gas/ Artificial lift
- Filtration, Scrubbers, Dehydration using TEG or MEG,
- Cryogenic Turbo Compressor-Expander, Amine System,
- Turbo Compression, Bullet and NGL Storages, Loading Racks (LPG and NGL),
- Onshore/ Offshore Facilities (Platforms, Subsea Wells), Condensate and Nitrogen System,
- Pig Launchers, Booster and MOL Pumps, Wells and Flowlines,
- Flash Gas and Export Compressors, Coolers, Fuel Gas Systems and Scrubbers
- Offshore Water Injection System using Deaerator Towers
- Effluent and Sewage Treatment Plants, Commissioning, Construction and Maintenance.
• Performed process design and developed:
- Piping and Instrument Diagrams (P&ID’s) and Process Flow Diagrams (PFD’s) design,
- Cause & Effect Diagrams (C&E’s), Relief and Blowdown Study and etc.
• Worked with Brownfield and Greenfield projects in Onshore and Offshore Oil & Gas industries
• Worked with the teams within the CDWG asset organisation (Subsurface, Operations, Project Management, Engineering) and those external to it (Major Projects)
• Developed process engineering designs associated with Waste/ Water Treatment:
- Microfiltration, Membrane Bioreactor (MBR), Reverse Osmosis (RO), Ozone,
- Tertiary Membrane Filter (TMF) and Micro Porous Polymer Extraction (MPPE).
- Mono-ethylene glycol (MEG) recovery
• Very proficient in reviewing and conducting engineering tasks:
- Conceptual Designs, Hydraulic Calculations, Datasheets, alarms and trip settings
- Design Philosophies/ Design Basis (BoD), Equipment List, Process Simulations, vendor data review,
- Operating Procedures, Control Narratives, IPF Narratives (SIL), Engineering Query (EQ) and HAZOP
- Process Descriptions/ Specifications, Management of Change (MOC), Relief Safety Project (RSP)
• Manufacturing areas of expertise:
- Lean manufacturing, Just-in-Time (JIT) Production.
- Team Building and Training, Cost reduction and avoidance.
- Total Quality Management (TQM), Continuous Improvement (CI), LEAN and Good Manufacturing Practice (GMP).
- Achieving production targets and KPI's.
- Driving change management within LEAN and CI methodology.
- Clean-in-place (CPI) system and HACCP principles
• Designed of Oil and Gas Process Engineering work for Onshore and Offshore projects using Codes and Client Standards (Australian Standards, BP, API, ASME, SHEL DEP and Saudi Aramco Standards).

ACHIEVEMENTS
• Reduced staff by 40 while maintaining production levels through a redesign of operational processes and improved training and staff utilization.
• Played integral role in identifying and transitioning work to outsourced vendor, reducing total manufacturing costs by 30%.
• Promoted as Senior Discipline Responsible Engineer-DRE (Process TA Deputy) after 1 year in the role.
• Attained Fellow Chartered Professional Engineer Certification from Engineers Australia.
• Received spot awards on DWG Produced Water and Sand System projects delivery and start-up (3 phase mode).
• DWG Special recognition award in achieving milestones with 1500 days of continuous operation without a single shutdown event.
• Boosted DWG Oil production by 5 mbod (250K/day USD) from oil optimization.
• Trained 5 new employees (Process Eng, CRT’s, interns and challengers).
• Lazy well start-up using N2, bull heading and Gas Lift which expedite well operation.
• Led/ SPA the DWG revalidation Hazop, LOPA and RSP revalidation and finished them ahead of time.
• Optimized Water Injection system and managed to run the system on spec for water injection to downhole (450 mbwd=3M USD/day).

