Planning Engineer


Last Updated: 20th March 2018 (over 4 years ago)

Address
Pakistan

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English, Urdu

Summary

Petroleum Graduate from NED University having more than 05 years of Work Experience in Oil & Gas Sector especially in Pipeline Laying, Wellhead Construction, Plant Dismantling & installation Projects as a Project Planning Engineer.

Education

NED University of Engineering & Technology
Petroleum Engineer

   Jan 2009
— Dec 2012

Studied about Oil & Gas Plant Equipment & Process, Reservoir, Drilling etc.

Experience

Pipelink Construction (Private) Limited
Planning Engineer

   Dec 2014
— Current

Duties & Responsibilities in Projects:

• Submitting daily Progress Report & Strength Report of all Disciplines to Client.
• Attending Client & Internal meetings
• Updating Daily Progress Monitoring Sheet.
• Submitting Weekly Over head Schedule to Clients.
• Prepared weekly & Monthly Progress Reports & Over heads For Next Month
• Up Loading all Activities Status on Primavera P6.
• Update S-Curve Using Earned Value b/w Planned Vs Actual Progress % of
Estimated Wts.
• Prepared Progress Graphs of Duration & Cost Vs Actual & Planned %
Progress.
• Prepared Activities Progress bar chart.

PROJECTS

Client : Pakistan Petroleum Limited (PPL)
Duration : 19-Sep-17 to Date
Project Detail : Relocation of Rehmat Gas Plant (RGP) and setting up as
Gambat South Gas Processing Facility GS GPF-IV”. The
project includes dismantling, transportation Installation with
commissioning assistance of whole Gas plant.

Client : Oil & Gas Development Company Limited (OGDCL / ZEL)
Duration : 01-Jun-15 to 28-Aug-17
Project Detail : Installation / Supply of Flow lines approx. 170 KM, 30
Wellheads, Compressors Installation & Gas Gathering facilities
etc at KPD. (PC-1).

At Head office:

• Tender’s Evaluation
• Tender package preparation
• Project Scheduling in Primevera P6 & MS Project 2010
• Resource Loading & S-Curves
• Labor & Equipment Histograms
• Site Work Monitoring & Monitoring sheet preparatoin & maintaining.
• Preparation & Updation of S-Curves & Histograms b/w Planned Vs Actual
Progress % of Estimated Wts.
• Attended various Pre-Bid, Bid Opening & Site Visits Meeting for many
Companies including PARCO, UEP, SSGC, SNGPL, ENI, OMV, OGDCL,
PPL, Engro, FTTL etc.

BST Services
Project Planning Engineer

   Apr 2013
— Nov 2014

Responsibilites:
• HAZOP Scriber for HAZOP Study under the supervision of HAZOP Chairman
& developed HAZOP detailed Report
• Project Scheduling in Primavera P6 & MS Project 2010
• Controlling & Monitoring Project Schedule and Resource Loading & S-Curves
• Tender’s Evaluation & Develop required technical Documents at the initial
stage
• Established Procedures of Dismantling, Installation, Pre-Commissioning,
Commissioning, Transportation, Rigging etc.
• Equipment Technical Evaluation & P&IDs, PFDs Evaluation
• New Equipment PO preparation e.g. HCDP unit, Condensate Stabilization unit
etc.
• Prepared Pre-qualification Documents for OMV

PROJECTS CONTRIBUTED

Client : Pakistan Petroleum Limited (PPL)
Duration : 01-June-14 to 30-Nov-2014
Project Detail : Dismantling, Relocation & Installation of Chachar Oil & Gas
Plant to Shahdad Wellsite, The project includes dismantling,
transportation Installation with commissioning assistance of
whole Oil & Gas plant.

Client : Pakistan Petroleum Limited (PPL)
Duration : 2 Years Blanket Project (2013 to 2014)
Project Detail : Maintenance of “Cathodic Protection” system at Kandhkot Gas
field

Client : Pakistan Petroleum Limited (PPL)
Duration : 01-Apr-14 to 31-May-2014
Project Detail : Construction/Welding and installation of 4 inch Dia buried and
above ground Pipeline from Chachar gas field to Kandhkot field.

Client : Pakistan Petroleum Limited (PPL)
Duration : Nov-2013 to Mar-2014
Project Detail : Replacement of bottom plates of Condensate storage tanks at
Adhi Gas Field.

Client : Pakistan Petroleum Limited (PPL)
Duration : June-2013 to Oct-2013
Project Detail : Drilling Site preparation and executed Conductor Casing run to
41 m depth using Drilling machine at Falah X-1 Shahdad-pur
Gambat block.