Summary

 Have extensive experience in planning, designing and implementation of water supply, sewerage, drainage, solid
waste management system, in rural, semi-urban and urban areas of Punjab and NWFP Provinces of Pakistan.
 Involved in designing as well as project management during execution of Water and Sanitation Public Sector
Projects.
 Experience of building and roadworks related to sewerage and drainage works particularly roadside storm drainage,
construction of bridges, culverts, cross-utility ducts etc.
 Worked on the Asian Development Bank and the World Bank assisted projects. Extensive experience of Contract
Management of foreign-assisted projects.
 Excellent command on MS Office, MS Project, AutoCAD. Also worked on UNDP Program Loop and Sewer along
with Haestad Water Cad for the design of a water supply system.

Area of Specialty include:

 Feasibility and Design  Concept papers  Operation and Maintenance
 Cost Estimation  Contract Management  MS Office
 Project Management  Trainings  Computer Aided Programs

Education

Institute of Public Health Engineering & Research University of Engineering & Technology Lahore
MSc; Engineering (Public Health)

   Jan 1995
— May 1997

Studied the following subjects:
Water Supply and Water Treatment Design
Examination and Qualitative Analysis of Water
Solid Waste Management
Sewerage and Waste Water Treatment Design
Air Pollution
Public Health Engineering
Research Paper on
Economic and Qualitative Analysis of Water Supply Schemes based on Ground Water and Surface Water Sources

University of Engineering & Technology Lahore
BSc; Engineering (Civil)

   Jun 1984
— Jul 1989

Was Taught the following subjects:
Structural Analysis I&II
Concrete I&II
Fluid Mechanics
Hydraulic Engineering
Soil Mechanics
Irrigation Engineering
ETC.

