Career Summary:

A Post Graduate Civil Engineer certified as International Professional Engineer under IPEA signed by world member countries having 31 years of total works experience in consultancy supervision of road / building infra projects delivering services with a proven record of supervising, organizing and managing project preparation and construction supervision of major highway / expressway projects (flexible & rigid) & Building Infra Projects.
In course of delivery of my services following professional skills & technical expertise as depicted below have been developed & owned for use during my next assignment.

Project Management: Executed monitoring of the progress of the project works for completion on time through evaluation benchmarked on the approved work program advising the ways of handling the slippages / challenges showing ways forward through implementing a Catch -up Rolling Work Program with micro control through additional increased input of resources, planning & control. For cost optimization, I have implemented value engineering using more effective new design with saving in the project cost & time earning recognition among the stakeholders. Until now, I have saved about 40 M USD in the project cost.

Laisioning & Coordination: Remained focused on client delivery, strong capability & reasonable flexibility to meet the demand of the role, the demonstrated ability to collect data to brief the client on the project issues and to provide resolutions in addition to reviewing & drafting responses to the correspondence. Delivered key services such as preconstruction activities like laisioning & coordination with local authorities for land acquisition, shifting of utilities, Relocation & Rehabilitation of Project Affected Persons (PAPs) & religious structures.

Leadership Skills: I have guided, supervised, coordinated and monitored the works of the team members as well as those of the contractor effectively using inherent delegation, team building, presentation, communication (written & verbal) & interpersonal skills with technical & management excellence. I have developed relationships and engendered trust at all levels of the organization, the client & the contractor.

Construction Management Skills: I have been focused strongly on multi-dimensional aspects of roads and bridge construction methodologies including implementing process control pertaining to laying of pavement layers, asphalt and concrete works, quality control, design review of DPR, checking contractors work program, approval of working & supplementary drawings, pavement design, quantities and costing, evaluation of highway construction materials and design mixes, field and laboratory tests for procurement of materials and after incorporation thereof. I have Demonstrated my ability to make fast decisions & recommendations on significant engineering problems consistent with the requirements of the stakeholders.

Contract Management Skills: I have strong capability to interpret complex contract documents, plans, specifications & shop drawings, to prepare documentation and MIS reporting, to check measurements and contractors bills, to certify interim payment, to prepare of financial statements, to establish the unit rates, and to estimate quantities, to recommend EOT & to check Variation Order Proposals, conducted project closure activities, took part in Dispute Review & Arbitration Boards Proceedings.

Besides the above, with extensive knowledge in modern highway construction technology and contractual arrangements under EPC/BOT/Design & Build mode of Delivery with good command on FIDIC, I am well conversant with relevant IS, BS, ASTM, AASHTO, MOST specifications on road and bridge construction and familiar with implementation of Environmental Management Plan (EMP), traffic management during construction and ensuring quality, safety & hygiene at workplace. I have trained Client’s Engineering staff for Total Quality Management & Contract Management as imbibed in TOR.

Engineering Disciplines: Traffic & Transportation Engineering, Structural Engineering & Construction Management and Geotechnical Engineering.

Technical Tools: I have hand on experience with proficiency in MXROAD, STAAD Pro, AutoCAD-3D, MS Project, Road Estimator, including general application software such as MS Word, MS Excel, MS Power Point etc. required for MIS Reporting.

Accomplishments:

1. Worked as Team Leader for about fifteen years & held positions of Resident (or similar position) about twelve years and Highway Engineer for about four years and worked on projects of varying magnitude under EPC/ BOT / PPP / DB Contract Delivery.
2. Performed key role in fifteen projects of costing equal to / more than US$ 25 M based on ICB for total 15 years of duration to my credit. Got about 19 years of experience of 13 projects of highways construction projects funded by World Bank, Asian Development Bank, JICA & African Development Bank including outside India as Highway Engineer for 2 years in Nepal & as Expatriate Resident Engineer/Team Leader for 4 Years in Oman, for 1 Year in Tanzania & 6.17 years in Ethiopia. I have total International of 12.50 Years out of 10.42 Years as as Expatriate Resident Engineer/Team Leader.
3. Completed consultancy supervision of 667 km two lane, 347 km four lane, 37 km six lane & 13 km eight lane highways with total of 2260 two lane km for Eighteen highway projects costing US $ 866 M in my credit.
4. In Etawah Bypass with SMEC, Project Bonus was awarded to the contractor for early completion by two months under my strict supervision, monitoring & control. In most of the other contract, the work was got finished substantially within time & allocated / approved budget.
5. Reviewed the detailed design & Supervised Infrastructure Development of One Stop Border Post, Moyale at Ethiopia Kenya Border amounting US$18 M on Design & Build Contract Delivery.
6. Designed Four Storeyed framed office building of Coal Mines Development Authority, Dhanbad, India & Delhi PWD School Building at New Delhi.
7. Designed Highway Tunnel across Sholding Slide in Himachal Pradesh.
8. Reviewed the Design and supervised the construction of Reinforced Earth Wall- 165700 Sqm
9. Maintenance of existing road & traffic regulation & Control-843 km
10. Completed Consultancy supervision of construction & maintenance of detours / diversion road-700 km
11. Completed Design Review of 1543 km of roads
12. Finalized & Submitted Works & Service Contract Completion Reports-15 Nos
13. Finalized & Submitted Operation & Maintenance Manual-4 Nos
14. Trained Employer’s personnels-17 Nos for professional developments
15. Finalized & submitted QA/QC Manual-15 Nos
16. Finalized & submitted Project Implementation Manual / Supervision Manual - 15 Nos
17. Complete Internal Audit of the highway projects-11 Nos
18. Got executed - 7 Water Bore Well Community Water Supply Points, 16 temples, Gender Sensitization Program, STD, AIDS & HIV Alleviation Program for five projects.
19. Got redevelopment of Borrow Area / Quarry sites done-373 Nos
20. Finalized Detailed Project Report for Civil Works of four road projects in Oman, Submitted bid documents for Tendering & Assisted in bid evaluation in Oman.
21. Got completed in time Pipe Culvert-873 Nos, 364 Nos Box/Slab Culverts, Minor Bridge (up to 30m span)-26 Nos & Major Bridge (Span up to 750m) - 06 Nos, Underpass-33 Nos, Railway Over Bridge -5 Nos and 58 Commercial / Residential Buildings / Cultural Buildings.
22. Supervised construction of RCC Retaining Wall - 53 km, 3 to 5m height.
23. Supervised the construction of Three Highway Tunnels in Ethiopia.
24. Prepared Consultancy Bid Proposal (both technical & financial) - three Nos, which were awarded finally.
25. I have completed four O & M projects, three BOT Projects & six Feasibility / DPR Projects.

Education

Indian Institute of Technology, Delhi, India.
Certificate in Project Management

   Dec 2014
— Feb 2015

Government Engineering College, Jabalpur under R D University, Jabalpur, India.
M Eng. in Civil Engineering with specialization in Geotechnical Engineering

   Aug 1990
— Apr 1992

Bihar Institute of Technology, Sindri, Dhanbad, India under Ranchi University, Ranchi.
BSc Engg (Civil)

   Aug 1983
— Feb 1988


Certifications & Memberships

• International Professional Engineer (India)-IntPE-IP8000852 May-2019 under IPEA signed by member Countries.
• Professional Engineer (India)-PE7001806, Jan-2019.
• Chartered Engineer [India] License No-028233 Jan-2015.
• Fellow Member of Institution of Engineers (India) – F-120241-5. Sep. 2015
• Life member of India Society for Rock Mechanics & Tunneling Technology- LM1031 1995
• Member of Indian Geotechnical Society-LM 2225. Sep. 2004
• Member of Indian Road Congress - LM 29865. Sep. 2004
• Empaneled as Assessor on behalf of National Accreditation Board for Laboratories (Testing & Calibration), Ministry of Science & Technology, Government of India -I-4(5)/95-ET dated 25-06-1998.


Trainings, Scholarships and Awards

• Training for Project Management in April 2000 organized by National Institute for Training of Highways Engineers (NITHE) & Sponsored by NHAI.
• Training as Assessor for accreditation of testing & calibration laboratories by Ministry of Science & Technology, Govt of India in April 1998.
• Training by Consultancy Development Centre, Govt of India in September 1999 for quality auditing.
• Training for Project Implementation ADB assisted Rural Road Sector –I Project (Loan No:2018 IND) through a workshop on Construction Management at SIRD Nimora (Raipur) organized by The Louis Berger Group, INC in association with Hifab International AB, Sweden sponsored by National Rural Road Development Agency.
• Training as Project Manager by IIT Delhi November-2014.
• Scholarship during Master of Engineering by Ministry of Human Resources, Government of India through GATE
• Merit Scholarship throughout from Standard-VIII up to BSc Egg (Civil).

Experience

Renardet SA
Expatriate Resident Engineer / Team Leader

   Dec 2019
— Current

Name of assignment or project: Design Review and Construction Supervision of Robe-Gasera-Ginir Road Project on Design & Build Basis, Road Length: 60.000 km (51km-2Lane & 9 km 4 Lane), Funded by: The Federal Democratic Republic of Ethiopia, Project Lump Sum Cost: US$: 28.00 M, Asphalt Concrete Pavement; Pipe Culvert-44 No; Box/Slab Culvert-20 No; Minor Bridge- 2 No (20m & 40m Clear Span); Terrain-Plain/ Rolling; Location: Ethiopia Client: Ethiopian Roads Authority Main project features: Design Review, Construction Supervision and contract administration. Positions held: Expatriate Resident Engineer / Team Leader.

Activities performed: Executed overall design review and construction supervision of road/structure/drainage, planning, construction management, quality control of materials, ensuring site safety during construction, identification and procurement of materials for construction, statistical quality control of all laboratory testing of soil, bituminous works and concrete, preparation of Job mix formula, mix design, control of batching pants, setting up and operation of laboratory, supervise the testing of materials and analysis and interpretation of test results and quality control as per specifications. As Resident Engineer, ensured the quality of all construction works of Contractor. Implemented various Standards/ Specifications, Contract Procedure, design etc. checked & approved methodology, day-to-day construction supervision including monitoring physical and financial progress of works, implemented FIDIC-1995 for DB Contract System and administered the Contract as per FIDIC Contract Conditions, served Contractual Notices, finalized cash flow & Price adjustment, scrutinized/ checked/ certified of Advances/ Interim Bills/ Invoices, Evaluated of Extra Item of Works and recommended Variation Order proposals, issued Site Instructions & Non-compliances, Got operated & maintained existing road, Settled Claims as well as disputes against the client to avoid arbitration. In addition, looked after all the administrative aspects of the project & resolved removal of ROW obstructions within specified time.

LEA Associates South Asia Pvt. Ltd
Expatriate Resident Engineer / Team Leader

   Jul 2016
— Nov 2018

Name of assignment or project: Design Review and Construction Supervision of Mombasa-Nairobi-Addis Ababa Road Corridor Phase II Contracts: Lot 3: Mega-Moyale Road Project, Road Length: 109.36 km (30 km 4-lane & 79 km 2-lane), Pipe Culvert-129 No; Box/Slab Culvert- 60 No; Terrain-Plain/Rolling-99.36 km & Mountainous-10 km; Funded by: African Development Bank Fund, Project Cost: US$: 47.00 M, Asphalt Concrete Pavement, Location: Ethiopia, Client: Ethiopian Roads Authority
Main project features: Design Review, Construction Supervision and Contract Administration. Positions held: Expatriate Resident Engineer / Team Leader.

Activities performed: Executed overall design review and construction supervision of road/structure/drainage, planning, construction management, quality control of materials, ensuring site safety during construction, identification and procurement of materials for construction, statistical quality control of all laboratory testing of soil, bituminous works and concrete, preparation of Job mix formula, mix design, control of batching pants, setting up and operation of laboratory, supervised the testing of materials and analysis and interpretation of test results and quality control as per specifications.

Supervised the construction of One Stop Border Post at Ethiopia-Kenya Border, with all the facilities i.e. Check post, Custom Clearance Immigration facilities, Truck parking lots etc. The main Contractor has hired a sub-contractor to construct the border check post including the houses, drainage, truck parking, electrical, mechanical and electronic works. As Resident Engineer, ensured the quality of all construction works of Contractor. Implemented various Standards/ Specifications, Contract Procedure, design etc. checked & approved methodology, day-to-day construction supervision including monitoring physical and financial progress of works, implemented FIDIC – Pink Book and administered the Contract as per FIDIC Contract Conditions, processing Contractual Notices, cash flow preparation, Price adjustment aspects, scrutinizing/ checking/ certification of Advances/ Interim Bills/ Invoices, Evaluation of Extra Item of Works and recommendation for Variation Orders, Site Instructions, Got operated & maintained existing road, Settlement of Claims, Arbitration matters concerning various types of Project Disputes and liaised with local administration and client for removal of ROW obstructions. Also, looked after all the administrative aspects & closing of the project after final acceptance.

LEA Associates South Asia Pvt. Ltd
Expatriate Resident Engineer / Team Leader

   Jul 2016
— Nov 2018

Name of assignment or project: Feasibility Studies / Concept Design Design Review and Construction Supervision of Infrastructure Development of One Stop Border Post, Moyale at Ethiopia-Kenya Border amounting US$18 M on Design & Build Basis, Road Length: 9.33 km (2 km 4-lane & 7.33 km 2-lane), Funded by: African Development Bank Fund, Project Cost: US$: 28.00 M, Asphalt Concrete Pavement & Rigid Pavement- RCCP & JRCP, 19 No Buildings, MEP Works, 1 No Bridge-6 Lane (20m Clear Span on Moyale River), One Underpass-1 No (14m Clear Span for lane changing); Pipe Culvert-4 No; Box/Slab Culvert-6 No & other miscellaneous works; Terrain- Pain/Rolling-7.33 km & Mountanous-2 km; Location: Ethiopia, Client: Ethiopian Roads Authority, Main project features: Feasibility Studies / Concept Design, Design Review, Construction Supervision and contract administration. Positions held: Expatriate Resident Engineer / Team Leader.

Activities performed: This project comprised of the components-

Main Campus at Ethiopia Kenya Border:
7.33 km of Asphalt Road, 2 km (4-lane) -RCCP/JRCP Rigid Pavement in Inspection Zone of Verification Building, Working Area of Verification Booth (4-Lane), Unloading / Loading Zone in front of Warehouse, Warehouse Parking, Impounded Goods Parking, Building Infrastructure- Terminal Building, Verification Buildings, Warehouse Building, Impounded Goods Building, Immigration Booth, Animal Holding Building, Dog Kennel Building, Generator House at Ethiopia Kenya Border, Bus Stops-2 Nos, Guard post Building-2 No (each at entry & exit), Stone Masonry Compound Wall at Ethiopia-Kenya Border)-500m, 1 No Underpass (14m Clear span) for lane changing from Left Handed Driving in Kenya to Right handed Driving in Ethiopia, Six Lane Bridge- 20m clear span, Retaining Wall-1.6 km 2-5m high, MEP Works, Drainage arrangements (combination of RCC drain, culverts & outfall structure), CCTV Surveillance System, Campus Lighting Arrangements (High Mast & Street lights), Landscaping & Water Supply Arrangements of Main Campus of One Stop Border Post at Ethiopia Kenya Border.

Holding Ground at 10 km from Ethiopia-Kenya Border towards Addis Ababa (Size-250mx250m):
In addition to the above the facility at Holding Ground comprised of Asphalt Road Construction of internal roads- 1 km, Buildings Infrastructure - Traffic Post Building, Information Centre, Generator House Building, Ablution Block Building-2 No (each at entry & exit), Shops-3 No, Restaurant-1 No, Vehicle Service Centre Building, Filling Station, Administration & Weigh Bridge Building, Police Building, Commercial Building, Fire Fighting Building, Incinerator Building, Stone Masonry Compound Wall (3m high)-500 m long, Wire Fencing of compound-500m, MEP-Works, Drainage Arrangements of the campus, CCTV-Security Control, Campus Lighting Arrangements (High Mast & Street Light). Gantry Sign Board-1 No, Truck Parking in 10 Bays constructed with High Grade Concrete Paver Block Pavement Landscaping & Water Supply Arrangements.

Executed the feasibility study & issuance of the Concept Drawings for final designing of various components of OSBP, overall design review and construction supervision of the above component of the works, planning, construction management, quality control of materials, ensuring site safety during construction, identification and procurement of materials for construction, statistical quality control of all laboratory testing of soil, bituminous works and concrete, preparation of Job mix formula, mix design, control of batching pants, setting up and operation of laboratory, supervised the testing of materials and analysis and interpretation of test results and quality control as per specifications.

Supervised the construction of One Stop Border Post at Ethiopia-Kenya Border, with all the facilities i.e. Check post, Custom Clearance Immigration facilities, Truck parking lots etc. The main Contractor had hired a sub-contractor to construct the border check post including the houses, drainage, truck parking, electrical, mechanical and electronic works. As Resident Engineer, ensured the quality of all construction works of Contractor. Implemented various Standards/ Specifications, Contract Procedure, design etc. checked & approved methodology, day-to-day construction supervision including monitoring physical and financial progress of works, implemented FIDIC – Pink Book and administered the Contract as per FIDIC Contract Conditions, processing Contractual Notices, cash flow preparation, Price adjustment aspects, scrutinizing/ checking/ certification of Advances/ Interim Bills/ Invoices, Evaluation of Extra Item of Works and recommendation for Variation Orders, Site Instructions, Got operated & maintained existing road, Settlement of Claims, Resolved of Project Disputes and liaised with local administration and client for removal of ROW obstructions. Also, looked after all the administrative aspects & closing of the project after final acceptance.

LEA Associates South Asia Pvt. Ltd
Expatriate Resident Engineer / Team Leader

   Jul 2015
— Jun 2016

Name of assignment or project: Design Review and Construction Supervision of Upgrading of Kia Mererani Road to Bitumen Standard, Road Length: 26km (Two Lane with paved shoulder-23km+3km 4-lane), Funded by: National Funding from The United Republic of Tanzania, Project Cost: US$: 13.53 M, Pipe Culvert-29 No; Box/Slab Culvert-4 No; Location: Tanzania, Client: Tanzania National Road Agency (TANROADS), Main project features: Design Review, Construction Supervision and contract administration, Positions held: Expatriate Resident Engineer / Team Leader

Activities performed: Executed overall design review and construction supervision of road/structure/drainage, planning, construction management, quality control of materials, ensuring site safety during construction, identification and procurement of materials for construction, statistical quality control of all laboratory testing of soil, bituminous works and concrete, preparation of Job mix formula, mix design, control of batching pants, setting up and operation of laboratory, supervise the testing of materials and analysis and interpretation of test results and quality control as per specifications. Implemented various Standards/ Specifications, Contract Procedure, design etc. checked & approved methodology, day-to-day construction supervision including monitoring physical and financial progress of works, implemented FIDIC – Pink Book and administered the Contract as per FIDIC Contract Conditions, processing Contractual Notices, cash flow preparation, Price adjustment aspects, scrutinizing/ checking/ certification of Advances/ Interim Bills/ Invoices, Evaluation of Extra Item of Works and recommendation for Variation Orders, Site Instructions, Got operated & maintained existing road, Settlement of Claims, Arbitration matters concerning various types of Project Disputes and liaisoned with local administration for removal of ROW obstruction. Also, looked after all the administrative aspects of the project

