Senior Planning Engineer
Aug 2016
— Current
• Development of integrated master schedules for specific programs in Primavera and/or Microsoft Project that reflect all interface milestones and activity durations from multiple contractors’ schedules and feed changes to the integrated master schedule.
• Assist with disputes resolution and claims planning matters including construction sequence, delay and disruption analysis
• Evaluate EOT claims / change orders and make recommendations
• Review, analyze, monitor and report progress of Contractors regularly updated progress schedules and forecasts, resource histograms, progress curves and current versus baseline comparisons.
• Review/reschedule activities not matching the planned duration to minimize or eliminate any impact on the critical path. Report on the impact of any such rescheduled activities.
• Prepare and develop appropriate detail summary project control schedules and incorporate summary level contractor schedules. Analyze and assess key critical paths and the impact on program.
• Work with project managers and provide appropriate support for finance control, risk and resources allocation and ensure schedule input to the change management procedure.
• Review and audit Contractor related procedures and processes and ensure the integration of scheduling construction site and compatibility with deliveries of drawings, materials and equipment.
• Daily monitoring (through site supervision reports and follow up with site supervision personnel) of contractor progress including materials delivered, materials installed, labour resources employed, equipment resources utilized and other statistical management
• Produce weekly / monthly reports in line with the project and company reporting calendar, providing details on progress, actual, forecast and explanation of variances. • Prepare various presentation and progress reports including Dashboard of all project control activities.
Senior Planning Engineer
Apr 2015
— Jul 2016
• Coordination with Engineering Manager for the issuance of balance engineering deliverables.
• Follow up with Procurement manager for remaining issuance of PO and delivery expedition at site.
• Updating and verifying the progress in EDDR and PCR and construction register.
• Preparation, Detailed study and review of daily, weekly and monthly reports.
• Prepare and update three weeks and three months look-ahead schedule that reflect the priority activities.
• Fully understand Project planning & scheduling, Critical Path, Total Float, Free Float, Negative Float, crashing, Acceleration & fast tracking etc.
Construction Planning Engineer
Jul 2012
— Mar 2015
• Preparation of baseline schedule, latest forecast plans using Primavera P6.
• Preparation of Manpower and equipment deployment charts and manpower histograms.
• Performing Earned Value Analysis (EVM) & preparation of KPI’s for performance measurement.
• Monitoring of activities on critical path and sending regular feedback to management for necessary actions.
Projects:
Assistant Planning Engineer
Jan 2012
— Jun 2012
• Developed integrated level IV baseline schedules for assigned project based on execution philosophy, scope of work and contractual requirements.
• Created progress measurement system aligned to project work breakdown structure (WBS) and contract specifications based on project complexity.
• Prepared progress on daily, weekly & monthly basis. Prepared S-curves, man-hour histograms and analyzed delays & productivity using earned value management.
• Updated master schedule of the project & micro-schedules of major components of the project.