Instrument Engineer


Last Updated: 14th August 2018 (over 4 years ago)

Address
Indonesia

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Masters

Languages
English

Summary

Detail-oriented engineer with 15 years of Experience in the Oil / Gas Company, Mining Company, and EPC Company. Well-recognized technical leadership in discovering (addressing) potential saving (issues) and strong capabilities in Instrument Engineering Design, Field Instrument Construction, and Commissioning.
Looking for challenging position with wider responsibility in related areas.

Education

Institute Technology of Bandung, www.itb.ac.id
Master in Mechanical Engineering

   Aug 2014
— Aug 2016

Experience

Total E&P Indonesie
Commissioning Leader

   Jan 2015
— Current

Main Responsibilities :
o Conduct the jobs in compliance with Company's HSE Principles, Procedures, Standing Instruction, International Standards & Codes.
o Perform commissioning activities based on standard commissioning practices and OPERCOM methodology.
o Organize the resources availability during commissioning preparation and execution to ensure the deliverability of commissioning activities as per scheduled.
o Supervise multi discipline commissioning activities (Piping/Process, Electrical and Instrument)
o Liaise with other parties involved (Contractors, Field Operations, Drilling, etc) to ensure the commissioning activities are executed as per planned.
o Manage punch list after RFC as per procedures and provide input to evaluate requirement from FO with regards to specification, SOP and operability.
o Coordinate with Project Team to integrate the commissioning activity to the overall project schedule.
o Manage hand over process to Field Operation.

Selected Achievements
Commissioning for Well Connection Project in Tunu South Processing Area (On Going)
Commissioning for Bekapai Development Project 2B (Completed in 2015)
Commissioning for Sisi Nubi Offloading Pump Project (Completed in 2014)
Punch List Clearance of Sisi Nubi 2B (Completed in 2015)

Total E&P Indonesie
Instrument Commissioning Superintendent

   Jan 2013
— Jan 2015

Main Responsibilities :
o Conduct the jobs in compliance with Company's HSE Principles, Procedures, Standing Instruction, International Standards & Recommendations, etc
o Perform commissioning activities based on standard commissioning practices and OPERCOM methodology.
o Supervise Instrument Discipline Supervisor in daily activity
o Define system, subsystem list and batteries limit and identify priorities.
o Define and prepare Operational Test Procedure.
o Define indicator for measurement of progress during engineering phase.
o Review and comment Contractor SAT and E&I pre-commissioning & commissioning procedure and schedule
o Support to contractor and Company for implementing ICAPS database to provide reliable data for management such as : Tasks, Man-hours, Punch List, and progress.
o Coordinate with Project Team to integrate the commissioning activity to the overall project schedule.
o Manage hand over process for Instrument Discipline to Field Operation

Selected Achievements
Commissioning for Peciko 7B Project, a New Tripod Wellhead Platform (Completed in 2014)

Total E&P Indonesie
Lead Instrument Engineer

   Jan 2010
— Jan 2013

Main Responsibilities :
o Conduct the jobs in compliance with Company's HSE Principles, Procedures, Standing Instruction, International Standards & Recommendations, etc.
o Responsible in overall for Instrument Design Engineering, which includes work program & planning, inspection and survey report review, contract development and evaluation.
o Participate in HAZOP and Risk Assesment activity.
o Participate in SIL Allocation workshop.
o As part of In-House Engineering, Performing Detail Engineering for PCS System as part of Well Development.
o As part of In-House Engineering, Performing Detail Engineering for WHCP, Wellhead Control Panel, as part of well development. WHCP, as well logic solver, is combined with Modicon PLC as PCS System.
o As part of In-House Engineering, Performing Instrument Sizing/Calculation for Detail Engineering design such as : Control Valve, Restriction Orifice, Orifice, and Pressure Safety/Relief Valve) and selection prior to issue quotation from vendor.
o As part of In-House Engineering, Performing Hydraulic Sizing and Instrument Gas Consumption during Wellhead Control Panel Engineering.
o Supervise and Mentoring for Junior Engineer and Senior Engineer during Detail Engineering Phase.
o Supervise Instrument Drafting team during In-House Engineering
o Prepare Detail Scope of Work for any instrument engineering works which is performed by contractor.
o Coordination and communication to external parties through external communication department for instrument and control system related issues, local community relation, report and proposal presentation to authority, coordination with company partners.
o Project Supporting during Instrument Construction and Commissioning activity.
o Manage Basic and Detail Engineering for green field project, in which Engineering Documents are prepared by Contractor.