Louis Berger Group INC
Sr. Highway Cum Pavement Engineer / Resident Engineer

   Jan 2013
— Jun 2015

Name of assignment or Project: Design Review & Construction Supervision of New Four Lane Agra Bypass Connecting km 176.800 of NH-2 to km 13.030 of NH-3 in the State of Uttar Pradesh (Contract Package. NS-1/UP-1 & 1A), Length: 32.8 Km (4-Lane); 12km Slip / Service Road, Flexible Pavement, Pipe Culvert- 27 No; Box/Slab Culvert-17 No; Underpass-9 No; ROB-3 No; Flyover-3 No; Major Bridge -1No (70 m Span); Terrain-Plain/Rolling; Project Cost: US$ 84.61 M, Funded by: National Highways Authority of India , Asphalt Concrete Pavement, Urban Environment Project, Location: India, Client: National Highways Authority of India, Main Project features: Construction Supervision and contract administration, Position held: Resident Engineer.

Activities performed:
As the project is a by-pass of Agra town, I delivered the services for Community Consultation, Land acquisition, co-ordination with multiple agencies for relocation utilities. I also supervised multiple-contractor for utility shifting i.e. Electrical pole shifting, water pipeline shifting, sewage pipeline shifting, relocation of optical fiber cable of telephone lines etc.
I did construction supervision of the project stretch and coordinated with all agencies. In addition, implemented activities, review of all designs/drawings, ensured execution of works on site as per specification and standards, contract management as per FIDIC conditions of contract, undertook project site visits and guided, supervised, coordinated and monitored the work of other experts of the team. Also, regulated the construction processes i.e. various roadwork activities and structural/drainage works, approval/review of construction work program methodology, preparation of Supervision Manual & Quality Control Manual, implementation of Safety Plan & EMP of the project, issuing working drawings, approved mix designs of concrete and bitumen courses submitted by the contractor, monitored and check day to day quality control of works, issued change of scope, preparation & status of both physical and the financial progress of works as per schedule against actual. Provided advice to the contractor on project planning activities and optimum use of resources through project management software of MS Project and evolved an operation & maintenance manual for the project. Checked IPCs of the project and recommended for payments, coordinated between Client & Contractor, analyzed extra Item of works and recommended for Variation Orders approval, Got operated & maintained existing road, gave training to client staffs, assisted in dispute resolution and arbitration, issued Contractual Notices, assisted in resolving settlement of Claims, progress monitoring, preparation of progress reports, conducting site meetings etc. I looked after all Technical and Administrative aspects of the project.

Louis Berger Group INC
Resident Engineer

   Oct 2010
— Jan 2013

Name of assignment or project: Project Management Consultancy Services (Construction Supervision) or 6 Lanning of Gurgaon – Kotputli- Jaipur Section of NH – 8 from Km 144.770 to Km 181.300 in State of Haryana & Rajasthan to be executed under Build, Operate, Transfer (BOT Toll) Project on DBFO Pattern under NHDP Phase – V, (Package No: 04), Length: 37.06 Km, Flexible Pavement, Pipe Culvert- 29 No; Box/Slab Culvert-11 No; Underpass-11 No; Flyover-2 No; Viaduct- 13 No; Terrain-Plain/Rolling; Project Cost: US$ 174 M, Asphalt Concrete Pavement, Urban Environment Project, Location: India, Client: Pink City Expressway Pvt. Ltd, India, Main Project features: BOT (TOLL) on DBFO Construction Supervision and contract administration, Position held: Resident Engineer

Activities Performed: As the project is passing through the Gurgaon town, which is very close to National Capital of India, Delhi, I delivered my services for community consultation, Land acquisition, and coordination with multiple agencies for relocation utilities. I supervised multiple-contractor for utility shifting i.e. Electrical pole shifting, Water pipeline shifting, sewage pipeline shifting, relocation of optical fiber cable of telephone lines etc. I rendered services for design review of highway alignment, pavement design, and bridge. Also, executed my responsibility for approval of source of construction materials, modification of BOQ’s as per recommendation of design review and preparation of additional technical specifications and implementation of CA on behalf of the concessionaire, construction supervision of the project stretch and coordination with all agencies. Got executed flexible pavement right from earthwork to various other pavement layers i.e. GSB, WMM & BT layers. Also executed my responsibility for implementation activities, safety management, review of all Designs/Drawings of road/bridge/drainage prepared other than DPR, ensuring execution of works on site as per specification and standards, undertook project site visits and guided, supervised, coordinated and monitored the work of other experts of team. Regulated the construction processes i.e. various roadwork activities and structural works, approval and review of construction work program methodology, ensuring proper traffic management measures and safety norms, issuing working drawings, approving mix designs of concrete and bitumen courses submitted by EPC contractor, monitoring and checking day to day quality control of works, preparation of interim certificate for monthly payments, preparation of monthly progress report, preparation & monitoring of both the physical and the financial progress of works as per schedule against actual. accompanying IE on their monthly inspections. I was in-charge of the construction supervision of project stretch and coordinated with all other experts of the construction projects. Provided advice to the EPC contractor on project planning activities and optimum use of resources through project management software of MS Project and evolved an operation & maintenance manual for the project ensuring Safety & Environment Safeguards of great concern to them. I did Operation & Maintenance of the existing road properly during the construction.