Experience

Punjab Municipal Development Fund Company
General Manager Engineering

   Jul 2006
— Current

 Assist Local Government in building the capacities for better fiscal and service delivery management in municipal bodies through Punjab
 Making proposals, concept papers, reports, pre-feasibilities for infrastructure projects particularly water supply, sewerage and solid waste management systems and in general other sectors like roads, parks, slaughterhouses and street lights etc.
 Provide assistance in evaluating matching grants to Local Governments for the construction, rehabilitation and expansion of infrastructure particularly Water, Sewerage and Solid Waste Management and provide Consultancy Services for evaluation and monitoring purposes.
 Monitor, evaluate and ensure that funds are used properly, efficiently and transparently regarding Projects carried out by PMDFC
 Provide an effective management and information system for regular and proper monitoring and evaluation over financial and technical assistance from the fund
 To support, initiate, undertake and promote research and development particularly where new proposal was involved
 Carryout training sessions on infrastructure development particularly in Water Supply, Sewerage/drainage and Solid Waste Management Systems in urban localities
 Resource person for training on water supply, sewerage/drainage, and solid waste management in “Academy of Excellence of Local Government in Lalamusa”.
Review of Proposals & New Initiatives/Programs
 Review of Annual Development Programs
 Oversee the work of members of PMDFC Engineering Team in Technical Committee to
 Assess the quantum of work needed to rehabilitate the water sanitation schemes in the sub-urban areas of the Towns of Lahore to formulate a bailout package for these areas and recommend measures to eliminate disparity among rural and urban areas
 Installation of BTS Towers in Residential Areas and other allied issues of Mobile Phone Companies
 The Punjab Building Control and Housing Schemes Regulatory Authority ACT-2012
 Water and Sanitation Committee. The TORs of the Committees were:
 Proposing Timelines for expansion of Lahore Solid Waste Management Model to 5 other cities of Punjab
 Proposing mechanism for solid waste collection for rural areas
 Formulation of plan for revival of dysfunctional water supply schemes
 Formulation of plan for increasing sewerage coverage
 Plan for ensuring water supply service delivery during load shedding
 Fresh water supply schemes both in urban and rural areas
 Study for imposition of UIP Tax in the extended areas of TMAs of District Lahore with the following TORs of the Team:
 To Examine the legal frame work of UIP TAX ACT vis a vis PLGO, 2001
 To ascertain the present status of UIP Tax in TMAs of Lahore
 Evaluate the potential in the revision and extension of UIP Tax Rates
 Member of Team for the preparation of “Sectoral Plan for LG&CD Department”. (2013)
 Member of Committee for: (2013)
 Drafting of Standard Contract Agreement
 Drafting of Contract Management Manual
 Drafting of SOPs of TMA Works Rules
 Development of Training Modules for Engineering personnel of Local Government
 Assisted LG&CDD in formation of comments/recommendations on Draft Municipal Water Act
 Assisted LG&CDD in monitoring of status of tube wells and generators on water supply and sewerage schemes WASA Lahore.
Comments
 Draft Punjab Sanitation Policy (Year 2012)
 Solid Waste Management Project Vehari (Year 2012)
 Punjab Municipal Water Act 2012
 Process for Hiring of Scheduled Bank for the water bill printing and collection system to be provided by all TMAs of Punjab (Except CDGs) (2012)
 Feasibility Report for “Water Supply Scheme Wahga Town Lahore”. (2012)
 Disparity in Service Delivery in Rural Areas of Lahore vis-à-vis the Urban Areas
 Scrutiny of “Urban Water Supply Scheme Jaranwala” on the instructions of LG&CD Department (2013)
 PC-I for “Sustainable Social Economic Development Revitalization in the Core City of Multan” (2014)
 Part of Team of PMDFC for Comments on the “Study Conducted by World Bank on Water Supply and Sanitation Facilities in Pakistan” (2012)
 Punjab Rural Sanitation Scale up program Work Plan 2013-2014 by World Bank
 Comments on “Development of Tribal Area Rajanpur” regarding Road Network, Infrastructure and Drinking Water Supply
 Review of Training Modules for Al-Jazery Academy WASA Lahore
Concept Papers, Proposals, Reports & Briefs
 A brief on Overview of Existing Water and Sanitation Service delivery scenario in Punjab (2012
 Proposal for Safety Equipment for Workers with regards to Sewer Cleaning Operations in TMAs of Punjab due to Sanitary Workers’ Death (2012)
 Outsourcing of Water Supply and Sewerage Services in Bahawalpur City (2012)
 Brief Proposal on Use of “Twin oxide” for disinfection of Water Supply Systems of 5 WASAs in Punjab (2012)
 Formulation of Data Collection format for “Drain Desilting Arrangements in TMAs of Punjab” (2012)
 Proposal for “Construction of Model Warehouses for Dengue Equipment” and preparation of PC-I with the following scope of work
 Standard Operating Procedures for management of warehouse
 Human Resource requirement for warehouse
 Maintenance and up keep of equipment
 Inventory management (2012)
 Proposal for “Alternate Energy Sources in Punjab”. Detailed Working was prepared and alternate options were prepared particularly Solar Energy Options. (2013)
 Part of Team to develop Situation Analysis Reports of Integrated Solid Waste Management Systems for 104 TMAs of Punjab under Chief Minister Punjab Special Initiatives Program, 2013-2014 mainly, constituting the following
 Analysis of Existing Situation
 Requirements Current and Future
 Proposed interventions
 Proposed Plans
 Proposal for “Capacity Building-Provision of Infrastructure for the Legal Cell of the LG&CD Department”. (2013)
 Proposal for “Provision of Metering System for Water Supply Connections of CO Unit Raiwind. (2013)
 Framed Bye-Laws for the management of water supply schemes maintained by TMAs in the Punjab (2013)
 Member of Team for the Preparation of “Revised PC-I, Punjab Municipal Services Improvement Project (2013)
 Framed “Standards and Protocols set for the provision of Clean Drinking Water” for TMAs (2013)
 Being member of the team following proposals were made by PMDFC: (2013)
 Trade Fee Structure for TMAs
 Bye-laws on Regulation of various functions of TMAs
 Establishment of Public Facilitation Centers
 Ware House Maintenances along with framing SOPs for operational requirements
 Concept Paper of “Bye-laws for water supply systems in urban areas of Punjab”(2013)
 Proposal for “Improvement in Efficiency of Licensing and Fee Collection” (2013)
 Concept Paper for Development of Solid and Liquid Waste Management System at Village Level in Rural Areas of Punjab-UNICEF Assisted (2013)
 Report on “Water Drinking Standards to be applicable for Clean Drinking Water” followed by Ministry of Environment and PHED Government of Punjab (2013)
 Guidelines for Collection of data regarding Project, “Elimination of Ponds from Major Villages of Punjab for improvement of Sanitation and Eradication of Vector Diseases by bioremediation” (2013)
 Preparation of concept / proposal for alternate models of Rural Solid Waste Management System
 Furnished comments and recommendations on various concept papers, proposals and technical documents forwarded by LG&CDD (2014-2015):
 Survey of Water Filtration Plants constructed by KSB in Lahore.
 Chlorine dioxide as disinfectant
 Draft policy for inception of Urban Water Supply and Sanitation in Punjab
 Outstanding problems in water supply systems in Punjab
 WASH Behavior Change Document
 Alternative Energy Conservation
1. Preparation of Concept Paper for Saaf Dehaat Program for the year 2017-2018
2. Study on Water Conservancy Charges for Industries and Commercial areas of Punjab (on going) and formulation of Report to present in Supreme Court of Pakistan on the Issue (2018)
3. Detailed designing & preparation of cost estimates of Public Facilitation Centre for TMAs
4. Preparation of bylaws for water supply system in urban localities of Punjab
5. Development of concept paper for mobile workshops in TMAs
Resource Person for Trainings of LG&CD Department
 Post induction trainings of sub-engineers in LG&CD Department on Contract Management, Designing, Operation & Maintenance of Roads, Water Supply and Sewerage Systems (2015-2016)
 O&M of Water Supply Systems. Imparted Trainings to all MCs, District Councils of DG Khan, Bahawalpur and Multan Division (2016-2017)
Preparation of PC-Is, PC-IIs & PC-IVs:
 Preparation of PC-I for “Local Government Development Package” for the year 2017-2018
 Preparation of PC-I for “Saaf Dehaat Program Govt. of Punjab” for the year 2017-2018
 Managed to prepare
 Preparation of PC-II on waste water treatment facilities for waste water being used for agriculture and broad irrigation (2014-2015).
 Project Manager over rural solid waste management in rural areas (2014-2015)

