Mechanical Power Engineer, Mobius Inst. member and Heavy Equipment Maintenance Engineer certified with 12 years of experience in managing, coordination, design, development and checking of different types of manufacturing processes mainly in petrochemicals.
• Proactive self-starter with demonstrated record of personal and technical leadership in highly competitive environments.
• Skilled in Equipment Layout, mechanical piping design, engineering documentation, and design verification.
• Excellent communication, problem solving and management skills in a multi-disciplined environment and excellent record of delivering innovative, collaborative and cost-effective solutions.

Education

Ain Shams University
Power Mechanical Engineer

   Sep 2000
— Sep 2005

Experience

Egyptian Fertilizers Company
Mechanical Maintenance Senior engineer

   Nov 2006
— Current

Bagging plant Mechanical Maintenance Senior Engineer at Egyptian Fertilizers Company (EFC)
Location: Suez, Egypt, First Industrial Zone, Ain Sukhna, Northern West, Suez Bay.
November 2006 – Present
- From September 2012 to Present:
* Job Role: Bagging plant Mech. Maintenance Senior Engineer.
* Description:
- Carry out all Corrective, Preventive & Predictive Maintenance tasks all over the plant including equipment & piping PM schedules, lubrication schedules.
- Technical studies to issue purchase requisitions for the spare parts needed through Maximo.
- Re-organizing spare parts into the warehouse.
- Following up the PO's issued with vendors.
- Maintenance & replacements for Drums of belt conveyors, drum motors, bucket elevators, Reclaimer & gear boxes etc …
- From November 2006 to November 2011:
* Job Role: PM/PdM Engineer
* Description:
Issuance & Following up all PM& PdM activities for Static, Rotating equipment & pipe lines all over the plant including lubrication schedules, Vibration Analysis & Thermo-graph analysis.
- Contribute in the 3rd Turnaround of EFC I (June 2007) (Responsible about maintenance of De-aerator & 3 shell & tube heat exchangers).
- Contribute in the handling Turnaround of EFC II (November 2007) from (Thyssen Krupp UHDE).
- Contribute in the 4th Turnaround of EFC I (October 2010).
1) One of the maintenance team of the Catalyst replacement for the Ammonia Converter.
2) One of the maintenance team of the Waste Heat Boiler replacement.
3) One of the maintenance team of 52 tubes replacement from the Primary Reformer.
4) One of the maintenance team of Vibrating Screens replacement.
- From November 2011 to September 2012:
* Job Role: Work as mandate in the MOC (Management Of Change).
* Description:
Is to document all modifications executed in all plants since 1999 till 2011 including drawing P & ID's and isometrics, Issuance of the mechanical technical studies according to standards.
- Very well experienced in maintenance activities of rotating equipment such as (pumps “Roto-dynamic & Positive displacement pumps”, fans).
- Very well experienced in maintenance activities of all types of heat exchangers (Shell & Tube, & plate coolers).
- Very well experienced in maintenance activities of gear boxes.
* I addition with working as an internal auditor according to ISO-9001.

Inter Tech (Belzonal Solutions Sole Agent in Egypt)
Executive Engineer

   Jan 2006
— Nov 2006

Responsible about all executive operations of the company:
1- Maintenance of the 2 (18 cylinders engine) of Al Nasser travel fast Ship.
2- Maintenance of the iron roller’s bearing housings for (Ezz steel factory) in 10th of Ramadan.
3- Maintenance of the main water cooler of (Oyoun Mousa) Power station.
4- Maintenance of the main water cooler of (Shoubra Elkhema) Power station.
5- Maintenance of the Power generator insulators of (Abu Sultan) Power station.
6- Maintenance of the sand removing pipes in (Al Ismailia dredgers).
7- Maintenance of the petrol tank in (Bapetco.) Gas field in Al Obayedd (Matrouh)
8- Rebuilding the mechanical parts of the 1400 m3/hr pump for (Al Borollus) water station.
9- Rebuilding the mechanical parts of the 1200 m3/hr pump for (10th of Ramadan City) water station.
10- Rebuilding generator shaft of Bani Suweif Power station.
11- Rebuilding the butterfly & body of 600 m3/hr valve for (6th of October City) water station.
12- Protection for the main crusher outlet of (Torah Cement) factory.
13- Rebuilding the main cooler shafts of (Torah Cement) factory.
14- Rebuilding the yeast roller shaft of (Alhawamdeya) sugar factory.
15- Protection for the hot oil tank of the new project of (Gupco) in co-operation with (Petrojet).
16- Rebuilding the shaft of locomotive ship (BMS-5) in Suez port.
17- Rebuilding the hydraulic shaft of locomotive ship (Mared) in Al Ismailia Port.
18- Maintenance of the reciprocating compressor block in (Port Said port).
19- Maintain cracks in the 36” pipe from 10th of Ramadan water Station to Alshorouk City.
20- Maintenance of the 2 main A/C chiller of (Concord El Salam Hotel).
21- Rebuilding the shaft of ID fan in EFS (Ezz Flat Steel).