QUALIFICATIONS GAINED
PROFESSIONAL QUALIFICATIONS
• Fellow Chartered Professional Engineer-Engineers Australia (2802728)
• Chartered Engineer from Institution of Chemical Engineers (99916125)
• Chartered Engineer from Engineering Council, UK
• Registered Professional Engineer of Queensland (RPEQ-No. 14251)
• Professional Engineer from National Engineering Register (NER) in Australia

EDUCATIONAL ACHIEVEMENTS
Master of Business Administration
Project Management - Australian Institute of Business - Adelaide Australia (2016)
University of Western Australia
Postgraduate Diploma in Oil and Gas Engineering - Perth Australia (2008 – 2011)
UNIVERSITY
Mapùa Institute of Technology (MIT)
Bachelor of Science in Chemical Engineering - Philippines (June 1996 – Mar 2000) Top 4, Scholar
Meralco Foundation Institute (MFI)
Industrial Instrumentation and Process Control Technology - Philippines (June 1993 – May 1996)-Scholar

PROFESSIONAL DEVELOPMENT

• Strategic Management (MBA-Australia)
• Financial Management (MBA-Australia)
• Strategic Human Resource Management (MBA-Australia)
• Marketing Management (MBA-Adelaide Australia)
• Leadership: Enhancing the Lessons of Experience (MBA-Australia)
• Operations Management (MBA-Australia)
• Corporate Management (MBA- Australia)
• Project Management (Australia)
• Environmental Engineering (Australia)
• Production Optimization (Australia)
• Subsea Engineering and Technology (Australia)
• PWMP CA-CWP and DWG-PCWU PW Guard Filters (BP-Azerbaijan)
• Chirag-DWG Process Technical Limit with BMT (BP-Azerbaijan)
• KKI Gas lift/Injection choke Valve (BP-Azerbaijan)
• HAZOP and LOPA - The BP Way (Advanced UK)
• Aspentech Flare Network Design and Rating (BP-Azerbaijan)
• Flow assurance with Olga (SPT Group-Schlumberger Baku)
• Workshop-Prepare to Lead-Future Leader (BP-Azerbaijan)
• Operational Risk Assessment (BP Azerbaijan)
• ASPEN Hysys: Process Modelling (BP-Azerbaijan)
• RCFA-Root Cause Failure Analysis (BP-Azerbaijan)
• What If Risk Analysis (BP-Azerbaijan)
• Introduction to Process Safety (BP-Azerbaijan)
• Heat Recovery In The Process Industries (Perth Australia)
• Sulphur Technology Presentation (Perth Australia)
• Senior First Aid Training-St. John Ambulance (Australia)

EMPLOYMENT SUMMARY
1. BP Plc
Position - Senior Process Operation Engineer
Duration /Address - 1 Nov 2011 – 31 Dec 2016 (BP Australia)
Project - 3 Offshore Platforms, Pipeline, Subsea, Gas Lift and Water Injection
Project Cost - 50 Billion USD
2. Crescent Petroleum-Dana Gas Joint Venture-Operator
Position - Lead Process Facilities Engineer
Duration/ Address - 8 March 2010 –31 Oct 2011 (Iraq)
Project - Gas Compression Facilities (320 MMSCFD-Gases and 30,000 STD BPD-Condensate)
Project Cost - 900 Million USD
3. Qatar Petroleum (QP)-Operator
Position - Competency Assessor (Process)
Duration/ Address - 04 July 2009 –27 Feb 2010 (Qatar)
Project - Qatar Petroleum – Ras Laffan LNG
4. PetroChina-Dagang Oilfield-Operator
Position - Process-Chemical Instructor
Duration/ Address - 04 May 2009 –04 June 2009 (Dagang Oilfield-Tianjin, China)
Project - PETROCHINA-DAGANG OILFIELD (Oil and Gas industry)
5. Foster Wheeler-Worley Parsons Joint Venture
Position - Senior Process Engineer
Duration/ Address - 19 March 2007 –15 April 2009 (Perth, Western Australia)
Project - Pluto LNG Project for Woodside Energy Limited (Oil and Gas industry)
Project Cost - 30 Billion USD
6. ABV Rock Group Kb, Site 7 (Saudi Aramco-Seconded-Operator)
Position - Senior Process Engineer
Duration/ Address - 15 Feb 2004 –15 Jan 2007 (Saudi Arabia)
Project - Saudi Aramco/ Saudi Strategic Storage Plant-Underground Oil Storage Facilities
Project Cost - 100 Billion USD
7. Arabian-American Installation Company, Ltd.
Position - Senior Project Engineer
Duration/ Address - 12 Feb 2003 –12 Dec 2003 (Saudi Arabia)
Company Business - Engineering, Design, Installation and Commissioning (Oil and Gas industry)
8. RFM Company-Milk & Juice Division
Position - Operation & Maintenance Superintendent
Duration/ Address - 16 April 2000 –10 Jan 2003 (Philippines)
9. Well Tech Service Corporation (Shell Philippines-Seconded)
Position - Process Control Engineer
Duration/ Address - 26 Nov 1995 –3 March 2000 (Philippines)
Company Business - Engineering, Design, Installation and Commissioning (Oil and Gas industry)

