Resume of Momenul Hoque


Last Updated: 16th December 2017 (over 4 years ago)

Address
Bangladesh

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
English

Summary

Experience; About 08 Years (4 years in Erection and commissioning in Oil and Gas sector, rest experience in CCPP, IC & E Maintenance) having Strong commitment towards Health, Environment and Safety.

1. Haripur Power Ltd (Ex-AES), A 360 MW Combined Cycle Power Plant of Pendekar Energy. (A Malaysian based Multinational company)
Location : Kuripara Bazar, Haripur, P/S: Bandar Narayanganj-1411, Bangladesh
Position : IC & E Engineer (Maintenance)
Duration : 7th May, 2014 to continue
1
2. Super petrochemical (pvt) limited (First petrochemical project in Bangladesh)
Location : Juldha, Karnofhuly, Chittagong.
Designation : Assistant Manager (Electrical and Instrument)
Duration : 7th May,2011 to 07th May, 2014

3. Samuda Chemical Complex Ltd. (Caustic Chlorine plant)
Designation : Shift In-Charge (Electrical and Instrument)
Duration : 17th July, 2010 to 5th May, 2011.

Education

Chittagong University of Engineering & Technology (CUET)
B.SC in Electrical & Electronic Engineering (EEE)

   Mar 2005
— Jan 2010

Course Duration: Four years.
Passing year: 2010
Result: CGPA-2.80 (60%) out of scale 4.0.

Experience

Haripur Power Ltd (Ex-AES), A 360 MW Combined Cycle Power Plant of Pendekar Energy.
IC & E Engineer (Maintenance

   May 2014
— Current

Core Achievement: Gas turbine HGPI'17
Gas turbine Inspection Outage'16.
Plant Outage’15 for Hot gas path inspection.
CPFM (Combustor Pressure Fluctuation Monitor
system up-gradation),Diasys Netmation, MHI.
Overspeed Protection Control Logic Up-gradation
Fuji steam turbine, TPR up-gradation.
Job Responsibility:
1. Perform schedule, Preventive and Corrective maintenance and worked with ISO14001:2004 guidelines and OHSAS18001:2007 specification. Audit documentations and internal auditing for ISO and OHSAS certification.
2. Instrument and control maintenance work of 247 MW MHI Gas Turbine & its auxiliaries, 131.5 MW Fuji Steam turbine & its auxiliaries, 230 KV Switchyard, 16KV, 11KV, 6.9KV Power transformers, HRSG, Condenser, Vacuum pumps, Boiler feed pumps, Fuel gas compressors, Boiler water treatment.
3. Trouble shooting and follow up of DCS ( FUJI, Metso and Mitsubishi) and different types of PLC's.
4. Troubleshooting; Repair and maintain all electrical & instrumentation equipment as required for supporting the plant operation; Assist in control of spare parts inventory; Assist in requisitioning parts and supplies; Maintain a clean and safe plant environment; Assist in budget planning and control; Assist in plant operation as required;
5.Prepare and carryout yearly procurement and budget planning. BOQ, Tender documents, Comparative Statement and quality assurance for procurement of all types of E & I Items.

Super petrochemical (pvt) limited (First petrochemical project in Bangladesh)
Assistant Manager (Electrical and Instrument)

   May 2011
— May 2014

Responsibilities:
In this Petro-chemical Project I was fully involved in all electrical and instrumentation Erection, installation, commissioning and start-up under the consultancy of CHEMEX LLC, USA.
1. Planning and execution of Electrical and instrumentation work.
2. Hot oil Heater, Reformer Heater, Recycle Compressors, Hydrogen and Nitrogen compressors, Hydrogen and nitrogen generator Instrument skid installation, Operation ,maintenance and trouble shooting.
3. Deploying Electrical & Instrument contractor, BOQ, work order preparation for contractor and supervising.
4. Installation, commissioning, and calibration of different types of Instrument, Transmitters and control valves.
5.DCS (Emerson, DeltaV) and PLC’s (Allen-Bradly) commissioning and networking, instrument interlocking , range setting and calibration
6. Plant utility installation and commissioning i.e Reverse osmosis (RO) plant, Boiler, Dearator, Instrument air compressors, cooling tower and Fire Pump.10. Ensure daily, weekly and monthly checks of machine and Maintenance on regular basis. Requisition of spares for Electrical and Instrument prior to out of stock.

amuda Chemical Complex Ltd. (Caustic Chlorine plant)
Shift In-Charge (Electrical and Instrument)

   Jul 2010
— May 2011

Job Responsibility:
1. Installation, maintenance and calibration of Control Valve, ON/OFF valve, Transmitters, temperature & pressure Indicators and Test well, Thermo well, Thermo couple, etc.
2. DCS interlocking (Distributed Control System, Yokogawa, Centum) and instrument error checking.

Ad
Ad
Ad