Louis Berger Group INC
Resident Engineer

   Jan 2010
— Oct 2011

Name of assignment or Project: Design Review &Construction Supervision for Widening and Strengthening of Ranital-Kotla section of SH-23, Dramman to Sihunta Section of SH-43, Bhawarna to Lambagaon section of SH-39 in the state of Himachal Pradesh under FIDIC Conditions of Contract, 2 Lane: Flexible Pavement (Asphalt Concrete Pavement),& Rigid Pavement; Length: 153 Km, Minor Bridge-2 No; Major Bridge-1 No; Pipe Culvert- 63 No; Box/Slab Culvert-22 No; RCC Retaining Wall-24km, Breast Wall-35km, Gabion Wall-5km, Bus Bays-12 No, Truck Parking-3 No; Terrain-Mountainous; Project Cost- US$ 34 M, FIDIC Conditions of Contract, Urban Environment Project, Location: India, Client: Himachal Pradesh Road Infrastructure Development Corporation, Govt. of Himachal Pradesh, Main project features: Construction Supervision and contract administration, Position held: Resident Engineer

Activities performed: As the project is passing through the town like 1) Ranital, 2) Kotla, 3) Dramman, 4) Sihunta, 5) Bhawatna and 6) Lambagaon, I delivered my services for community consultation, land acquisition, co-ordination with multiple agencies for relocation utilities. Also, supervised multiple-contractor for utility shifting i.e. electrical pole shifting, water pipeline shifting, sewage pipeline shifting, relocation of optical fiber cable of telephone lines etc. Executed my responsibility for construction supervision of the project stretch and coordination with all related agencies. Also executed Contract Management based on FIDIC Conditions of Contract, implementation activities, review of all designs/drawings, ensuring execution of works on site as per specification and standards, undertaking project site visits and guiding, supervising, coordinating and monitoring the work of other experts of team. Regulated the construction processes i.e. various roadwork activities and structural/drainage works, approval/review of construction work program methodology, preparation of Supervision Manual & Quality Control Manual, implementation of Safety Plan & EMP of the project, issuing working drawings, approval of mix designs of concrete and bitumen courses submitted by the contractor, monitoring and checking day to day quality control of works, issuing change of scope, preparation & monitoring of both physical and the financial progress of works as per schedule against actual. Provided advice to the contractor on project planning activities and optimum use of resources through project management software of MS Project and evolved an operation & maintenance manual for the project. Rendered Checking of IPC of contracts and recommending for payments, coordination between Client & Contractor, analysis of extra Item of works and recommendation for Variation Orders, on job-training to client staff, dispute resolution and attending arbitration proceedings, issuing Contractual Notices, Settlement of Claims, progress monitoring, preparation of progress reports, conducting site meetings etc. Got operated & maintained existing road, I looked after all Technical and Administrative aspects of the project.

Louis Berger Group INC
Resident Engineer

   Jun 2008
— Dec 2009

Name of assignment or project: Independent Engineer (Construction Supervision) services for Design, Construction, Development, Finance, Operation and Maintenance of 8 Lane Access Controlled Expressway under Phase - II A, Programme as on extension of Phase - I of Outer Ring Road, Hyderabad for the Package from Bongulur to Tukkuguda from km 108.00 to km 121.00 (Project No.ORR/PH-IIA/BOT/AP-4) on BOT (Annuity) basis, Length: 13 Km, Service Road (2-lane)-26km; Flexible Pavement (Asphalt Concrete Pavement), Pipe Culvert- 13 No; Box/Slab Culvert-6 No; Underpass-6 No; Terrain-Plain/Rolling Project Cost: US$ 102 M, Funded by: JICA, Urban Environment Project, Location: India, Client: Hyderabad Growth Corridor Ltd., India, Main project features: Design Review, Construction Supervision and contract administration, Position held: Resident Engineer

Activities performed: As the project is a Ring Road of Hyderabad town, I delivered my services for community consultation, land acquisition, co-ordination with multiple agencies for relocation utilities. Also, supervised multiple-contractor for utility shifting i.e. Electrical pole shifting, Water pipeline shifting, sewage pipeline shifting, relocation of optical fiber cable of telephone lines etc. Executed my responsibility for review of designs & drawings of highways & pavement, bridges/ culverts/ drainage structures, construction supervision, contract management as per Concession Agreement, safety management. Being in-charge of the construction supervision of project stretch and coordinating & regulating the activities of other experts of the construction projects and I reported the problem areas pertaining the officers of PIU for smooth functioning of the construction package. Also, regulated the construction process i.e. all activities like earth-work in large quantities, sub-base/base courses, concrete pavement, bituminous pavement, bridge/culvert works proposed for being carried out under Stipulated specifications/manuals etc., approving construction methodologies, reviewing contractor’s work program, establishment of plant & equipments, preparation of Supervision and Quality Assurance Manual, implementing EMP/Safety Plan of the project, inspecting the field laboratories & carrying out sample tests on materials, design mixes and introducing quality control check with latest lab equipment. Dealt directly with other support engineer/personnel to ensure that the established quality control system was stringently followed and the construction process was well controlled as per specification. Coordinated with Material Engineer for ensure smooth functioning of the construction package. Examined Concessionaire’s Change of Scope, updates of project cost, assigned responsibilities and monitored Consultant’s staff activities. Reviewed O&M Manual, Safety, Traffic and Environmental Management Plan of EPC Contractor. Continuously interacted and coordinated with EPC Contractor, Concessionaire and Client on the progress and quality of the works and undertook project site visits, approved of As-Built Drawings. Also, executed my responsibility for maintenance of the existing road, Assisting in land acquisition, tree cutting, utility shifting etc. Got operated & maintained existing road. I used my knowledge & expertise of latest standards/specifications, contract procedures, design and quality control & international construction practices.

SMEC International Pty Ltd
Resident Engineer

   Jun 2007
— Jun 2008

Name of assignment or project: Design Review & Construction Supervision of Chhattisgarh State Road Sector Development Project Rajim Package 84 km (32 km four lane & 52 km Two Lane) State Highway, Pipe Culvert- 44 No; Box/Slab Culvert-19 No; Minor Bridge-2 No; Major Bridge-1 No; Terrain-Plain/Rolling; Flexible & Rigid Pavement; NCB, Funded by Asian Development Bank, Cost- 40 M USD, Location: India, Client: Chhattisgarh State Road Development Corporation, Main Project features: Construction Supervision and contract administration, Position held: Resident Engineer

Activities performed: Executed the tasks in compliance to TOR similar to that described above as in the case of previous employer with some changes as depicted below, Exercised 10 % of check measurements, Checked & recommended VOP submitted by the contractor, Approved Clause 14.1 Work Program. Got operated & maintained existing road by the contractor.

