Mechanical / Piping Engineer
Last Updated: 22nd March 2020 (over 2 years ago)
Summary
Skilled in developing FEED and Detailed Design for Downstream & Midstream Process Plants, Oil & Gas Facilities, Launcher/Receiver Stations and Onshore Pipelines. Proficient in preparing & reviewing Overall Plot plan, Piping general plan, Plant layouts, Plot plan, Isometrics, pipe support drawings and Piping detail drawings.
Strong Exposure in providing procurement support like preparing BOQ, Material Requisition, Post order vendor document review and Technical Bid Evaluation. Sound understanding of Piping design codes & standards (such as ASME, ASTM, API & Shell DEPs) and standards of national & international clients (such as Shell, QP, ADCO, GASCO, KOC, MEW, DNO). Possess strong planning, analytical & communication skills and unique quality of working in high pressure environments with ease and open mind.
Education
Mechanical Engineer
May 2005
— May 2009
Experience
PIPING ENGINEER
Mar 2019
— Current
Responsible for purchasing piping materials and preparation of procurement support documents like BOQ, Material requisition, Technical Bid Evaluation and Post order vendor document review.
Checking and approval of Vendor documents.
Performing Inspection at vendor workshop for purchased piping materials before shipment.
3D model internal check and 3D model review client comments close out.
Checking of Isometrics.
Performing Piping Stress Analysis using the CAESAR II Software.
Handling and close out of site queries as a part of site support.
PIPING ENGINEER
Mar 2019
— Current
Responsible for purchasing piping materials and preparation of procurement support documents like BOQ, Material requisition, Technical Bid Evaluation and Post order vendor document review.
Checking and approval of Vendor documents.
Performing Inspection at vendor workshop for purchased piping materials before shipment.
3D model internal check and 3D model review client comments close out.
Checking of Isometrics.
Performing Piping Stress Analysis using the CAESAR II Software.
Handling and close out of site queries as a part of site support.
PIPING ENGINEER
Oct 2010
— Mar 2019
Performing Piping Stress Analysis using the CAESAR II Software.
Review of 3D model and participating in 3D model review meeting in different stages including 30%, 60% and 90% model review.
Preparing specifications like Piping Material specifications, valve specifications, specification for pipes, fittings, flanges etc.
Developing Tie-In schedules, Equipment schedules, Valve schedule, Piping special items list and Pipe support schedule etc.
Creating datasheets like Valve data sheets, Mechanical Equipment data sheets and data sheet for Piping Specialty Items.
Preparation of procurement support documents like BOQ, Material requisition, Technical Bid Evaluation and Post order vendor document review.
Participating in design review meetings and reviewing Plot Plan, Equipment Layout, Piping Layout & Isometrics.
Checking and approving Layouts / Isometrics / MTOs / Pipe Support drawings.
Conducting site visits for piping route verification and data collection.
Undertaking Technical Bid Evaluation for Piping items and reviewing post order vendor documentation.
Performing detailed review of engineering deliverables including sizing /wall thickness calculation, stress analysis reports, optimization of piping layouts, master plan and Isometrics.
Reviewing safety standards in the site and issuing work-permits depending on the nature of job e.g. Hot work, cold work, naked flame, confined space, need of mecanical /electrical/ process isolation.
Supervising NDT activities at site and preparation of Residual Life Assessment of existing plant facilities.
SITE ENGINEER
May 2009
— Aug 2010
Responsible for site engineering activities and providing technical assistance to the construction supervision team
Performed verification of construction in line with design drawings;
Checking of radiographic film reports.
Developed Field Change Notice, Concession Requests and Engineering Support for the project.
Worked in close coordination with Design/Construction Contractor and Client.
Handling of materials and equipment’s reached at site.
Prepared daily progress and reported to the GM.