ARAMCO QC MANAGER, QC SUPERVISOR, LEAD ENGINEER, SECURITY SYSTEMS, SYSTEM HANDOVER LEAD, PRE-COMM MANAGER


Last Updated: 17th January 2018 (over 4 years ago)

Address
Saudi Arabia

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
Arabic, English, Hindi

Summary

15+ YEARS EXPERIENCED ELECTRONICS ENGINEER WITH A DEMONSTRATED HISTORY OF WORKING ON 4 MEGA ARAMCO AND NON ARAMCO PROJECTS IN THE OIL/ENERGY, BUILDING/INFRASTRUCTURE AND RAILWAY INDUSTRY IN THE KINGDOM. SKILLED IN SECURITY SYSTEMS DEPLOYMENT, TESTING & COMMISSIONING SUCH AS IDAS (INTRUSION DETECTION ASSESSMENT SYSTEM) SACS (SECURITY ACCESS CONTROL SYSTEM), CLOSED CIRCUIT TELEVISION (CCTV), FIBER OPTICS, TETRA, PAGA ETC AND ITS TROUBLESHOOTING. STRONG PROGRAM AND PROJECT MANAGEMENT PROFESSIONAL GRADUATED FROM SIR SYED UNIVERSITY OF ENGINEERING AND TECHNOLOGY

Education

Sir Syed University Of Engineering & Technology
BS. Electronics Engineering

   Jan 1999
— Mar 2003

Experience

NETWORK AND SYSTEM INTEGRATION CO NEC JAPAN
QA/QC MANAGER/ SUPERVISOR FOR PROJECT: YASREF YANBU ARAMCO SINOPEC REFINERY (OIL & GAS PLANT)

   Apr 2014
— Current

DUTIES & RESPONSIBILITIES
 Worked as an Aramco Approved QC SUPERVISOR for the disciplines Communication, Electrical & handled Civil, Structural, Coating, Mechanical & HVAC for special amendment package TETRA SYSTEM, also worked as a PRE-COMM MANAGER, SYSTEM HANDOVER LEAD and as an ACTING QC MANAGER at intervals whenever required.
 Managing the team, supervising daily site activities to resolve all site issues to ensure the site readiness for the inspection.
 Plan and review project quality documentation to assure all QC deliverables required under the agreement are processed in time so as to guarantee they are accomplished.
 Involved in the preparation of method of statements, pre-commissioning procedures and all the required reporting’s to the Yasref Dept. such as QMR (Quality Management Report), TWLA (Two week lookahead), all logs RFI (request for inspection), NCR (non-conformance report), INCR etc.
 Assuring implementation of applicable ITP & work instructions, procedures in accordance with project scope of work and standards.
 Planned QC manpower resources to manage the project quality control team to ensure all inspections and test are performed with required criteria.
 Verified that the quality related site activities are in accordance with the applicable codes and standards.
 Assured all technical documents relative to site quality control is at updated status.
 Involved in project audit for 60% construction completion progress as per schedule Q, and Management Review Meeting(MRM) within 2 weeks after completion of audit assuring and delivering meeting results to the management.
 Coordinating with construction team and their lead engineer for the rectification of concern snag list and preparation for the Redline drawings.
 Attending and organizing weekly Quality Meeting as CHAIR-PERSON with Aramco inspection department and Project management personals.
 Implemented document control and review procedure to ensure the security and control of drawings
 Following up with Quality team for the ongoing construction activities as per two weeks look ahead schedule.
 Coordinating with the team members and technicians, inspecting the progress and technical activities implementing the system as per ARAMCO STANDARDS.
 Discussed the major issues in the site with ARAMCO TEAM and its troubleshooting.
 Always ensured to close of all Discipline’s LBE’s (LOG BOOK ENTRY) on time once it has been issued from the Client.
 Conducted SAT for IDAS & SACS system in presence of YASREF IT & SECURITY and HCIS member.
 Performed Pre-Commissioning activities on the remaining systems which were handover to me.
 Working on Project Record Books and Project Close Out.
 The systems under scope at YASREF are
1. PUBLIC ADDRESS/GENERAL ALARMS (PA/GA).
2. SECURITY ACCESS CONTROL SYSTEM (SACS).
3. IDAS SYSTEM (INTRUION DETECTION ASSESMENT SYSTEMS) which comprise of 3 systems FOFFS (fiber optics fence secure system), MIDS (microwave intrusion detection system), CCTV (closed circuit television)
4. METEOROLOGICAL SYSTEM (METS)
5. TETRA SYSTEM (TET SYS)
6. DATA NETWORK SYSTEMS (LAN/WAN & WIRELESS LAN)
7. PREMISES DISTRIBUTION SYSTEM (PDS)/STRUCTURED CABLING SYSTEM, TELECOM FOC, FOC INSTALLATION SPLICING & TESTING (OTDR), (LSPM), CHROMATIC DISPERSION (CD)/POLARIZATION MODE DISPERSION (PMD).
8. TELEPHONE SYSTEM, VOICE CONFERENCING & ALERTING
9. INFORMATION PROTECTION SYSTEM (IPS).
10. ENTERTAINMENT SYSTEMS (ENT SYS)
11. TELECOMS NETWORK MANAGEMENT SYSTEM (TNMS)
12. VIDEO CONFERENCING SYSTEM (VCS)

