Mechanical Engineer
Last Updated: 9th June 2017 (over 5 years ago)
Summary
*In-depth knowledge of HVAC Installation like AHU, FCU as per client requirement
*Skilled in handling multiple projects with strong communication skills
*Good knowledge of Providing technical advice to site staff for proper site execution.
Education
Mechanical Engineer
May 2010
— May 2014
During : 2010 TO 2014
Percentage : 72%
Experience
Mechanical Engineer
Feb 2015
— Current
• Assisting Mechanical Draftsman for preparation of shop drawings for submission to consultant for their approval
• Ensure that all HVAC site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan
• Attending every week project progress and coordination meetings with main contractor, sub-contractors, suppliers and consultants.
• Preparation weekly progress reports.
• Installation AHU, FCU as per client requirement.
• To ensure proper implementation of design at site.
• Preparation of Material Submittal Co-ordination of Shop drawings with other services.
• To resolve any unexpected technical difficulties and problems that may arise at any time during the execution of the site.
• Follow up with the Suppliers for Material Delivery on time.
• To oversee the selection and requisition of materials for use in the construction to check whether the material are as specified
• Preparation method of statements for the installation as per project specification and closure of NCR issued by consultant.
• Providing technical advice to site staff for proper site execution.
• Handling of labour force at site for exact utilization of man power for the batter installation of mechanical works.
• To plan, schedule and organise the erection work efficiently in order to meet the site /facilities to an agreed programme of deadlines
HVAC Site Engineer
Jan 2014
— Jan 2015
• To supervise and monitor the site labour force through general foreman and or supervisors, monitoring the work of any subcontractors to complete the works as per customer’s satisfaction.
• To oversee quality and safety matters on the site, and ensure that regulations are adhered to
• Installation AHU, FCU as per client requirement.
• To ensure proper implementation of design at site.
• Equipment Selection as per duty condition.
• Supervision of site works.
• Determining a suitable location for installing vents in each room.
• Valve Package.
• Ensure that all HVAC site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan
• General supervision and inspect the installation, modification of HVAC system at construction site.