Summary

Total about 12 years extensive cross-functional experience and practice acquired while working for Global, International corporations within a wide diversity of Organizational sectors in India, GCC Countries & Democratic Republic of Cango.
Company : Redis Construction Company, