General Manager (India) / Commissioning Engineer(Saudi Arabia)


Last Updated: 12th November 2017 (over 5 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
55 to 64

Qualification Level
Degree

Languages
English, Gujarati, Hindi

Summary

Since Graduation, I was working with Reliance Industries Limited (RIL) Company" in INDIA and lastly i was holding post of General Manager in RIL.

I commissioned and Operated successfully Captive Power Plants in RIL for 22 years and thereafter I worked in RIL as "Site Shift Manager" for 10 Years.

Lastly I was working as a commissioning Engineer in "Hyundai Heavy Industries" company at Jeddah- Saudi Arabia till 14th Aug 2017 (2 Years and 3 Months). I commissioned successfully Thermal Power Plant.

In IMS Audit, I have actively participated for 5 years in Reliance Industry Limited as a internal Auditor.

Education

M.S.University of Baroda
Bachelor of Engineering-Mechanical

   May 1983
— Jul 1987

I studied four year part time degree course from recognized university with 70.48%.

M.S.University of Baroda
Diploma in Electrical Engineering

   Jun 1980
— Jul 1981

I studied in Diploma in Electrical Engineering three year regular from recognized university with 55.75 %.

M.S. University of Baroda
Diploma in Mechanical Engineering

   Jun 1977
— Apr 1980

I studied in Diploma in Mechanical Engineering three year regular course from recognized university with 71.81%.

Experience

Hyundai Heavy Industries Limited
Commissioning Engineer-Mechanical

   May 2015
— Aug 2017

Commissioning & Operating of Jeddah South Thermal Power Plant having capacity of 723 MW x 4 Nos. of Steam Turbines and Supercritical water wall Radiant Reheat type) Boiler of Capacity 2260 TPH of each (4 Nos) of and its equipment in the witness of Owner Engineer (OE),
Solving (Closing of disposition in accordance with OE) of problems encountered during the activities.

Reliance Industries Limited
General Manager

   Dec 1982
— Sep 2014

Dec 3, 1982 to May 16, 1988
INDIAN PETROCHEMICALS CORPORATION LIMITED, VADODARA, STATE GUJARAT
Operation of Steam Turbine Generators having Capacity of 18.5 MW each (Two no.)
May 17,1988 to June 07, 1996
RELIANCE INDUSTRIES LIMITED, NAGOTHANE, DIST : RAIGAD, STATE : MAHARASTRA
Commissioning and Operation of FO & Gas based Captive Power Plant having capacity of 85 MW and Steam generation 405 TPH , Pr 108 kg/cm2g and Temp 520 Deg C.
June 8, 1996 to Sept 14, 2014
RELIANCE INDUSTRIES LIMITED, DAHEJ, DIST : BHARUCH, STATE : GUJARAT
Commissioning and Operation of FO& Gas based Captive Power Plant having capacity of 154 MW and Steam generation 540TPH , Pr 108 kg/cm2g and Temp 520 Deg C.
Worked as a Site Shift Manager in Operation Control Group for Controlling Feed stock, Final Product inventory, Maintaining operation of Complex in a safe manner including handling L1, L2 and L3 Emergencies. Worked for Management Information System.