Planning Engineer


Last Updated: 2nd October 2019 (over 3 years ago)

Address
Pakistan

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
Arabic, English, Hindi, Urdu

Summary

17+ Years’ Experience of Execution, Planning, Supervision and Construction Management of Mega Projects such as Dams, Luxury residential units, Industrial and Commercial Buildings (including high-rise buildings), Community Infrastructure and Development projects, with multinational contracting and consulting companies in
Bahrain, Pakistan, Saudi Arabia and Qatar.

Education

Project Management Institute, USA
Project Management Professional (PMP)

   Oct 2012
— May 2013

PMP Certification

University of Engineering and Technology, Lahore, Pakistan
Civil Engineer

   Jul 1997
— Aug 2002

B.Sc. Graduation (4-years)

Experience

Saudi Arabian PARSONS Limited (SAPL), Saudi Arabia
Principal Schedular

   Jul 2017
— Current

Projects: Multiple Projects for Royal Commission in Yanbu, Saudi Arabia (Details Confidential)
Roles and Responsibilities:
 To Assist to Project Control Manager for Overall Planning, Scheduling, Progress Forecasting and Projects coordination.
 Reporting contractual responsibilities of Royal Commission’s (RC) Contractors planning, scheduling and progress performance.
 Monitors, and advises Projects Control Department’s Management in Planning, Scheduling and Reporting Procedures e.g. Collecting, Evaluating and Forecasting Project Status and Project Control Data as requested.
 Guiding and Leading the team of Contractor’s Planners and Schedulers for to prepare the fully Resource Loaded and Cost Loaded Plans up to maximum detailed level (Level-6), using Primavera P-6 (R8.3).
 To Advise the Contractor to Develop and Monitor the Project Schedules by Depicting the Sequence of Events, Dependencies, and Interfaces with other Ongoing and Upcoming Projects to Clearly Illustrate the Objectives and Strategy of the Program to meet the Project’s Requirements of the Royal Commission’s (RC) Engineering Department’s Responsibility Assignment Matrix (RAM).
 To Develop the Critical Project Milestone Activities from the project schedules or projects department (RAM) to monitor the Progress of the Ongoing Project’s Work and the inter-relationship with Milestones for Design, Engineering, and Procurement.
 Assist the Project Control Manager to Develop and Monitor the Pre-Award Schedules and Assists in Request for Proposal (RFP) for reviewing and for Bid Evaluations as required.
 Coordinates major milestone activities and establishment of Major Contract Events for incorporation in the RFP’s Special Conditions and Pre-Award Reports.
 Reviews, Analyze and Recommend the Approval or Disapproval or Disposition of Contractor’s Preliminary or Detailed Schedules, including Resource Allocations including Manpower, Material and Cost.
 Summarizing the Approved Detailed Schedules for Incorporation in the Projects Department’s RAM, utilizing the Established Project Control Procedures.
 Identifies Potential Contract Changes and Develop an appropriate Logic Schedules.
 Develop the Trends and Forecast of Contract Progress and provide the input to Progress Reports.
 To Deal with Change Orders, Additional Works and Events that affect the Project’s timely completion, by Reviewing, Analyzing and Recommending the Claimed Extension of Time (EOT) and further to any Revision in Project Schedules.
 Responsible for the implementation of standard work procedures and standards, and managing the intercepted changes accordingly.
 Collaboration and coordination with all stakeholders to understand their requirements and expectations and further applying various strategies in order to efficiently manage their expectations.
 Managing all the requested changes as per the methodologies specified in Standard Change Control Processes and also to foresee the potential changes and cost implications associated with them.

Diwan al Emara, Qatar
Senior Planning Engineer

   Jul 2014
— Jun 2017

Projects:
o Construction of Qatar Academy, Al Khor, Qatar (Project Cost: QAR-566 Million)
o Construction of Al Thuraya Tower, West Bay, Qatar (Height: 174m, 46-Storey, Project Cos: QAR-299Million)
o Construction of Traders Hotel, West Bay, Qatar (Height: 123m, 34-Storey, Project Cos: QAR-298Million)
o Hermas Development Project, Lusail City, Qatar (Height: 52m, 11-Storey, Project Cos: QAR-500Million)
o KDO Private Residance, Al Onaiza, Qatar (Height: 16m, 4-Storey, Project Cost: (150 Million)
o Construction of Office Building at Al Salata, Qatar (Height: 48m, 10-Storey, Project Cos: QAR-28Million)