Punjab Municipal Development Fund Company
Manager Engineering

   Apr 2006
— Jul 2006

 Conduct field visits to assess the real needs of selected TMAs and prepare Field Appraisal Reports of infrastructure subprojects in some of the following general fields
 Water Supply
 Firefighting
 Sewerage/Drainage
 Solid Waste Management
 Roads
 Parks
 Slaughter Houses
 Cattle Markets
 General Bus Stands etc.
 Assist procurement section of the project in finalization of bidding documents
 Manage infrastructure projects with maximum precision within target dates
 Co-ordination with Institutional Development section of the company and assist them in planning processes and enhancement of institutional development of TMAs
 Development of a data base system of infrastructure projects
 Prepare and conduct presentations on infrastructure development and brief to TMA authorities and various Govt. officials over the proposals made by PMDFC with regard to PMSIP

Associated Consulting Engineers
Principal Engineer

   Aug 2005
— Apr 2006

 Preparation of Feasibility reports and designs of Water Supply, Sewerage and drainage systems including the following :
Tender Drawings
 Bill of Quantities
 Co-ordination with Contract and Procurement Advisor (CPA) for the preparation of Bidding Documents.
 Initial Environmental Examination (IEE)
 PC-Is
 Monthly Progress Reports
 Representation and briefing to the Asian Development Bank regarding the prepared Feasibility/Appraisal reports
 Participation in briefing regarding progress and achievements of targets to Asian Development Bank Mission in light of Bank Loan Covenants, Guide Lines, Project Authorized Memorandum and Bi Annual Aide Memoirs of Bank Missions.

 Lead the team of Senior Design Engineers, Junior Design Engineers, Technical Assistants and AutoCAD operators to complete the projects within stipulated time frame and ensure the quality of the papers being produced.
 Coordination with TMAs and Project co-ordination Unit in implementation of the subprojects.
 Co-ordination with Financial Management and Institutional Development Specialist (FMIDS) to finalize financial plans;
 Co-ordination with Contract and Procurement Advisor (CPA) for the preparation of Bidding Documents.
 Representation and briefing to the Asian Development Bank regarding the submitted Appraisal & Feasibility Reports.
 Participation in briefing regarding progress and achievements of targets to Asian Development Bank Mission in light of Bank Loan Covenants, Guide Lines, Project Authorized Memorandum and Bi Annual Aide Memoirs of Bank Missions.
 Lead the team of Senior Design Engineers, Junior Design Engineers, Technical Assistants and AutoCAD operators to complete the projects within stipulated time frame and ensure the quality of the papers being produced.

Associated Consulting Engineers
Sr. Engineer/Construction Supervision Specialist

   Jul 2003
— Aug 2005

 Preparation of Feasibility reports and designs of Water Supply, Sewerage and drainage systems including the following :
Tender Drawings
 Bill of Quantities
 Co-ordination with Contract and Procurement Advisor (CPA) for the preparation of Bidding Documents.
 Initial Environmental Examination (IEE)
 PC-Is
 Monthly Progress Reports
 Representation and briefing to the Asian Development Bank regarding the prepared Feasibility/Appraisal reports
 Participation in a briefing regarding progress and achievements of targets to Asian Development Bank Mission in light of Bank Loan Covenants, Guide Lines, Project Authorized Memorandum and Bi Annual Aide Memoirs of Bank Missions.