SBM SAUDI BUSINESS MACHINES
LEAD SECURITY SYSTEMS ENGINEER FOR PROJECT: KAPSARC SAUDI ARAMCO-KING ABDULLAH PETROLUEM STUDEIES & RESEARCH CENTER

   Dec 2011
— Apr 2014

DUTIES & RESPONSIBILITIES
 Involved in the INSTALLATION for below mentioned SYSTEMS,
 CLOSED CIRCUIT TELEVISION (CCTV), HONEYWELL
 SECURITY ACCESS CONTROL SYSTEM. HONEYWELL
 VIDEO SURVEILLANCE & VIDEO MANAGEMENT SYSTEM HONEYWELL
 VIDEO WALL SECURITY SYSTEM HONEYWELL
 VIDEO PERIMETER SURVEILLANCE HONEYWELL
 FIRE ALARM, EXTINGUISHING, EVACUATION SYSTEM HONEYWELL
 GATE SECURITY SYSTEMS INVOLVED CRASH BARRIERS, DROP ARMS, GATE BARRIERS, STOP/GO TRAFFIC LIGHT, UVIS UNDER VEHICLE INSPECTION SYSTEM, LICENCE PLATE REGISTRATION SYSTEM (LPRS),
 HONEYWELL - PRESSURE TRANSMITTER (PT), LEVEL TRANSMITTER, TEMPARATURE TRANSMITTER, FLOW TRANSMITTER, SENSORS, UDA SERIES ANALYZER pH/ORP mounting.
 PEDISTRIAN SCREENING SYSTEMS INVOLVED X-RAY SCREENING, WALK THROUGH METAL DETECTOR (WTMD), HAND HELD METAL DETECTOR WANDS, HANDHELD TRACE DETECTORS, AND TURNSTILES.
 (ESS) EMERGENCY SIREN SYSTEM
 PERIMETER INTRUSION SYSTEM (PID) involves (FOFSS) FIBER OPTICS FENCE SECURITY SYSTEM & HOLD-UP ALARM SYSTEM.
 WAP, WLAN.
 STRUCTURED CABLING, TELECOM FOC, FOC INSTALLATION SPILICING & TESTING (OTDR)
 Implementation according to installation drawing which involves block diagram, rack layout, terminal equipment installation details, configuration data, location layout, etc...
 Specifically involved in the installation part of CLOSED CIRCUIT TELEVISION (CCTV), SECURITY ACCESS CONTROL SYSTEM, GATE SECURITY SYSTEMS in the RESEARCH CENTRE (ICONIC AREA), RESIDENTIAL AREA, UTILITY CENTRE
 Installing the HONEYWELL IP BASED CCTV PAN TILL ZOOM (PTZ) Cameras, FIXED Doom Cameras,
 Configuring and assigning IP’s to HONEYWELL CCTV according to their placements.
 Coordinating with the team members and technicians, inspecting the progress and technical activities implementing the system as per ARAMCO STANDARDS.
 Discussed the major issues in the site with ARAMCO TEAM and its troubleshooting.
 HONEYWELL SACS all the card readers looping connection was done with respect to design drawings and its termination with respect to the design provided by HONEYWELL.
 Worked as an approved replacement QC INSPECTOR for SECURITY SYSTEMS and performed all the inspection duties as per ARAMCO STANDARDS in the presence of ARAMCO PMT & PID
 Following up for the redline and as-build drawings.
 Integration of HONEYWELL FIRE ALARM SYSTEM with PUBLIC ADDRESS SYSTEM.