Roles and Responsibilities:
 Monitoring and controlling of all the works of contractors in the light of the approved Project Management Plans and recommend them the required improvements in in order to adhere to the PMPs.
 Guiding and leading the team of planners and schedulers for to prepare the fully Resource Loaded and Cost Loaded Plans up to maximum detailed level (Level-6), using Primavera P-6 (R8.3).
 Providing guidelines and sufficient trainings to the team of Planners and Schedulers in order to fully implement the PMPs during the course of the project works.
 Responsible for the implementation of standard work procedures and standards, and managing the intercepted changes accordingly.
 To Deal with Change Orders, Additional Works and Events that affect the Project’s timely completion, by Reviewing, Analyzing and Recommending the Claimed Extension of Time (EOT) and further to any Revision in Project Schedules.
 To Advise the Contractor to Develop and Monitor the Project Schedules by Depicting the Sequence of Events, Dependencies, and Interfaces with other Ongoing and Upcoming Projects to Clearly Illustrate the Objectives and Strategy to meet the Project’s Requirements and for Client’s Satisfaction.
 Assist the Project Control Manager to Develop and Monitor the Pre-Award Schedules and Assists in Request for Proposal (RFP) for reviewing and for Bid Evaluations as required.
 Coordinates major milestone activities and establishment of Major Contract Events for incorporation in the RFP’s Special Conditions and Pre-Award Reports.
 Collaboration and coordination with all stakeholders to understand their requirements and expectations and further applying various strategies in order to efficiently manage their expectations.
 Managing all the requested changes as per the methodologies specified in Standard Change Control Processes and also to foresee the potential changes and cost implications associated with them.

Abdullah A.M. Al-Khodari, Saudi Arabia
Planning Engineer

   Jan 2013
— Jul 2014

Project: City Sewerage Network Project, Al-Baha, Saudi Arabia
Roles and Responsibilities:
 Collection of Community Sewerage System’s Requirements and Subsequent Designing.
 Systematically applying Change Control Processes in order to the Manage all the Changes intercepted.
 Preparation of fully Resource Loaded and Cost Loaded Plans upto Level-6, using Primavera P-6 (8.2)
 Preparation of Scenario-Based Schedule Analysis to incorporate and deal with unpredictable situations.
 Monitors, and advises Planning Department in Planning, Scheduling and Reporting Procedures e.g. Collecting, Evaluating and Forecasting Project Status and Project Control Data as requested.
 Analysis of Plans in order to overcome the Time and Resources Constraints and subsequently guiding the Project Team to deal with the situations and their relevant solutions e.g. Scheduling Compression Techniques and Resource Leveling etc. and their associated Risks Factors.
 To Deal with the Design Changes, Additional Works Proposed by Client, and Events that resulted in Project’s Delay by Preparing of Extension of Time (EOT) Claim.
 Monitoring and Controlling of Projects and Preparation of Executive Progress Reports including Forecasts.
 Proceeding for Monthly Invoices (Arabic Format)
 Development of In-house Bottom up Estimating System (MS Excel- Based) for Accurate Forecasts.

CDM Smith, Pakistan
Assistant Resident Engineer

   Feb 2011
— Dec 2012

Project: Construction of Educational and Health Facilities in AJK, Pakistan
Roles and Responsibilities:
 To Assist the Resident Engineer by Managing & Supervision of all Construction related activities
 Initiation & Evaluating of Change Order Request / Claims, Preparing of Estimates and other Contractual matters.
 To Prepare the Executive Reports.
 To Prepare the Payment Terms and Monthly Bills.
 To Implement and Monitor the CDM’s HSE Plan (ISO-12001) and Quality Control Plan (ISO-9001)
 Preparation and Standardization of Project Documentation.
 Coordination with related Parties e.g. Donor, Client, Consultant, Designer and Contractor etc.