 Lead the team of Senior Design Engineers, Junior Design Engineers, Technical Assistants and AutoCAD operators to complete the projects within stipulated time frame and ensure the quality of the papers being produced.
 Coordination with TMAs and Project co-ordination Unit in implementation of the subprojects.
 Co-ordination with Financial Management and Institutional Development Specialist (FMIDS) to finalize financial plans;
 Co-ordination with Contract and Procurement Advisor (CPA) for the preparation of Bidding Documents.
 Representation and briefing to the Asian Development Bank regarding the submitted Appraisal & Feasibility Reports.
 Participation in briefing regarding progress and achievements of targets to Asian Development Bank Mission in light of Bank Loan Covenants, Guide Lines, Project Authorized Memorandum and Bi Annual Aide Memoirs of Bank Missions.
 Lead the team of Senior Design Engineers, Junior Design Engineers, Technical Assistants and AutoCAD operators to complete the projects within stipulated time frame and ensure the quality of the papers being produced.

Associated Consulting Engineers
Sr. Engineer/Resident Engineer (Drainage)

   Jan 1999
— Jul 2003

 Design of water supply and Sewerage/Drainage systems alongside roads for different localities of Sialkot City;

Following scope of work was covered:

 Technical Report analyzing hydrological data and study of existing water supply and sewerage/drainage system
 Review of Sewerage/Drainage Design of Rang Pura and Mujahid Road Area as per site conditions.
 Vetting of Proposals forwarded by the Contractors’ Firm as per prevailing site conditions during construction of work;
 Checking of Under Ground Layout Plans for multiple services and preparation of plans in coordination with allied/concerned Departments;
 Vetting of As-Built Plans, Drawings, and Profiles submitted by the Contractors’ firm and Liaoning with Govt. Departments, and Semi Govt. Agencies regarding the accuracy of plans and incorporation of their suggestions and requirements;

Other works related to design were:

 Preparation of

 Design Reports
 Detailed Cost Estimates
 PC-Is
 BOQs, Bidding Documents and Tender Drawings;

The scope covered the Design of following areas;

 Kashmir Road, Defense Road and Shahab Road areas
 Mujahid Road Area of Sialkot City;
 Sewerage/Drainage Scheme Rangpura-Awana Sialkot;
 Member of Design Review Committee on Planning and Design of new Projects with ACE and Design Engineer for new and ongoing projects in Sialkot City ;
 Vetting of Shop Drawings submitted by the Contractors Firm;

Other scope related to resident supervision was:

 Resident Construction Supervision of Water Supply/Drainage System in Sialkot City

 Checking layouts of drainage systems
 Approval of Check requests
 Managing testing of material at site
 Verification of material at site
 Checking of Contractors Interim payments
 Co-ordination with the other stake holders of project like PTCL, WAPDA, Highways and PHED
 Co-ordination with the Client

Associated Consulting Engineers
Sr. Engineer/Resident Engineer

   Dec 1997
— Dec 1998

 Construction Supervision of R.C.C conduit for discharge of 350 cusecs Peak storm water from Shad Bagh area Lahore into Chotta Ravi Drain.
 Construction Supervision for Laying of Sewerage System in adjacent habitations and their ultimate connection with main R.C.C conduit.
 Construction Supervision of shifting and relaying of 3”i/d to 12”i/d water supply pipe lines coming across main R.C.C conduit
 Co-ordination with the client and contractor to carry out the works within stipulated time and according to standard engineering practices
 Preparation of monthly progress reports
 Checking and vetting of Contractors’ bill of payments and Contractors’ Claims of escalation and variations at sites of works.
 Vetting of as built plans, drawings and profiles by the Contractors firm and Liaoning with Govt. Departments, and Semi Govt. Agencies;

Public Health Engineering Department
Assistant Engineer (Design)

   Apr 1992
— Dec 1997

The Planning and Design of multiple Urban and Semi-Urban Water Supply and Sewerage/Drainage Schemes in Punjab;

The detail is listed below:

 Checking of Design, Detail Drawings and Specifications of "Augmentation of Water Supply Scheme Chakwal Phase-I and Phase-II based on Khoker Zer Dam and Mial Spring" submitted by NESPAK (Pvt.) Ltd;
 Member of the design team for “Augmentation of Greater Water Supply Scheme for Murree based upon Dharjawa source ( A tributary of Jhelum River )”

