Civil Engineer


Last Updated: 21st April 2018 (over 4 years ago)

Address
Saudi Arabia

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Degree

Languages
Arabic, English, Hindi, Urdu

Summary

● Executed and monitored various construction activities at the site as per approved drawing and specification.
● Supervised by Mass concreting works of Compressor and Turbine Foundations.
● Supervised concreting for Foundations (building Foundations, Reverse Osmosis, Filter vessels, Cyclone Vessels, Knockout drum, portable Water tank, Raw Water Tank and Pipe racks) grouting for Structural Steel Columns.
● Prepared Method Statement for all Construction activities.
● Submitted the Daily and Weekly Progress Reports to the Planning Department and Management/Client.
● Coordinated with Inter Discipline Teams to avoid any possible delay.
● Utilized and Controlled the Manpower and Material usage and planned accordingly as per the Project Requirements.
● Liaison between Aramco and Sub-Contractors.
● Responsible for mobilization of Men, Machinery, Material and other necessary resources by coordinating with Sub-Contractors.
● Executed the Fire-fighting and Fire-alarm works as per the Aramco standard.
● Erected the Structural Steel Columns and Beams (Bolt-tightening).
● Provided and Maintained a safe working environment on the Site as per Saudi Aramco Safety requirements.
● Closely monitored the progress of works on a day-to-day basis.
● Conducting Daily Site Meetings with Sub-Contractors Site Engineer, Foreman, Supervisor and Block-leaders in accordance with an approved master schedule to resolve Major Site Issues.
● Prepared Two Week Look Ahead Report of Inspections based on Construction Activities.
● Rectified the comments given by Saudi Aramco PID according to the Standards and Project Specifications.
● Coordination with the Consultant to acquire adequate reply for the raised TQs/RFIs and Transmittals.
● Reporting Construction Progress to Construction Manager/Project Management Team.

Education

State Board of Technical Education and Training
Civil Engineering

   Nov 2009
— Dec 2012

Subject: Civil Engineering

Experience

SEPCO - ARAMCO Project
Sr. Civil Engineer

   Dec 2015
— Current

● Executed and monitored various construction activities at the site as per approved drawing and specification.
● Supervised by Mass concreting works of Compressor and Turbine Foundations.
● Supervised concreting for Foundations (building Foundations, Reverse Osmosis, Filter vessels, Cyclone Vessels, Knockout drum, portable Water tank, Raw Water Tank and Pipe racks) grouting for Structural Steel Columns.
● Prepared Method Statement for all Construction activities.
● Submitted the Daily and Weekly Progress Reports to the Planning Department and Management/Client.
● Coordinated with Inter Discipline Teams to avoid any possible delay.
● Utilized and Controlled the Manpower and Material usage and planned accordingly as per the Project Requirements.
● Liaison between Aramco and Sub-Contractors.
● Responsible for mobilization of Men, Machinery, Material and other necessary resources by coordinating with Sub-Contractors.
● Executed the Fire-fighting and Fire-alarm works as per the Aramco standard.
● Erected the Structural Steel Columns and Beams (Bolt-tightening).
● Provided and Maintained a safe working environment on the Site as per Saudi Aramco Safety requirements.
● Closely monitored the progress of works on a day-to-day basis.
● Conducting Daily Site Meetings with Sub-Contractors Site Engineer, Foreman, Supervisor and Block-leaders in accordance with an approved master schedule to resolve Major Site Issues.
● Prepared Two Week Look Ahead Report of Inspections based on Construction Activities.
● Rectified the comments given by Saudi Aramco PID according to the Standards and Project Specifications.
● Coordination with the Consultant to acquire adequate reply for the raised TQs/RFIs and Transmittals.
● Reporting Construction Progress to Construction Manager/Project Management Team.

Drake & Scull International PJSC
Senior Civil Engineer

   Jun 2013
— Dec 2015

● Erected Structural Steel Columns and Beam-7769 MT- (Welding, Coating and Bolt-Tightening).
● Provided and Maintained a safe working environment on the Site as per Saudi Aramco Safety requirements.
● Installed Tensile Fabric Membranes for Canopies (50000 Sq. m).
● Installed Aluminum Cladding (30000 Sq. m).
● Erected and Dismantled Scaffolding as needed basis within schedule.
● Executed and Monitored works being carried out as per Approved Drawings and Specification.
● Managed entire Man-power and Machinery allocation for the installation of Structural Steel, Tensile Fabric membrane and Aluminum Cladding for Canopies.
● Closely monitored the progress of works on a day-to-day basis.
● Maintained Daily Site Report.
● Responsible for mobilization of Men, Machinery, Material and other necessary resources by coordinating with Sub-Contractors.
● Conducted Daily Site Meetings with Sub-Contractors Site engineer, Foreman, Supervisor and block leaders in accordance with the approved master schedule, reviewing and coordinating between block leaders to resolve Daily Site Issues.
● Coordinated with Inter Discipline Teams to avoid any possible delay.
● Supervised Concreting and grouting for Structural Steel Columns.
● Supervised Painting activities of Structural Steel Columns as per Coating Standards of Saudi Aramco.
● Checked the completed activities prior to offering it for Saudi Aramco PID (Project Inspection Department) Inspection.
● Rectified the comments given by Saudi Aramco PID according to the Standards and Project Specifications.
● Closed the Partial Mechanical Completion Certificate (PMCC) items as per the Aramco requirement.
● Handed over the Canopies (50 cells), 3 Car parks to Saudi Aramco.

Noori Constructions
Site Civil Engineer

   Apr 2011
— Mar 2013

● Supervised the Site activities banes on the instruction of Project Manager, Senior Site Engineers.
● Managed and Monitored Major Project Activities and ensured that the Project operate within agreed Contract parameters.
● Maintained standards of Health and Safety at Site.
● Obtained all necessary approvals and permits to execute the works smoothly.
● Participated in regular Site and Project Coordination Meetings to identify problems, target dates, issues, delays in execution of works to ensure timely Project completion.
● Coordinated with the Client for planning further works.
● Handled Major Concrete Pours, with reference to concrete production at plant to the final laying of concrete on Site.
● Handled and directed the workers to get optimum output.
● Executed the works as per the drawings and specifications.

V Raju & Associate Consultants
Structural Detailer

   Apr 2011
— Mar 2013

● Understood the equations, calculations and written instructions from the Designers and Engineers prior starting of Structural Detailing.
● Auto-cad experience preparation of Plans for Structural Foundations and other Construction Projects.
● Prepared and Modify Structural Drawings and Infrastructure Plumbing Drawings as per the Indian standard in Auto-cad software.
● Revised drawings based on instructions from Engineers and Architects.
● Visited Construction Sites to collect data for drawings.
● Consulted with Clients to understand their requirement and instructions to minimize expenses, provide quality of works to meet Client Satisfaction.
● Monitored compliance with building codes throughout the Construction process.
● Reviewed Engineering Data to ensure compliance with the Original Design Plan.
● Met with all deadlines of Clients by working extended hours and weekends.

Search Jobs by Industry

Ad
Ad
Ad