MANAGER TBM‐TUNNEL / SUPERINTENDENT TBM‐TUNNEL


Last Updated: 6th October 2017 (over 5 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Trade Qualification

Languages
English, Hindi, Urdu

Summary

Total Experience- 20 Years
Serving the Construction industry as TBM, Tunneling & Raise Boring Professional with multiple role skill.
Served with best of my capability for EPB TBM, DS TBM, Main Beam TBM, Raise Boring Machines, Cross Passage, Cavern, Conventional, NATM Tunneling and HEM Equipment’s.
Experience based knowledge of Construction related issues covering many aspects of UG Projects from Design & Construction. Work experience includes all type of Tunnels, Caverns, Shafts, Cross passage and hydro electric schemes.
Troubleshooting and problem‐solving skills with inventing and bringing new concepts and ideas of UG construction to save time and cost without harming Project standard.
An accomplished driven professional, willing to complete assignments in the most cost effective and timely manner to the total satisfaction of Clients.

Education

NIMT Polytechnic NCT Gov. of Delhi. India.
Diploma in Mechanical Engineering. (Distance).

   Aug 2005
— Aug 2008

Finished with ''A'' grade.

Experience

LIMAK‐AGE JV
TBM MANAGER

   Aug 2015
— Dec 2016

PERFORMED JOB DETAILS:
 Checking of Method of statement Segment casting works.
 Checking of TBM and Bored Tunnel contract and technical specification.
 Finalization of design for TBM walking adit tunnel and Shield Launching chamber.
 Finalization of design for underground continuous conveyor drive niche excavation.
 Finalization of design, TBM assembling cradle, platform, walking and launching cradle.
 Writing of Method of statement for TBM Assembling, Walking and Launching works.
 Checking of Method of statement for TBM bored tunneling works.
 TBM receiving, assembling and partly testing.
 Completion of TBM walking, shield launching, and initial testing.
 TBM walking has been done by rotating invert segments.
 Start of Initial boring advance for commissioning of TBM.
 Initial 5 meters boring has been done @ DS mode with Invert segment support.
 Installation of Ring support frame and installation of initial rings after 5 meters boring.
 Installation of TBM support equipments and system at the portal.
 Installation of adit conveyor system.
 Completion of assigned scope.
 Bored Tunneling advance will be done by Turkish Crew and management.

PORR‐SBG‐HBK JV. Green Line Underground Metro. Doha Metro Project. State of Qatar
TBM SUPERINTENDENT ‐ SHIFT COORDINATOR

   Jun 2014
— Aug 2015

PERFORMED JOB DETAILS:
 Shift Superintendent for TBM S‐ 844‐845‐846‐847 up to assembling works.
 Shift Superintendent for TBM S‐ 844‐845 TBM and Tunnelling operational works.
 Shift Superintendent for TBM S‐ 844‐845‐846‐847 TBM Tunnel Logistic works.
 TBM Stacking, Assembling, and Operational site setup work.
 TBM Support Equipment’s Installation works.
 TBM Receiving, Assembling, Testing and Commissioning work.
 Installation of Push frame, Eye seal and Ring support frame.
 Installation of Initial Rings and start of the Initial drive.
 Continuous Conveyor Installation works.
 Resigned for better option and responsibility due to crowded Tunnel department.