WORK EXPERIENCES
SENIOR PROCESS OPERATION ENGINEER (1 Nov 2011 – 31 Dec 2016)
BP Plc-Senior DRE-Chirag-Deepwater Guneshli Platforms (CDWG)-Azerbaijan
BP Australia employee assigned to BP Caspian in Azerbaijan
RESPONSIBILITIES
• Operations Support - provide rapid response to support the CDWG area facilities following incidents or process upsets.
• Experience in facility optimisation/ debottlenecking and generating plans to improve water injection capacity.
• Experience in improving Produced Water handling capacity by trouble-shooting existing surface facilities.
• Accountable for area engineering activities in 6 & 12-week Area Plan.
• Met deadlines consistently on facilities major maintenance/ TAR with concept development, work and detailed planning, execution and close of all major maintenance.
• Trained 5 new younger local employees.
• Lead process & process safety engineering within the CDWG asset providing technical support including; Operations, Maintenance, Projects (Brownfield and Greenfield Development Projects), and Construction on all aspects of process and process safety engineering in CDWG.
• Lead identification of development opportunities through engagements with external stakeholders.
• Liaise with the Brownfield project managers who are undertaking rehabilitation activities to understand the proposed facility upgrades and their likely timing.
• Implement the relevant engineering standards, capture lessons learned through pre- and post-project reviews, and implement quality, and provide support to operations and maintenance for facility upgrades.
• Worked effectively with PMT Members, Contractor, Subcontractors and Vendors engineers to establish and maintain required technical interfaces during the Project.
• Provided process advice and input to other groups and disciplines within the Project including Safety, Electrical, Instrumentation and Control, Mechanical, Construction, Commissioning, Operations and Procurement.
• Advises on engineering activities on existing & proposed facilities. Includes Field Development; Produced water handling/treatment; minimum/zero flaring; Gas/ Artificial lift.
• Close out all outstanding MOC's, EQ's, Traction actions, Maximo and SAP. Proactive to outstanding MOC's, EQ's, ORA's, ISSOW's, Tractions, PEI and others to ensure that they are in compliant and on time.
• Prepares conceptual design or provide advice on process matters which may arise during Operation, commissioning & start-up.
• HSE inputs to support CDWG performance contract including safety audits, Isolation Audits, Safety Observations, Risk assessments, incident investigations etc.
• Member/ leader of Management of Change (MOC), HAZOP, Layer of Protection Analysis (LOPA), Pre-start up safety review (PHSSER), RCFA, Operational Risk Assessment (ORA), Cirrus Consequence Modeling, What-If-Risk Assessment and Incident Investigation.
• Defined standardized Operations Readiness activities for the portfolio of projects.
• Planed and executed Operations Readiness activities in accordance with the Operations Readiness Project Standard and its underpinning process and methodologies.
• Assertively influencing a Project team delivery of a design that will fully satisfy operational requirements (availability, integrity, OPEX and HSE), whilst recognizing project objectives around CAPEX and Schedule
• Asset Integrity - safety critical element and performance standards, safety critical task development.

LEAD PROCESS FACILITIES ENGINEER (8 March 2010 –31 Oct 2011)
CRESCENT PETROLEUM-DANA GAS-Liquefied Petroleum Gas Compression Facilities (Cryogenic Natural Gas)-Iraq
RESPONSIBILITIES
• Ensured all new design changes under Management of Change (MOC) processes are captured, assessed and documented.
• Resolved Technical Queries, HAZOP and resourcing/ scheduling to deliver outcomes to internal & external customers.
• Provided engineering and integrity expertise for the physical gas plant, whilst being part of the Commissioning/ Operations Engineering team.
• Coordinated ongoing engineering with Sharjah HQ Engineering Manager for any current and future site works.
• Provided Process Engineering Support to Early Production Facilities (EPF).
• Led and executed work plans and budgets and flexible for planned/ unplanned events in the project/ plant.
• Assigned and directed tasks to teams and team members to meet deadlines consistently.
• Interfaced effectively with HSE, Engineering, Production, Construction, Commissioning, Operations, Maintenance and Client.
• Worked with all personnel to ensure safe operation on site and to resolve issues to achieve operations outcomes.
• Acted as delegate to Commissioning Manager to review/accept mechanical completion packages from construction.
• Led daily Progress / SIMOPS meeting and provide input / comments as required.
• Responsible for reviewing work permits for commissioning scope.
• Experienced of working in high H2S and CO2 operations.