Eden Housing Limited, Pakistan
Planning Engineer

   Feb 2009
— Feb 2011

Projects: Infrastructure Development and Construction of Residence Compounds (3,000-Housing Units), Lahore, Pakistan
Roles and Responsibilities:
 Preparation of fully Resource Loaded and Cost Loaded Plans for all Projects upto Level-5, using Primavera 3.1
 Monitoring and Controlling of Projects and Preparation of Executive Progress Reports, including Summary of Cost, “S” Curves, Earned Value Management Techniques (EVM), Budget at Completion (BAC), Estimate at Completion (EAC), Variance at Completion (VAC) and Cost to Complete (CTC) etc.
 Proceeding for Monthly Invoices and Change Orders during the execution phase.
 Development of In-house Software for Reconciliation and for Audit Purposes.
 Planning and directions for to maximize the production, efficiency, improvement of production’s quality and customer service. (For Batching Plant and for Ready Mix Concrete Supply).

National Management Foundation (LUMS), Pakistan
Site Engineer

   Oct 2007
— Feb 2009

Project: Construction of Suleman Dawood School of Business (SDSB) in LUMS Campus, Pakistan.
Role and Responsibilities:
 Planning and Supervision of all Construction related activities at Site
 Preparation of Project Bar Chart, Monitoring and controlling the progress by using planning tools e.g. Primavera 3.1.
 Monitoring and Controlling of Projects and Preparation of Executive Progress Reports, including Summary of Cost, “S” Curves, Earned Value Management Techniques (EVM), Budget at Completion (BAC), Estimate at Completion (EAC), Variance at Completion (VAC) and Cost to Complete (CTC) etc.
 Preparation of Bill of Quantities, Bar Bending Schedules, Monthly Running Bills, Shop Drawings and Monthly Progress Reports etc.
 Conducting Meetings with all related Parties e.g. Donor, Client, Consultant, Designer and Contractor etc.

Guarantee Engineers, Pakistan
Site Engineer

   Dec 2006
— Oct 2007

Project: Construction of Lahore Garment City, Pakistan
Role and Responsibilities:
 Planning and Supervision of all Construction related activities at Site
 Preparation of Project Bar Charts and Monitoring the progress by using planning tools e.g. Primavera 3.1
 Preparation of Bill of Quantities, Bar Bending Schedules, Shop Drawings, Running Bills and Progress Reports etc.
 Conducting Meetings with all related Parties e.g. Client & Consultant and Petty Contractors etc.

Skyline Trading Corporation (STC), Bahrain
Site Engineer

   Apr 2005
— Oct 2006

Project: Construction of Ahmadia Gardens, Bahrain
Role and Responsibilities:
 Planning and Supervision of all Construction related activities from Layout to Handing Over e.g. Structural works, finishing works, Mass Concreting with Concrete Pumps, Erection of Precast Concrete Members, Swimming Pools, Sports Club, Gymnasium & Compound’s Landscaping etc.
 Preparation of Project Bar Chart, Monitoring and Controlling of the Progress by using Primavera 3.1
 Infrastructure Development including Community Sewerage System, Soak Ways, Underground Electrical Works, Substation, Sensitive Security & Alarming System and Air Conditioning System etc.
 Conducting Meetings with all related Parties e.g. Client, Consultant, Designer and Petty Contractors etc.

Real Builders, Pakistan
Site Engineer

   Jun 2003
— Apr 2005

Project: Construction of houses and Commercial buildings in Real Cottages, Defense, Lahore, Pakistan
Responsibilities as Site Engineer:
 Supervision of all construction related activities at site from Layout to Handing over. (Houses constructed = 25 No.s)
 Preparation of Bill of Quantities, Bar Bending Schedules, Weekly Bills and Monthly Progress Reports etc.

Indus Valley Construction Company (IVCC), Pakistan
Site Engineer

   Aug 2002
— Jun 2003

Project: Boring of exploratory boreholes at Gomal Zam Dam, FATA, Pakistan
Excavation of exploratory adits at Basha Diamer Dam, Pakistan
Responsibilities:
 Supervision of all related activities at Dam Location e.g. drilling with heavy machinery and Geotechnical Investigation of Core Recovery. Conduction of Packer Tests in Boreholes (Water Pressure Tests)
 Supervision of all related activities at Dam Site e.g. Demarcation and Controlling the Direction of Adits with Latest Surveying Instruments, Pneumatic Drilling and Rock Blasting etc. Conduction of Flat-Jack Tests in Audits