THALES SECURITY SOLUTIONS SERVICES CO
TEAM LEAD ENGINEER FOR PROJECT: MMMP AL MASHAEER AL MUGHADDASAH METRO PROJECT

   Jan 2010
— Dec 2011

DUTIES & RESPONSIBILITIES
 Involved in the INSTALLATION, MAINTENANCE, TESTING AND COMMISSIONING for LOW VOLTAGE SYSTEMS PUBLIC ADDRESS SYSTEM (PAS), PASSENGER INFORMATION DISPLAY SYSTEM (PID), TIME DISTRIBUTION SYSTEM (TDS), CLOSED CIRCUIT TELEVISION (CCTV), ACCESS CONTROL SYSTEM (ACS) SCADA.
 Conducted ITP, (IVT) INSTALLATION VALIDATION TEST AND (PAT) PARTIAL ACCEPTANCE TEST FOR ALL 9 STATIONS FROM ARAFAT TO JAMARAT in presence of members from CRCC, RSDC (ATKINS) and DBI INTERNATIONAL.
 Implementation according to installation drawing which involves block diagram, rack layout, terminal equipment installation details, configuration data, location layout, etc...
 Specifically involved in the installation part of CLOSED CIRCUIT TELEVISION (CCTV) PUBLIC ADDRESS SYSTEM (PAS) and PASSENGER INFORMATION DISPLAY SYSTEM (PIDS), SCADA in the stations and depot areas.
 Installing the CCTV PAN TILL ZOOM (PTZ) Cameras, Doom Cameras, FCC Fixed Crowd Counting Camera
 Installing the Station Announcement Point (SAP), Ambient Noise Sensor (ANS), Speakers (cad10, Rcs6, MHZ30 of types), Fire Microphone System (FMS), Station Master Console (SMC), Departure Time Indicator (DTI), Passenger Information Display System (LCD’s) in all stations platform, Operational Control Center (OCC), Admin building and depot area.
 Configuring and assigning IP’s to DTI’s and PID’s according to their placements.
 Coordinating with the team members and technicians, inspecting the progress and technical activities implementing the system as per design.
 Testing the speaker and selecting the wattage tapping for the speaker in accordance with the acoustic studies.
 Discussed the major issues in the site with Integration engineer and its troubleshooting.
 All the speaker looping connection was done with respect to design drawings and its termination.
 Installing the LCD of single sided and double-sided displays in the station platforms and depot terminations.
 Integration of FIRE ALARM SYSTEM with PUBLIC ADDRESS SYSTEM as per design.
 Member of Rapid Response Team during Hajj Time.

SEMECO AL-RAJHI GROUP
SITE ENGINEER FOR PROJECT: TAMKEEN TOWERS RIYADH 68 FLOOR HIGH RISE COMMERCIAL TOWER

   Oct 2009
— Jan 2010

DUTIES & RESPONSIBILITIES
 Designing for all the LOW CURRENT SYSTEM.
 Making single line diagram for the LOW CURRENT SYSTEM on the layouts.
 Reviewing the specifications for the L.C.S. after complete coordination with the suppliers of the same.
 Incorporating the frequent changes in the L.C.S so as to cope up with the highly demanding supplier needs.
 Working on the interface of the legacy systems with the smart system with their own operating system, once again coordination with the supplier is needed for the same.
 Checking of the design hence to be submitted to the client for the approval.
 Reviewing the shop drawing made for the low current system by the contractors to see its compliance with the design and harmony with the installation.
 Reviewing the technical submittals hence forwarded by the contractor for the approval and hence to be send to the client.
 Attending meetings with the clients to see their requirement and hence incorporate the same in the design and bill of quantity. B.O.Q.
 Attending seminars conducted by the suppliers.
 Inspecting the progress and technical activities. Implementing the system as per design.
 Guide and supervise the team, involving design, estimation, men & material management.
 Monitoring day by day site work
SYSTEMS DEALT WITH
FIRE ALARM SYSTEM, PUBLIC ADDRESS SYSTEM: CCTV SYSTEM: MASTER CLOCK SYSTEM
ACCESS CONTROL SYSTEM, DATA SYSTEM STRUCTURED CABLING, PABX SYSTEM