Mr


Last Updated: 10th October 2018 (over 3 years ago)

Address
Egypt

Category

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Other Post Graduate

Languages
Arabic, English

Summary

DCS PANEL OPERATOR

•Responsible of processing the plant units to ensure production targets and quality
specs are met for all products.
• (Front end (Gas sweetening) – Liquefaction – Compressors – Storage area)
• Dealing with plant utilities :-
(Power generation – Air service compressors – RO unit – Waste water treatment)
• Dealing with different mechanical equipment :-
(Compressors – pumps – chillers – fans – fractionation columns – heaters)
• Respond to plant trouble shooting, and handle trips and emergency situations in a
safe and efficient manner.
• Deal with PFD, PID, flow charts.
• Assist in the developing of operating guidelines and procedures that are followed
during overalls, and normal operation.
• Responsible for safe isolation of plant and equipment for permit requirements.
• Involved in “Shut down Team” which achieved 2 successful annual maintenance
overalls for both trains.
• Ensure plant availability and trying to reduce daily average flaring.
• Propose MOCs for operational improvements and increased plant availability.

Education

Alexandria University
DCS PANEL OPERATOR

   Sep 2004
— Jul 2009

B.Sc. in Chemical Engineering from Alexandria University
Graduation: 2009 – GPA 2.8 / 4.0

MBA: Master of Business Administration in "Project Management " from Arab Academy for Science, Technology & Marine Transport.
Graduation: 2015 – GPA 3.4/

Experience

Egyptian LNG Company
DCS PANEL OPERATOR

   Mar 2010
— Oct 2018

Working for 8 years in the Egyptian Liquefied Natural Gas (ELNG)
Which is Largest LNG Company in Egypt with capacity of 7.2 MTPA using
Conoco Phillips Optimized Cascade Technology.
Job Title: Panel Operator
Responsible of processing the plant units to ensure production targets , quality
and to ensure that all maintenance activities done safely and correct these units
include:
1- Amine sweetening unit which includes [ Metering Skid – Filter Separators –
Absorber – Amine Regeneration – Dehydration and Mercury Removal – Hot Oil
Heater]
2-Liquefaction section: [three optimized cascaded refrigeration cycles
heavies’ removal unit by cryogenic distillation]
3-Turbo-Compressor: [General Electric Frame-5D, Two-shaft gas turbine Mark
VI operating system]
4-Plant utilities: [Gas Turbine Generators – Diesel Generators – Reverse
Osmosis & EDI unit – Air Compressor – Nitrogen Generation – Liquid Nitrogen
Storage Tank –Waste Water Treatment Unit]
6-Auxiliary Emergency Response Team member

Ad
Ad
Ad