COMPETENCY ASSESSOR (PROCESS) (04 July 2009 –27 Feb 2010)
QP-Ras Laffan LNG
RESPONSIBILITIES
• Developed, used and implemented all Competency Based Training Materials/ Courses in Process Department using Qatar Petroleum-Competence Development Program Quality Standards.
• Applied and conducted regular Trainee Assessments in both theoretical and practical activities.
• Trained and guided Qatari Nationals in gathering evidence for competence assessment and in preparation of their Portfolios for Competence Assurance Systems (CAS) assessments.

PROCESS-CHEMICAL INSTRUCTOR (04 May 2009 –04 June 2009)
PETROCHINA-DAGANG OILFIELD-Tianjin, China
RESPONSIBILITIES
• Prepared and conducted Training Materials/ Courses for the Production & Process Engineers/ Operators/ Technicians in co-ordination with the Lead Training Coordinator.
• Assessed the 96 On the Job Trainees-OJT / juniors attending the Basic Course for Subsea Technology, LNG, GTL and Produced Water Treatment for Offshore/ Onshore Plants.
• Acted as coach, competence assessor/ verifier and mentor whilst monitoring and reporting their performance.

SENIOR PROCESS ENGINEER (19 March 2007 –15 April 2009)
FOSTER WHEELER-WORLEYPARSONS JV-Perth, Western Australia
(PLUTO LNG PROJECT FOR WOODSIDE ENERGY LIMITED)
RESPONSIBILITIES
• Developed process engineering designs associated with Pluto Lng Project Effluent Waste/ Water Treatment and Mono-ethylene glycol (MEG) recovery recovery:
- Microfiltration, Membrane Bioreactor (MBR),
- Reverse Osmosis (RO), Ozone, Biological Activated Carbon (BAC),
- Tertiary Membrane Filter (TMF) and Micro Porous Polymer Extraction (MPPE).
- Steam stripping of sour water,
- Conventional water treatment - oily water systems, demineralised water production, cooling tower circuits,
- Activated carbon adsorption and Nitrate polishing removal
• Carried out all aspects of Process Engineering of Pluto LNG Project (e.g. MEG, ETP) from conceptual design studies through to detailed design. Activities include- P&ID’s, PFD’s and Material Selection Scheme.
• Preparation of Heat and Mass Balances, Cause & Effect Diagrams (C&E), Line Sizing, Hydraulic calculations, Analyzer Specification, Compressor Selection, Line List, Tie-Ins, Control Philosophy, Technical Notes, Study Reports and etc.
• Preparation of Process Datasheets for Control Valves, Separators, Pumps, Tanks, Seal Pots, Heat Exchangers, Filters and etc.
• Checked, corrected and updated project master documents/drawings.
• Liaised with client, vendors and outside 3rd parties during proposal and project execution.
• Sized PRV’s using API RP520 and 521, for single/ multi-phase vapor and liquid relief cases.

SENIOR PROCESS ENGINEER (15 Feb 2004 –15 Jan 2007)
ABV ROCK GROUP KB, Site 7 (SAUDI ARAMCO)-SITE 7- Saudi Arabia
BASIC & DETAILED ENGINEERING OF THE FF:
• Closed Hydrocarbon System and Nitrogen Inerting/ Purging System
• Injection Dosing System and Sampling and Test System
• Power Generation System
• Water Treatment Plant System and Sewage Treatment Plant System
• Multi-product (Scraper Trap System, Surge Relief System and Pipeline And Product Handling System)
• Instrument Air System and Inert Gas System
RESPONSIBILITIES
• Developed and improved PFD’s, P&ID’s, C&E Diagrams, Hazardous Area Classification, Instrument Data Sheets, Equipment Specifications and Air Flow and Instrument Diagrams (AFID’s).
• Analyzed and ran process simulations work (HYSYS, FlareNet and Pro II).
• Participated in risk assessment and process hazard studies (HAZOP, LOPA and HAZID).
• Generated and submitted PATS (Product Acceptance Test System), SCATS (System Commissioning Acceptance Tests), FAT (Field Acceptance Test), Operation and Maintenance Procedures.