Selected Achievements
Instrument Basic and Detail Engineering of Sisi Nubi 2A Project, New Extension Platform MWPS and WPN2 in (Completed in 2010)
Instrument Basic Engineering Tunu Shallow 2A/13C Project Well Development (Completed in 2010).
Study of CPA Control Room Relocation (Completed in 2013)
Engineering Study for Peciko 8A, Low Low Pressure (LLP) Compressor (Completed in 2013)

Total E&P Indonesie
Senior Instrument Engineer

   Jan 2008
— Jan 2010

Main Responsibilities :
o Conduct the jobs in compliance with Company's HSE Principles, Procedures, Standing Instruction, International Standards & Recommendations, etc
o Coordination with other entities, Safety, Process, Field Operation, and Construction team during Detail Engineering stage.
o Participate in HAZOP and Risk Assesment activity.
o Participate in SIL Allocation workshop.
o As part of In-House Engineering, Performing Detail Engineering for PCS System as part of Well Development. PCS System is designed by using Modicon PLC.
o As part of In-House Engineering, Performing Detail Engineering for WHCP, Wellhead Control Panel, as part of well development. WHCP, as well logic solver, is combined with Modicon PLC as PCS System.
o As part of In-House Engineering, Preparing Instrument Data Sheet, Hook Drawing, Instrument Cable Lay Out, Loop Diagram, Interconnection Diagram, and Basic Design as per Total E&P Indonesie general specification.
o As part of In-House Engineering, Performing Instrument Sizing/Calculation for Detail Engineering design such as : Control Valve, Restriction Orifice, Orifice, and Pressure Safety/Relief Valve) and selection prior to issue quotation from vendor.
o As part of In-House Engineering, Performing Hydraulic Sizing and Instrument Gas Consumption during Wellhead Control Panel Engineering.
o Participate in Instrument&Control System Factory Acceptance Test (FAT). Scope of FAT start from RTU/PLC Testing until DCS Monitoring.
o Participate in Wellhead Control Panel Factory Acceptance Test (FAT). Scope of FAT is done in Hydraulic or Pneumatic Circuit.

Selected Achievements
Instrument Detail Engineering of Peciko 7A Project, New Extension Platform MWP A, MWP B and SWP E in (Completed in 2009)
Instrument Detail Engineering for Various site Modifications (Completed in 2008-2009)
Instrument Detail Engineering for Various Well Connection Project (Completed in 2008-2009)
Detail Instrument Engineering for EAR (Engineering Assistance Request)

Total E&P Indonesie
Senior Instrument Construction Supervisor

   Dec 2004
— Dec 2007

o Conduct the jobs in compliance with Company's HSE Principles, Procedures, Standing Instruction, International Standards & Recommendations, etc
o Supervise Instrument Contractor for any construction works in TOTAL premise.
o Prepare Instrument Construction Planning
o Manage any Documents for RFC (Ready for Commissioning Purpose) prior to hand over to commissioning activity.
o Coordinate with site entity Field Operation, Safety for smooth transfer of construction results.

Selected Achievements
Installation of New SSS and F&G System Revamping, using SIEMENS S7 F/FH PLC, CPA PROCESS PLATFORM TOTAL E&P INDONESIE (completed in 2006)
Installation and Commissioning the First Liquid Metering System using Mass Flow Corriolis and AGAR Water Cut at CPA, Handil Field Total E&P Indonesie (completed in 2005)
Installation and Commissioning the First Compressor Anti Surge System using CCC Controller in CPA Platform (completed in 2005)
Completed Installation and Commissioning Field Instrumentation and Compressor Control System using SLC 500, TPA Process Area Total E&P Indonesie (completed in 2006)
Installation and Commissioning various Well Connection project for Gas Well and Oil Well, at Wellhead Platform, HANDIL FIELD and Peciko Offshore Field TOTAL E&P INDONESIE (completed in 2004-2006).

International Nickle Company
Instrument Engineer

   Jul 2003
— Dec 2004

o Prepared Instrument Basic Engineering Design for several projects in Process Plant and Supervise Instrument Construction Job at PT INCO, Soroako, South Sulawesi, Indonesia.
o Managed small to medium scale of Process Plant projects and responsible for Instrument Contract Job to contractor.
o Prepare Instrument Data Sheet, Loop Diagram, Interconnection Diagram, Cable Lay Out, Cable Schedule and Hook Up Diagram.
o Prepare Instrument Material Take Off, Cost Estimate, Project Schedule and Man Hours for supporting budgeting plan.
o Prepare instrument sizing (Control Valve, Restriction Orifice, Orifice, Pressure Safety/Relief Valve) and selection prior to issue quotation from vendor.
o Logic Process engineering for supporting Process Plant activities.

Selected achievements and projects:
Maintained ‘perfect’ safety record, no accident during project execution.
Completed design and installation Air Instrument Optimization projects, that decrease air consumption to 25% than before. The Process logic is modified by using weighing system instead of timer. Modification logic was done by using PLC 5
Perform Engineering and Construction Soluble Nickle Reclaim System. The New system could reduce slurry contain in waste water to 50 % of liquid mass. Modification logic was done by using PLC 5.

Tripatra Engineering and Contractor
Instrument Engineer

   Jun 2001
— Jun 2002

o Prepare Detail Engineering design such as: Instrument Data Sheet, Sizing and calculation, Hook Drawing, Instrument Cable Lay Out, Loop Diagram, Interconnection Diagram, and Basic Design as per BP WEST JAVA general specification.
o Prepare instrument sizing (Control Valve, Restriction Orifice, Orifice, Pressure Safety/Relief Valve) and selection prior to issue quotation from vendor.
o Prepare instrument requisition document, based on Instrument Basic Design.
o Review and prepare technical tabulation for vendor’s quotation.
o Review and Modify Cause and Effect chart and Shut down logic diagram.
o Witness for DCS and PLC system refers to Process Description, Cause and Effect chart and Shut down logic diagram.

Ad
Ad
Ad