SMEC International Pty Ltd
Resident Engineer

   Jun 2006
— Jun 2007

Name of assignment or project: Design Review & Construction Supervision of Balance Works of Etawah Bypass (14-km Stretch-4 lane with addition of 22 km two lane service / slip road along the project road) of NH-2, under Golden Quadrilateral Scheme of NHDP; Pipe Culvert- 11 No; Box/Slab Culvert-09 No; Underpass-03 No; ROB-1 No; Flyover-3 No; Terrain-Plain/Rolling Cost-1463 M INR / US$- 25M in Uttar Pradesh (India), NCB, Funded by Government of India, Location: India, Client: National Highways Authority of India, Main Project features: Construction Supervision and contract administration, Position held: Resident Engineer.

Activities performed: Executed the tasks in compliance to TOR similar to that described above as in the case of previous employer with some changes as depicted below, Exercised 25 % of check measurements, Checked & recommended VOP submitted by the contractor, Evaluated and recommended the Extension of Time & approved Clause 14.2 Work Program,
Prepared the completion report of the project. Attended the Dispute Review & Arbitration Tribunal Meetings. Got operated & maintained existing road.

LEA Associates South Asia Pvt. Ltd
Expatriate Resident Engineer / Team Leader

   Feb 2005
— Jun 2006

Name of Assignment or Project: Detailed Engineering, Design Review, Tender Document Preparation (Phase-I) and Construction Supervision (Phase-II) of the Civil Works for Addis Ababa–Woldiya Road (2 Lane Paved Shoulder) Rehabilitation Project, Lot 1: Addis Ababa – Tarmaber Tunnel (173 km); 2-lane-141km; 4-lane-32km FIDIC Based, Bituminous Standard, (Civil Contract –I), Client: Ethiopian Roads Authority, Location: Ethiopia, Asphalt Concrete Road, Pipe Culvert- 153 No; Box/Slab Culvert-35 No; Minor Bridge-2 No (Span-14m &17m); RCC Retaining Wall- 2km; Gabion-1km; Terrain-Plain/Rolling-133m Mountainous-40m; Project Cost: US$ 164.74 million, ICB, Funded by World Bank. Main Project Features: Detailed Engineering Design Review and Construction Supervision, Position held: Expatriate Resident Engineer / Team Leader.

Activities Performed: I Worked 7 months for design, project preparation, finalization of tender documents & assistance to ERA in bid evaluation.

Remaining 12 months I Delivered my responsibilities for design review and construction supervision of road/drainage structure, contract management, review sufficiency of design drawings, documents and specifications, administering the contract as per FIDIC conditions, regular inspection and supervision, review and certification of contractor’s payment certificates, advice on contract changes / variations, analysis and recommendations on contractor’s claims, review traffic safety and implementation of approved Environment Management Plan, approve/monitor of project safety compliance, on-job training to selected staff of the client, organizing review meetings and site visits, permanent record of documentation and correspondences, maintain site dairies etc. Guiding Responsibilities included construction supervision, contract management, review sufficiency of design drawings, documents and specifications, administering the contract as per FIDIC conditions, regular inspection and supervision, review and certification of contractor’s payment certificates, advice on contract changes / variations, analysis and recommendations on contractor’s claims, review traffic safety and implementation of approved Environment Management Plan, approve/monitor of project safety compliance, on-job training to selected staff of the client, organizing review meetings and site visits, permanent record of documentation and correspondences, maintain site dairies etc. Guiding the contractor in preparation of resource based Master Works plan, reviewing and approving the same. Liaison with Regional Authorities and Administration Officers for removal of utilities and ROW clearance. Checking the preconstruction activities and contractors’ preparedness to execute the planned works. Preparation of Reports. Monitoring the progress with respect to the planning and checking the quality of Work. Assessing the problems and bottlenecks and advising contractor on necessary controls for improving progress and quality of Works.

Intercontinental Consultants & Technocrats Pvt Ltd
Expatriate Resident Engineer / Team Leader

   Nov 2003
— Feb 2005

Name of assignment or Project: Design review and construction supervision of Butajira-Hossana-Sodo Road Upgrading Project (Contract 3: Hossana - Sodo), - Road Development Program Support Project; section from km. 215.000 to km. 301.643 of the main road and km. 0.00 to km. 6.703 of Sodo Link Road, Project Length- 93.34 km, Flexible Pavement, DBDT, Four lane in Town Section: 30km; Two Lane in Rural Aeas-63.34 km; Plain/ Rolling Terrain, Pipe Culvert- 73 No; Box/Slab Culvert-23 No; Minor Bridge-1 No (Span-19m); RCC Retaining Wall- 1km; Gabion-1km; Project Cost: US$ 29 M, ICB, Funded by: African Development Bank, FIDIC Conditions of Contract, Location: Ethiopia, Client: Ethiopian Roads Authority, Main Project features: Construction Supervision and contract administration, Position held: Expatriate Resident Engineer / Team Leader

Activities performed: The project envisaged rehabilitation / upgrading / reconstruction of Hossana-Sodo section from km. 215.000 to km. 301.643 of the main road and km. 0.00 to km. 6.703 of Sodo Link Road for providing two lane Double Bituminous Surface Treated (DBST) carriageway with 1.5 m shoulders on either side in open areas of flat and rolling terrain. All horizontal curves and the stretches having gradient more than 5% were to be provided surfaced shoulders. Villages and town areas were also to have 2.5m wide surfaced shoulders. The town of Areka had a divided 2-lane carriageway.

Executed project based on FIDIC Conditions of Contract. Rendered construction supervision of the project stretch and coordinated with all agencies. In addition, I executed my responsibility for implementation activities, review of all designs/drawings, ensuring execution of works on site as per specification and standards, undertaking project site visits and guiding, supervising, coordinating and monitoring the work of other experts of the team. Regulating the construction processes i.e. various roadwork activities and structural/drainage works, approval/review of construction work program methodology, preparation of Supervision Manual & Quality Control Manual, implementation of Safety Plan & EMP of the project, issuing working drawings, approval of mix designs of concrete and bitumen courses submitted by the contractor, monitoring and checking day to day quality control of works, issuing change of scope, preparation & monitoring of both physical and the financial progress of works as per schedule against actual.

I delivered my services for Community Consultation, land acquisition, co-ordination with multiple agencies for relocation utilities. I supervised multiple-contractor for utility shifting i.e. Electrical pole shifting, Water pipeline shifting, sewage pipeline shifting, relocation of optical fiber cable of telephone lines etc. I provided advice to the contractor on project planning activities and optimum use of resources through project management software of MS Project and evolved an operation & maintenance manual for the project. I executed my overall responsibility for all Technical and Administrative aspects of the project. Also rendered checking of IPCs of the project and recommended for payments, coordinated between Client & Contractor, analyzed of extra Item of works and recommended for Variation Orders, gave training to client staff, resolved disputes and attended arbitration tribunal proceedings, issued Contractual Notices, Settled Claims, monitored progress, prepared progress reports, conducted site meetings. Got operated & maintained existing road.