 Design of Water Supply Schemes Depalpur, Heweli-Lakha, and Pattoki, Distt. Okara;
 Computer Design of Water Supply Scheme Bhalwal and Hafizabad;
 Checking and Improvement of Computer Design of Water Supply Schemes Rehmatabad, Rawalpindi and Kamoki, Gujranwala;
 Design of Water Supply Schemes Noorpur Thal and Isa Khel Distt. Mianwali, based on computer simulations;
 Design of Sewerage/Drainage Scheme Depalpur, Distt. Okara;
 Design of Sewerage & Drainage Scheme Chunian, Distt. Kasur;
 Design of Sewerage & Drainage Scheme Bhai Pheru, Distt. Kasur; and
 Design of Sewerage & Drainage Scheme Hafizabad, Distt. Gujranwala.
 The design included a stormwater drain to cater discharge of 3 cusecs to 88 cusecs in its different X-Sections in addition to the design of outfall sewers.
 Design of Sewerage Scheme Kamoke, Distt. Gujranwala.
 The design included sewerage system of 9" i/d to 30"i/d sewers, sullage carrier to take into account 13 cusecs of flow and force main 15" i/d to pump sullage water.
 Design of Sewerage and Drainage Scheme Gujrat;
 Urban Sewerage Scheme Farooq Abad Distt. Sheikhupura;
 Design of Extension and Improvement of Sewerage Scheme Narowal;
 Design of Sewerage Scheme Pindi Bhattian Distt. Hafizabad;
 Design of Sewerage Scheme Qila Didar Singh Distt. Gujranwala;
 Design of Urban Sewerage Scheme Lala Musa Tehsil: Kharian;
 Design of Extension Urban Sewerage Scheme Nankana Sahib Distt. Sheikhupura;
 Urban Drainage Schemes Pasrur, Distt. Sialkot;
 Greater Sewerage & Drainage Project for big cities of Gujranwala and Sialkot (Initial scrutiny of design submitted by NESPAK (Pvt.) Ltd.;
 Sewerage and Drainage Scheme Darya Khan Distt. Mianwali; and
 Urban Sewerage Scheme Jhelum (Phase-II).
 Design of Urban Sewerage Scheme Dina Distt. Jhelum Phase-I;
and
 Member of Scrutiny Committee of Following PC-Is for vetting, review, and finalization:
 Punjab Rural Water Supply and Sanitation Project (300 Schemes);
 Pilot Implementation Program by Non-Formal Institutions;
 Monitoring and Evaluation Cell for Institutional Strengthening of Public Health Engineering Department, Govt. of Punjab;
 Checking and Processing of Feasibility Studies & Master Planning for Sanitation Project of Murree on a long-term basis; and
 Public Awareness Campaign for Formulation of User's Committees in rural areas of Punjab.
 Prepared PC-I for “Provision of Waste Water Treatment Facilities in Rural and Semi-Urban Areas of Punjab”.

Public Health Engineering Department Government of Punjab Pakistan
Sub Divisional Officer (Site Engineer)

   Aug 1991
— Apr 1992

Plan, Design and Construction Supervision of Water Supply and Sewerage /Drainage projects of small towns and operation and maintenance of completed on-ongoing projects. The detail is given as below:

 Urban Water Supply Scheme Sargodha, based on Tube wells and Extension and Improvement of Existing Water Supply Scheme based on Canal Water Source;
 Small to Medium Rural Water Supply and Drainage Scheme in Tehsil Sillanwali District Sargodha,

Public Health Engineering Department Government of Punjab Pakistan
Assistant Engineer (Design)

   Jun 1990
— Aug 1991

Carryout scrutiny and vetting of preliminary and detailed design of water supply, sewerage and drainage projects in urban and semi-urban areas of Punjab.
Brief detail is given below:
 Urban Water Supply Scheme Sargodha, based on tube wells and Extension and Improvement of Existing Water Supply Scheme based on Canal Water Source;
 Urban Drainage Schemes Pasrur, Distt. Sialkot;
 Greater Sewerage & Drainage Project for big cities of Gujranwala and Sialkot (Initial scrutiny of design submitted by NESPAK (Pvt.) Ltd.;
 Sewerage and Drainage Scheme Darya Khan Distt. Mianwali; and
 Urban Sewerage Scheme Jhelum (Phase-II).

Yasir Usman and Co. (Pvt.) Ltd. Faisalabad Pakistan
Site Engineer

   Aug 1989
— Jun 1990

 Layout of Multi-Storey buildings
 Established and maintained site related inventories and demands
 Managed Company employed labor
 Manage and ensure availability of material
 Getting inspections of the sites made for the Client and Supervision Consultants
 Preparation of Contractors bills and interim payment bills