SENIOR PROJECT ENGINEER (12 Feb 2003 –12 Dec 2003)
ARABIAN-AMERICAN INSTALLATION COMPANY, LTD.-Saudi Arabia
RESPONSIBILITIES
• Monitored the progress of the project as per the project plan and against the client’s requirements and take corrective action whenever required.
• Participated in the review of the project planning process and create a schedule, which is in line with the project requirements including establishing the sequence and duration of activities.
• Supported the Project Manager the duties and responsibilities for project management and coordination of Concept Optimization, FEED & EPCM contractors, through Project teams of Senior Project and Project Engineers.
• Coordinated a team of multidiscipline engineers to achieve a cost-effective design through timely resolution of technical and engineering issues.
• Managed the completion progress throughout the project.
• Ensured all relevant As-Built Drawings / Documents are marked up as defined in project As-Built Procedure.
• Coordinated and ensures Project Quality Plans/HSE Plans/Environment Management Plans are in place and adhered throughout the execution phase. Ensures that CLIENT corporate requirements are complied with.

OPERATION & MAINTENANCE SUPERINTENDENT (16 April 2000 –10 Jan 2003)
RFM COMPANY-Philippines (FMCG Fast-moving consumer goods)
RESPONSIBILITIES
• Responsible for driving Production activity through a highly focused team of Operators. Ensures that the team achieves targets and KPI's, with a strong focus on modelling safe behaviour.
• Overall management of staff, production and facility to meet and exceed the production expectations and drive production targets.
• Implemented Just-in-Time (JIT) production methodology to control costs and inventory, resulting in a 20% improvement in efficiency.
• Replaced labour-intense processes while simultaneously enhancing workflow through new technology that reduced staff by 15.
• Led BTR (Batch Trial Run) to improve the qualities of new and old product formulations.
• Led, achieved and demonstrated Total Quality Management (TQM), Continuous Improvement (CI) and Good Manufacturing Practice (GMP).
• Performed Cleaning in Place systems (CPI), to allow cleaning of process equipment without dismantling or manual cleaning with minimal operator involvement.
• Knowledge of food and HACCP (Hazard Analysis and Critical Control Points).
• Executed Aseptic processing which a sterile (aseptic) product is packaged in sterile container.
• Managed processing facilities such as Pasteurisation, Ultrapasteurisation, Ultra-High temperature (UHT) and Homogenisation processes.
• Led and developed the team, rolling out training programs and continuous improvement & LEAN strategies.
• Led large teams 100+ people.

PROCESS CONTROL ENGINEER (26 Nov 1995 –3 March 2000)
(SHELL-SECONDED) WELL TECH SERVICE CORPORATION-Philippines
RESPONSIBILITIES
• Led process control instrumentation, tuning and calibrations for Proportional Control, Proportional Derivative (PD), Proportional Integral (PI), & Proportional Derivative & Integral (PID), Controls.
• Demonstrated knowledge in PLC, DCS and SCADA.

PERSONAL INFORMATION
• Citizenship - Australian
• Civil Status - Married
• Date of Birth - 1976

PERSONAL ATTRIBUTES
• Strong technical and engineering skills as Lead/ Senior Process, Operations, Commissioning or Project Manager/ Superintendent.
• Mentoring and team leadership skills with the ability to mentor and develop site personnel.
• Ability to provide innovation and logical problem solving skills.
• Proven experience in management of people & conflict resolution.
• Strong commitment to safety.
• Strong verbal and written communication skills.
• Excellent planning and organization skills.
• Excellent fault finding skills.