Intercontinental Consultants & Technocrats Pvt Ltd
Team Leader Cum Senior Materials Engineer

   May 2002
— Oct 2003

Name of Assignment: Kerala State Operation & Maintenance (Rolling), Quality Audit & Construction Supervision Project, (Project Cost: Rs. 800 M / US$- 14M) (FIDIC based Contract) NCB, World Bank (IBRD) Aided, Length:87 km (30 km 4-lane + 57 km 2-lane); Pipe Culvert-33 No, Box/Slab Culvert-18 No, Minor Bridge- 1 No (Span-21m), Major Bridge- 1 No (Span-550m), RCC Retaining Wall-1 km, Location: India, Client: Kerala State Government, PWD, Main Project features: Technical Assistance Position held: Team leader Cum Senior Materials Engineer,

Activities Performed: Assessed the adequacy of the proposed maintenance (Periodic & Regular) with due consideration of Operation & Maintenance Manual of the Project as well as actual site condition; advised to the contractor innovative & advanced techniques for cost & performance effective maintenance; collected data to prioritize maintenance activities by conducting surveys; controlled site operations; implemented contractual requirements & quality control of materials & quality of workmanship; guided contractor for setting up of Plant & Machinery at site; measured performance of the contractor by keeping proper records; certified interim certificates for payment to the contractor.

Intercontinental Consultants & Technocrats Pvt Ltd
Officiating Team Leader / Materials Engineer

   Mar 2000
— Apr 2002

Name of Assignment: Fourlaning of Unnao to Kanpur CH-69 to CH-85; Contract Package-EW/3 (UP) NH-25, National Highway Authority of India (Project Cost: INR 399 M / US$- 8M), NCB, Length-16km (4-lane); Pipe Culvert-11 No, Box/Slab Culvert- 9 No, Minor Bridge-1No (Span-19m) Funded by Government of India, Location: India, Client: National Highway Authority of India, Main Project features: Construction Supervision and contract administration, Position held: Officiating Team Leader - cum Materials Engineer.

Activities Performed: Worked as officiating Team Leader (Engineer’s Representative) throughout the tenure on this project as delegated by NHAI (GM Tech) letter no- NHAI/Tech/11014/3/99. Since there was no position of Resident Engineer and the Team Leader could not be mobilized, I worked as overall in charge of the project. As a Team Leader exercised checking contractor’s work program, reviewed of detailed designs and quantities, approved working drawings as per the specifications of contract agreement, supervised laying of pavement, approved design mixes, quality management system for earthwork, Granular Sub Base, Wet Mix Macadam, Dense Bituminous Macadam & Bituminous Concrete Works, verified measurements and certified Interim Payments Certificates. The project had also involved a number of CD structures major & minor bridges. Liaisoned with local government, client & contractor and used to send daily, weekly, fortnightly, and monthly progress reports, and prepared as well as submitted financial statements. Coordinated with Forest Department for removal of trees in the construction corridor. Got operated & maintained existing road.

Renardet SA & Partners
Team Leader Cum Senior Highway Engineer

   May 1999
— Feb 2000

Name of assignment or project: Feasibility Study & Detailed Engineering Design for construction of Mirbat-Sadh-Hadbin Highway; Length-86 km (30km 4-lane +56 km 2-lane), Project Cost- USD 41 M; Two Lane in Rural Area & Four lane in Town Stretch, Financed by The Sultanate of Oman, ICB, Location: Oman, Client : Ministry of Transport & Communication, Main project features: Feasibility Study & Detailed Engineering Design, Position held : Team Leader Cum Senior Highway Engineer.

Activities performed: Undertook Extensive Traffic, highway, environmental and social surveys and analysis; Assessment of traffic levels in base and design years, Design of the Corridor and economic evaluation of projects and consequently optimal improvement program was recommended along with Environment & Social Impact Assessment Report and Road Safety Audit Report. A detailed topographical study with extensive use of digital maps, comprehensive hydrological study & hydraulic analysis and materials testing were conducted. Also, prepared tender documents & drawings. Coordinated with all concerned authorities and obtained approval.

Renardet SA & Partners
Team Leader Cum Senior Highway Engineer

   Jun 1998
— Jun 1999

Name of assignment or project: Feasibility Study & Detailed Engineering Design Birkat Al Mawz / Saiq Road; Length-36 km (4-Lane), Project Cost- USD 17 M Financed by The Sultanate of Oman, ICB, Location: Oman, Client : Ministry of Transport & Communication, Main project features: Feasibility Study & Detailed Engineering Design, Position held : Team Leader Cum Senior Highway Engineer.

Activities performed: Undertook Extensive Traffic, highway, environmental and social surveys and analysis; Assessment of traffic levels in base and design years, Design of the Corridor and economic evaluation of projects and consequently optimal improvement program was recommended along with Environment & Social Impact Assessment Report and Road Safety Audit Report. A detailed topographical study with extensive use of digital maps, comprehensive hydrological study & hydraulic analysis and materials testing were conducted. For project cost optimization through reduction of cost of construction and minimize deviation from the existing track up to 15 % longitudinal gradient was accepted in the design and approved by both the Police & the Client. Necessary elements such as Concrete Safety Barriers, stability of embankment fill slope & cut slope in the design with extensive provision of RCC Retaining Wall Also, prepared tender documents & drawings. Coordinated with all concerned authorities and obtained approval.

Renardet SA & Partners
Team Leader Cum Senior Highway Engineer

   Jan 1997
— May 1998

Name of assignment or project: Feasibility Study & Detailed Engineering Design of Quriyat Sur Expressway; Length-89 km (4Lane), Project Cost- USD 45 M; Financed by The Sultanate of Oman, ICB, Location: Oman, Client: Ministry of Transport & Communication, Main project features: Feasibility Study & Detailed Engineering Design, Position held: Team Leader Cum Senior Highway Engineer.

Activities performed: Undertook Extensive Traffic, highway, environmental and social surveys and analysis; Assessment of traffic levels in base and design years, Design of the Corridor and economic evaluation of projects and consequently optimal improvement program was recommended along with Environment & Social Impact Assessment Report and Road Safety Audit Report. A detailed topographical study with extensive use of digital maps, comprehensive hydrological study & hydraulic analysis and materials testing were conducted. Also, prepared tender documents & drawings. Coordinated with all concerned authorities and obtained approval.

