Post Graduate Mechanical Engineer with nearly 7 years of experience


Last Updated: 6th May 2018 (over 4 years ago)

Address
United Arab Emirates

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Masters

Languages
English, Hindi

Summary

A focused and astute Post Graduate Mechanical Engineer with nearly 7 years of experience in Detailed Engineering Design, Project Management and Site completion. Worked on Oil & Gas Projects, Clean-room projects, Commercial & Residential projects.

Education

VJTI Mumbai
Master of Technology- Mechanical

   Jun 2011
— May 2013

MIT College of Engineering, Aurangabad
B.E - Mechanical Engineering

   Jun 2006
— May 2010

Experience

AHI Carrier Fzc
HVAC Engineer

   May 2017
— Apr 2018

Role in the Organization:
• Worked as a Field Engineer on site “Yamal LNG, Arctic Region, Russia”
• Perform the site survey and validate the SIS issued to site.
• SDMs associated to SIS to be prepared and issued to the relevant site sub-contractors which shall include preparation of shop drawings / mark-up drawings.
• To coordinate with client site representative / head office to track the material delivery status associated to the SIS / COW.
• To assist client FE team in answering the site sub-contractor TQs, MARs & DVRs.
• To review site sub-contractor shop / as built drawings for the Shelters.
• To perform site survey based on the approved design drawings and highlight the incomplete works for achieving the mechanical completion.
• To assist commissioning teams in pre-commissioning / commissioning activities.
• To validate all the modifications performed at yard / site and incorporate the changes into as built documentation / as built drawings.
• Preparation of RLM mark-up for As-Built documentation.
• Assist the commissioning team in balancing the air flow and HTF flow.
• Site walk down with client and the commissioning team to validate the HVAC System

AHI Carrier Fzc
Project Engineer

   Jan 2015
— May 2017

Role in the Organization:
• Worked in coordination with Architectural , Structural, Electrical, & Instrumentation sections
• Perform heating and cooling load calculations
• Prepared single line diagram ducting PFD’s and single line diagram piping P&ID’s based on calculation notes indicating the hazardous classification of the modules with room categories of each building
• Selection of equipment’s like AHU’s , Heating Coils as per the required heating KW and Air on and Off temperatures , selection of exhaust fans based on static calculated on ducting pressure drop calculation and required air flow. Following project specifications for equipment supply and reviewing performance curves and efficiency of fans
• Lead a team of PDMS Designers for providing a complete HVAC 3-D model with ducting and piping by using previous experience and my core HVAC knowledge following the site conditions
• Finalized equipment location, duct routing and Pipe routing by coordination with other disciplines to avoid clashes and gave a good design
• Responsible of attending meetings and conducting 3-D model/Design reviews with client and getting approval
• Solving any technical issues/Design issue or issues related to clash with other disciplines by giving a solution acceptable to client by following all the HVAC and project requirements.
• Reviewing and submitting of ducting layout drawings , piping layout drawings and piping isometrics
• Prepared equipment Material Take Off for all modules/Buildings
• Coordinating with equipment vendors for delivering equipment required as per project specification of equipment supply and ensuring the material used for the equipment is as per project standard and suitable for the site conditions
• Preparing equipment General arrangement drawings and equipment datasheets
• Prepared Weight Data sheets for HVAC in each building
• Prepared Ducting pressure drop calculations and piping pressure drop calculations based on duct and pipe isometrics extracted from the 3-D model
• Monitoring Project risk and scope creep to identify potential problems and proactively identify solutions to address
• Handled responsibility of finalizing ducting layout and piping layout drawings.
• Attend weekly meeting with the Russian Design institute and close-out all mechanical related issues
• Responding to technical queries from client
• As per the Red Line Mark-ups received from Yard, Updating the model and related documents
• Supporting and giving the details to commissioning team to prepared Site Inspection Sheet (SIS).
• Supervising correct design as per the finalized 3-D model at yard from engineering side
• Supporting Construction team and responding to queries and visiting yard when required
• Undertook reviews of various engineering ,design activities and provided technical support
• Anchored commissioning activities to ensure completion of work within time and cost parameters by utilizing all the available resources to maximum output
• Delivered projects with high quality engineering by carrying out work as planned and good project execution in a timely manner.

Aseptic Projectss
HVAC Engineer

   Jun 2012
— Sep 2014

Role in the Organization:
• Air Conditioning Cooling Load calculations, Heat Loss calculations following ASHRAE codes.
• Design of the project area as per the client requirement.
• Monitoring all the HVAC work to ensure the work done is in accordance to the approved shop drawings and quality standards.
• Selections of the AHU and Chillers.
• Preparations of specification and Bill of Quantity for procurements.
• Implement ‘Cost Effective Measures’ for Reducing Overall Project cost.
• To assist internally QS and planning department to update HVAC system progress.
• Project documentation and presentation. Preparation of Snag list and follow up
• Worked in coordination with Architectural , Structural, Piping, & Electrical sections
• Site supervision of all HVAC system installation.
• Ensure that all Mechanical site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan
• Close monitoring of daily works, site supervisor's and site staff to do the works in time.
• Inspection and Testing of all systems related to HVAC

Aerocool Engineers
HVAC Engineer

   Jun 2010
— May 2011

Role in the Organization:
• Air Conditioning Cooling Load calculations, Heat Loss calculations following ASHRAE codes.
• Design of the project area as per the client requirement.
• Monitoring all the HVAC work to ensure the work done is in accordance to the approved shop drawings and quality standards.
• Selections of the AHU and Chillers.
• Preparations of specification and Bill of Quantity for procurements.
• Implement ‘Cost Effective Measures’ for Reducing Overall Project cost.
• To assist internally QS and planning department to update HVAC system progress.
• Project documentation and presentation. Preparation of Snag list and follow up
• Worked in coordination with Architectural , Structural, Piping, & Electrical sections
• Site supervision of all HVAC system installation.
• Ensure that all Mechanical site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan
• Close monitoring of daily works, site supervisor's and site staff to do the works in time.