OTHER SKILLS AND INFORMATIONS
• MAXIMO, SAP, MS Office, Work order, Maximo.
• LEAN, GMP standards, JIT HACCP, CPI, OH&S and CI methodology.
• Proficient in HYSYS (ASPHEN), Pro II, PIPESIM, PIPESYS, FlareNet, SMARTPLANT, AutoCAD.
• Flow Assurance-PVTSim, Multiflash (Wax, Asphaltenes, Hydrates and etc.).

Education

Australian Institute of Business
Master of Business Administration

   Jan 2017
— Aug 2017

Master of Business Administration
Project Management - Australian Institute of Business - Adelaide Australia (2016)

University of Western Australia
Postgraduate Diploma in Oil and Gas Engineering

   Jun 2008
— Jun 2011

University of Western Australia
Postgraduate Diploma in Oil and Gas Engineering - Perth Australia (2008 – 2011)

Mapùa Institute of Technology (MIT)
Bachelor of Science in Chemical Engineering

   Jun 1996
— Mar 2000

Mapùa Institute of Technology (MIT)
Bachelor of Science in Chemical Engineering - Philippines (June 1996 – Mar 2000) Top 4, Scholar

Meralco Foundation Institute (MFI)
Industrial Instrumentation and Process Control Technology

   Jun 1993
— Oct 1996

Meralco Foundation Institute (MFI)
Industrial Instrumentation and Process Control Technology - Philippines (June 1993 – May 1996)-Scholar

Experience

BP Plc-BP Australia
SENIOR PROCESS OPERATION ENGINEER

   Oct 2011
— Dec 2016

• Operations Support - provide rapid response to support the CDWG area facilities following incidents or process upsets.
• Experience in facility optimisation/ debottlenecking and generating plans to improve water injection capacity.
• Experience in improving Produced Water handling capacity by trouble-shooting existing surface facilities.
• Accountable for area engineering activities in 6 & 12-week Area Plan.
• Met deadlines consistently on facilities major maintenance/ TAR with concept development, work and detailed planning, execution and close of all major maintenance.
• Trained 5 new younger local employees.
• Lead process & process safety engineering within the CDWG asset providing technical support including; Operations, Maintenance, Projects (Brownfield and Greenfield Development Projects), and Construction on all aspects of process and process safety engineering in CDWG.
• Lead identification of development opportunities through engagements with external stakeholders.
• Liaise with the Brownfield project managers who are undertaking rehabilitation activities to understand the proposed facility upgrades and their likely timing.
• Implement the relevant engineering standards, capture lessons learned through pre- and post-project reviews, and implement quality, and provide support to operations and maintenance for facility upgrades.
• Worked effectively with PMT Members, Contractor, Subcontractors and Vendors engineers to establish and maintain required technical interfaces during the Project.
• Provided process advice and input to other groups and disciplines within the Project including Safety, Electrical, Instrumentation and Control, Mechanical, Construction, Commissioning, Operations and Procurement.
• Advises on engineering activities on existing & proposed facilities. Includes Field Development; Produced water handling/treatment; minimum/zero flaring; Gas/ Artificial lift.
• Close out all outstanding MOC's, EQ's, Traction actions, Maximo and SAP. Proactive to outstanding MOC's, EQ's, ORA's, ISSOW's, Tractions, PEI and others to ensure that they are in compliant and on time.
• Prepares conceptual design or provide advice on process matters which may arise during Operation, commissioning & start-up.
• HSE inputs to support CDWG performance contract including safety audits, Isolation Audits, Safety Observations, Risk assessments, incident investigations etc.
• Member/ leader of Management of Change (MOC), HAZOP, Layer of Protection Analysis (LOPA), Pre-start up safety review (PHSSER), RCFA, Operational Risk Assessment (ORA), Cirrus Consequence Modeling, What-If-Risk Assessment and Incident Investigation.
• Defined standardized Operations Readiness activities for the portfolio of projects.
• Planed and executed Operations Readiness activities in accordance with the Operations Readiness Project Standard and its underpinning process and methodologies.
• Assertively influencing a Project team delivery of a design that will fully satisfy operational requirements (availability, integrity, OPEX and HSE), whilst recognizing project objectives around CAPEX and Schedule
• Asset Integrity - safety critical element and performance standards, safety critical task development.

Ad
Ad
Ad