Renardet SA & Partners
Team Leader Cum Senior Highway Engineer

   Feb 1996
— Dec 1996

Name of assignment or project: Feasibility Study & Detailed Engineering Design of Dima and A’ Tayem Highway; Length-84km (30 km - 4 lane +54 km 2 Lane), Project Cost- USD 39 M; Financed by The Sultanate of Oman, ICB, Location: Oman, Client: Ministry of Transport & Communication, Main project features: Feasibility Study & Detailed Engineering Design, Position held: Team Leader Cum Senior Highway Engineer.

Activities performed: Undertook Extensive Traffic, highway, environmental and social surveys and analysis; Assessment of traffic levels in base and design years, Design of the Corridor and economic evaluation of projects and consequently optimal improvement program was recommended along with Environment & Social Impact Assessment Report and Road Safety Audit Report. A detailed topographical study with extensive use of digital maps, comprehensive hydrological study & hydraulic analysis and materials testing were conducted. Also, prepared tender documents & drawings. Coordinated with all concerned authorities and obtained approval.

Continental Construction Ltd
Project Manager

   Jan 1995
— Jan 1996

Name of assignment or project: Operation & Maintenance of Aluva- Shertallay Section of NH-47, (48 km), ADB funded Project, (Project Cost: INR 1200 M/USD-25M ) (FIDIC based ICB Contract), Pipe Culvert-33 No; Box/Slab Culvert-21 No; Minor Bridge- 1 No (Span-21m); RCC Retaining Wall-1km; Terrain-Plain/Rolling; Location: India, Client: Ministry of Surface Transport-GOI through PWD Kerala, Main project features: Maintenance Supervision and contract administration Position held: Project Manager

Activities performed: Prepared & submitted the proposed maintenance (Periodic & Regular) with due consideration of Operation & Maintenance Manual of the Project as well as actual site condition; implemented innovative & advanced techniques for cost & performance effective maintenance; collected data to prioritize maintenance activities by conducting surveys; controlled site operations; implemented contractual requirements & quality control of materials & quality of workmanship; guided project team for setting up of Plant & Machinery at site; measured performance of the contractor by keeping proper records; got certified interim certificates for payment.

Continental Construction Ltd
Project Manager

   Dec 1993
— Dec 1994

Name of assignment or project: Construction Management & supervision of Aluva- Shertallay Section of NH-47, (48 km), ADB funded Project, (Project Cost: INR 1200 M/USD-25M ) (FIDIC based ICB Contract), Pipe Culvert-33 No; Box/Slab Culvert-21 No; Minor Bridge- 1 No (Span-21m); RCC Retaining Wall-1km; Terrain-Plain/Rolling Location: India, Client: Ministry of Surface Transport-GOI through PWD Kerala, Main project features: Construction Supervision and contract administration Position held: Project Manager

Activities performed: As Project Manager equivalent to RE, prepared construction program using M S Project & used Road Estimator for preparation of cross-sections and assisted the Senior Project Manager in overall project management using latest project management techniques for diligent use of manpower and materials, quality control of construction of road works as per MORT&H & I.R.C. Specifications of Road and Bridge works and Box/Slab culverts, load testing of piles, laying of pavements, evaluation of mix designs, approved & monitored sub-contractors programme for construction, verified payment statements for the work done as per B.O.Q. of the sub- contract and deviations and V.O.P. & recommended payments thereof.

Prepared Monthly Construction Reports, Minutes of Meetings and value added methodology for activities using MS Word, MS Excel, Lotus 123, MS Power Point. Combined best practice with new ideas and lots of imagination to deliver best efforts to optimize the cost of the different activities as did for laying DBM by getting the mix designed for 100mm thickness giving rise to reduced bitumen content & saving in cost of compaction by doing in one layer in place of two layers. Operated & maintained existing road.

Continental Construction Ltd
Highway Engineer

   Apr 1992
— Nov 1993

Name of assignment or project: Fourlaning of Ahmedabad-Vadodara Expressway, 92.5 km, NH-8, World Bank funded project, Gujarat (Project Cost: INR 2310 M / US$- 38.5M) (FIDIC based ICB Contract), Location: Gujrat (India), Pipe Culvert-113 No; Box/Slab Culvert-56 No; Interchange-2 No (Anand & Nadiad); Minor Bridge-12 No (Span 14 to 30m); Major Bridge-1 No (Span-42m), RCC Retaining Wall-3km; Terrain-Plain/Rolling; Client: Ministry of Surface Transport-GOI through PWD Gujrat, Main project features: Construction Management & Supervision, Position held: Highway Engineer

Activities Performed: As Highway Engineer, worked under project based supervision of Engineers and Senior Engineers maintaining technical quality standards & assisted in overall project management and project planning using M S Project , project monitoring of schedules, cash flow management etc., examining sub-contractors programme for construction and recommending for approval of the same, coordinated with Materials Engineer for approval of mixes, calibration and control of asphalt and concrete batching plants, assisted Quantity Surveyor in verifying sub-contract billing for the work order & Interim monthly statement for payment of the main contract works executed, assisted in preparation of progress reports, day to day, coordinated with client and consultant. Operated & maintained existing road.

M K Nirman Sewa Pvt Ltd
Highway Engineer

   Mar 1988
— Mar 1990

Name of assignment or project: Construction Management and Supervision of Kushma - Gaighat Highway project (37km) for (Project Cost: US$ 18.5 M / NPR 1850 M / INR1110 M) (FIDIC based Contract), Pipe Culvert-29 No; Box/Slab Culvert- 15 No; Minor Bridge-1 No (Span-19m); Terrain-Mountainous; NCB, World Bank Aided, Location: Nepal, Client: Department of Roads, Ministry of Works and Transport, His Majesty's Government of Nepal, Main project features: Design Review and Construction Management & Supervision, Position held: Highway Engineer

Activities Performed: As Highway Engineer, delivered project activities in time & budget assigned through planning the road construction works and exercising control on day to day execution of the works as per the contract drawings, specified quality control of road construction works and materials, assisted in manpower and equipment planning, prepared progress reports, checked of line & levels, layouts etc., assisted Quantity Surveyor in preparation of Interim Payment Application (IPA). Operated & maintained existing road.