Senior Planning Engineer, Delay Analyst, Forensic Planner


Last Updated: 5th October 2017 (over 5 years ago)

Address
United Arab Emirates

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Punjabi, Urdu

Summary

Seeking a career oriented position in a reputed dynamic organization for challenging tasks. Enhancing the professional knowledge to deal the challenging problems and show commitment to growth and development of the organization. Provide necessary planning techniques to client/company and guidance in developing and adopting a practical but transparent system of progress measurement method and structure, aligning with the Plan’s WBS, and establish planning deliverables. Perform Delay Analysis with different internationally accepted methods for getting extension of time (EOT) & cost claims. I have been involved in arbitrations. My focus in my professional career is project planning & control, forensic planning (delay analysis) & claims.

Education

University of Engineering & Technology Taxila, Pakistan
Bachelor of Science in Civil Engineering

   Jun 2007
— Jul 2011

Experience

Schema Management Group Lomoted LLC
Senior Planning Engineer / Senior Delay Analyst

   Jan 2014
— Current

Currently Working with Schema Management Group Limited LLC in Dubai UAE as Senior Planning Engineer/Delay Analyst. It is a USA based Project Management & Contracts & Claims Consultant firm. I have been designated as a Senior Planning Engineer/Delay Analyst to perform delay analysis using internationally accepted different methods of analysis (Both Prospective Analysis & Retrospective Analysis Techniques) for preparation of Extension of Time claims for delayed ongoing projects and doing Forensic Investigation for completed projects to prepare a strong basis for cost claims and extension of time for delayed projects. Following is the detail of the projects I have worked on and I am working currently;

Schema Management Group Ltd LLC Dubai UAE (Jan-2014 to Present)
1 HHHR Tower Project (Blue Tower) Dubai UAE (Arbitration) Delay Analysis & Expert Witness Report

2 Jet Propulsion Center Saudi Arabian Airlines Jeddah Airport KSA
Review and Analysis of the Schedules Submitted by the Contractor

3 Infinity Tower Dubai Marina UAE (Arbitration)
Delay Analysis

4 YAS Island Zone-K Development (Infrastructure & Marine Works) Abu Dhabi
Project Planning, Monitoring, Control & Delay Analysis

5 Barakah Nuclear Power Plant Project Abu Dhabi
Delay Analysis

6 Jumeirah Park Villas Package-5A Construction of 134 Villas
Delay Analysis

7 Dredging, Reclamation & Shore Protection Works at La Mer Project Jumeirah Open Beach Dubai UAE
Project Planning, Monitoring, Control & Delay Analysis

8 Construction of Cargo and MRO Facilities at Muscat and Salalah Airports Review and Analysis of the Schedules Submitted by the Contractor

9 Disease Prevention and Screening Center Abu Dhabi
Project Planning, Monitoring, Control & Delay Analysis

10 Dubai International Airport Terminal 2 Project
Delay Analysis

11 BMS & SCDADA Works at Muscat Airport
Project Planning & Delay Analysis (On Going)

12 Al Habtoor City (Construction of St. Regis, Westin & W hotel)
Acceleration / Disruption Claims (Delay Analysis)

13 Police Headquarters Awir Dubai
Delay Analysis

14 Construction of Fire Fighting Stations at Burgan for Kuwait Oil Company, Kuwait
Delay Analysis (On Going)

15 Construction of Bulk Handling Facilities for Kuwait oil Company, Kuwait Delay Analysis (On Going)

16 Jeddah South Thermal Power Plant Saudi Arabia
Delay Analysis

17 Mechanical Works at Das Island Project, Abu Dhabi
Delay Analysis

18 Mechanical Works at Zirco Island Project, Abu Dhabi
Delay Analysis

19 Construction of Operations, Data and Cash Center for Al Rajhi Bank Riyadh Saudi Arabia
Delay Analysis

20 Swiss International School project Dubai
Delay Analysis (On Going)

Other projects on which I have worked and on which I am working (With Schema Management Group Limited LLC) are as follows;

• Schedule Review and Analysis for Construction of Cargo and MRO Facilities at Muscat and Salalah Airports. – For Ghafari Associates
• Project Planning for Disease Prevention and Screening Center Abu Dhabi – For Athena Emirates LLC
• Delay Analysis for Al-Badrah Water Front Project Dubai - For Al Ahmadiya
• Delay Analysis for Dubai International Airport Terminal 2 Project – For Arabtec
• Acceleration / Disruption Claims (Delay Analysis) for Al Habtoor City (Construction of St. Regis, Westin & W hotels) – For Drake & Skull and Habtoor Leighton Specon JV
• Project Planning & Delay Analysis for BMS & SCADA Works for Muscat Airport Project – For Honeywell
• Delay Analysis for Construction of Police Headquarters Awir, Dubai - For City Engineering and Contracting LLC
• Delay Analysis for Mechanical works of Das Island Project Abu Dhabi – For Euro Mechanical
• Delay Analysis for Mechanical works of Zirco Island Project Abu Dhabi – For Euro Mechanical
• Delay Analysis for Construction of Operations, Data and Cash Center for Al Rajhi Bank Riyadh Saudi Arabia – For Drake & Skull
• Delay Analysis for Construction of Swiss International School Project Dubai for Al Ahmadia
• Delay Analysis for Construction of Fire Fighting Stations at Burgan for Kuwait Oil Company, Kuwait with Combined Group (CGC)
• Delay Analysis and Planning Support for Construction of Bulk Handling Facilities for Kuwait oil Company, Kuwait with Combined Group (CGC)
• Delay Analysis for Jeddah South Thermal Power Plant Saudi Arabia for NCC

FWO-CSCEC JV
Planning Engineer

   Jul 2011
— Jan 2014

I have worked with China State Construction and Engineering Corps (CSCEC) and Frontier Works Organization (FWO) from July 2011 till January 2014 as JV Planning Engineer on New Benazir Bhutto International Airport Project Islamabad Pakistan (NBBIAP). The project was construction of passenger’s terminal building including all utilities & Mechanical & Electrical works. It was Joint Venture of FWO and CSCEC and Consultant was The Louis Berger Group (USA). The client was Civil Aviation Authority (CAA) of Pakistan. I was assigned to perform the following tasks;

• Development of Detailed Work Programme Based on CSI Master Format 2004 for construction of Passenger Terminal Building using Primavera p6
• Responsible for analyzing the original status of the project.
• Preparation of two weeks & monthly look-ahead schedules.
• Preparation of S-Curves (Physical vs Planned) (Cost & Progress)
• Maintaining all the daily site progress, gradual monitoring.
• Preparation of Daily, Weekly and Monthly Progress Reports.
• Resource Allocation and Resource Leveling.
• Evaluation of project (Earned Value Management)
• Co-ordination with other Depts for effective performance of project team.
• Preparation of recovery, revised and updated schedules.
• Retrospective Analysis (Time Impact Analysis i.e Window Analysis) for doing Delay Analysis for Extension of Time claims.
• Preparation of Claims (Time & Cost).