SHIFT MANAGER, SHIFT CHARGE ENGINEER, DAY SHIFT ENGINEER, DEPUTY MANAGER OPERATIONS


Last Updated: 29th May 2017 (over 5 years ago)

Address
Pakistan

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Punjabi, Urdu

Summary

 15 years extensive and versatile experience in Power sector including CCPPs and thermal power plants in the capacity of Shift Charge Engineer and Operations Engineer. Expertise includes Operation of the Gas Turbines, Steam Turbines, HRSGs, and associated Auxiliaries.
 Commissioning experience as Lead Operations Engineer of Uch-II Expansion Project (404 MW CCPP).
 Involved in preparation of operations department budget and purchase of operations related materials.
 Working expertise and skills of Power Purchase Agreement, Gas supply agreement and O&M agreement.
 Authorized Safety controller by Engie / International Power Safety Rules to perform isolations, de-isolations, switching up to 220KV related to Safety from the system.
 Worked on variety of maintenance management softwares for preventive and corrective maintenance and Permit system software, including Maximo, Nisoft (Eclipse V2.0, V3.0) lotus and oracle.
 Working experience of Historian and live data software EDNA Trend 4.0
 Working experience of different Distributed Control system softwares, SCADA and Gas turbine control systems including ABB DCS operation, Honeywell DCS Experion PKS R400, EMERSON DCS, PLCs, Advant Power Control, GE Mark-IV, Mark-VI and Mark VI-e.
 Well versed about chemistry requirements of plant process and equipments including cooling water, boiler feed water and steam, demineralization and RO plant.
 Experience to act as Incident controller during emergency conditions.

Education

UET TAXILA
BSc Mechanical Engineering

   Apr 1997
— Oct 2001

Graduation in Mechanical Engineering including following major subjects: Thermodynamics, Fluid mechanics, Electrical Technology , Engineering Drawing, Project management, Power Plants.

Experience

ENGIE (Uch Power Station 990 MW CCPP Pakistan).
Assistant Manager Operations

   May 2013
— Current

My Assignment is at Uch-II which consists of 02 gas turbines, [GE Frame PG 9171E], Control system: Speedtronic Mark-VI-e, each having 128.180MW capacity, two triple pressure (HP, IP, and integral Deaerator with LP drum) HRSG, one Steam turbine (Fuji Electric having 133.06 MW capacity), Honeywell DCS and associated auxiliaries.

QEWC ( 2200MW & 178 MIGD Co-generation CCPP Qatar)
SHIFT SUPERVISOR

   Jul 2011
— Apr 2013

My assignment was at RAF-B Generation Island which consists of:
 03 Gas Turbine units of GE-9FA, 216.2MW at 50°C with control System ‘Speed-tronic Mark-VI’ and associated WHRB [NOOIER/ERIKSEN-560 Tph, 27 bar drum pressure & 240°C temp.]
 08 Gas Turbine units of ABB/ Alstom [ABB 13E2-164.3 MW] / [Alstom 13E2-161MW] with control System Eagatrol-P/ ADVENT Power- Control and associated WHRB [ABB-329 Tph, 15 bar drum pressure & 200°C temp.]

KAPCO (1600 MW CCPP Pakistan)
SHIFT ENGINEER

   Sep 2008
— Jun 2011

KAPCO has 03 Blocks. My assignment was at Block-III for one year and afterwards on Block-II having capacity of 600 MW.
 Block-II: 04 Frame 9E Gas turbines (Model: MS9001E, Make: ALSTHOM France, Control system: Speed tronic Mark-IV) each with rated capacity of 94.65 MW on FO at 15°C, two single cylinder steam turbines Model: VEGA 209 110B, Make: RATEU France, with rated capacity of 103.4 MW.
 Block-III: 02 M/S Siemens (Germany) Gas turbines V94.2 each with rated capacity of 143.8MW on gas at 15°C, one Siemens steam turbine with rated capacity of 148.6 MW.