Working as Offshore Multidiscipline & Instrument/Electrical Engineer since 1997 and have the experience in following fields described in brief and detail is given in company wise experience.
• Multidiscipline engineering Offshore Oil Fields campaign on 28/28 rotation basis to ensure all activities on the barge are in line with Company Rules/Contract/Design/Safety.
• EPC Project Engineering (FEED, Engineering, Procurement, construction and commissioning).
• Maintenance Instrument/Electrical Engineering ( Procurement and maintaining level of spare parts for emergency handling. Emergency response for running plant problem. )
• Shut down activities.
• Team leading.
• Worked on Honeywell DCS TDC 3000 and Foxboro DCS I/A series.
• Well versed with various international standards like ISA, NEC, API, etc.
• Well versed with Safety analysis (HAZOP, HAZAMS, HSE, JSA, CARE)

Education

University of Engineering & Technology Lahore Pakistan
Electrical and Instrument Engineering

   Feb 1991
— Jun 1996

Graduate Engineering

Experience

Brunei Shell Petroleum Negara Brunei Dar-Us-Salam
Company Site Representative (CSR) offshore Oil Fields

   Jan 2012
— Current

Working as Company Site Representative (CSR) offshore Oil Fields in multidiscipline engineering field at barrage for offshore campaign on 28/28 rotation basis with following responsibilities.
• Provide site leadership in barrage for main Contractors and Subcontractors.
• Ensure a good coordination and communication within his team, and promote team working.
• Arranging the progress meetings and video conference meeting with management at on-shore office.
• Take responsibility for the site contractual and technical issues, in liaison with Area Superintendent.
• Ensure that all work is carried out in accordance with the scope of the contract and that any variances are fully documented.
• Monitor /drive the execution of the contractor construction schedule and measure progress against Planning.
• Manage the site construction team.
• Ensure staffs are effectively implementing the project specifications and procedures to ensure quality/schedule/cost of construction activities.
• Clarify in advance technical difficulties or queries of construction.
• Front line at site to handle the change orders and coordinate project engineer to technically agree on the changes.
• Ensure material is available at site to avoid the construction delay.
• Present and promote the key/ important information (such as HSE targets, work progress) to the working team and alert working teams if major risks are concerned during morning tool box talk.
• Daily reporting line manager regarding the highlight activities, work progress, HSE, issues/ concerns, change orders.

Saudi ARAMCO Mobil Refinery ( SAMREF )Yanbo Al Sinaiyah Kingdom of Saudi Arabia
EPC Project Design Engineer (Electrical & Instrument)

   Aug 2007
— Jan 2012

Worked as EPC Project Design Engineer (Electrical & Instrument) with following responsibilities.
• Complete EPC project work.
• Study and preparation of Concept Development Package for Front End Engineering Design (FEED).
• Preparation of detail project engineering design work for the construction with incorporation of comments received from all concerned sections.
• Guiding the designer for designing the drawings of project.
• Safety analysis (HAZOP, HAZAMS, HSE, JSA, CARE) of project.
• Calculation of man hour and man power estimation for the project.
• Project cost estimation and preparation of budget for project.
• Generation of bill of materials for project.
• Procurement of project material and inspection of received material.
• Conducting the meeting relating to projects.
• Making the schedule of project and controlling the activities of project according to the schedule.
• Preparation of project progress report for presentation to management.
• Coordinating completion of construction activities and preparing Punch List to ensure the readiness of systems for start-up.
• Calculation of electrical load for project, transformer, circuit breaker and cable sizing.
• Preparation of bid documents, RFQ initiation.
• Technical evaluation of Vendor Quotation/documents and PO recommendation.
• Procurement and installation of Foxboro DCS I/A series hard for project and DCS configuration.
• All work is carried out through SAP.
• Following are some highlights of my projects.
 Upgradation of existing instrumentations
 Installation of BENTLEY NIVADA Trend Master Pro for vibration monitoring of different machines.
 Installation/upgradation of addressable and non-addressable fire alarm system.
 Different modifications at plant.
 Complete electrical work for new buildings in SAMREF which includes lightings, ACs, public addressing system, fire alarm system, internet/telephone etc.
 Up-gradation of AC system in SAMREF different buildings.
 Installation of G & M Make public address system in SAMREF for
Security Purpose.
 Up-gradation of elevator operator control system Panasonic PLC
based CJ Anderson make.

Pak-Arab Fertilizers (Pvt.) Ltd. Multan Pakistan
Assistant Manager (Electrical and Instrument Maintenance)

   Jan 1997
— Jan 2007

Worked as Assistant Manager (Instrument Maintenance) with responsibilities of maintenance and up gradation of plant. I converted my assigned plant 80% from pneumatic to electronic instruments as a team leader. Following were my responsibilities.
• Managing technical staff.
• Calculation of man hour and manpower estimation for any task.
• Planning the preventive maintenance schedule.
• Planning the annual and emergency shutdown schedule and controlling the activities according to schedule.
• Procurement and maintain the stock of different spare parts for emergency handling.
• Trouble shooting of problems during running plants on emergency basis.
• Technical guidance to staff for trouble shooting.
• Maintenance of relay logic based ESD HIMA interlocking system.
• Maintenance of ALLEN BRADLEY PLC based SAAKE BURNER.
• Maintenance and trouble shooting of all type electronic and pneumatic instruments like pressure, flow, level, temperature, magnetic and vortex flow transmitters, controllers, indicators, recorders, control valves etc and guiding the staff for Configuration, calibration etc.
• Installation, maintenance of FOXBORO SLC controller, paperless recorders, indicators.
• Preparing the annual budget.
• Complete work from budget making up to the procurement, installation commissioning and then maintenance of instruments.
• Inspection of received material.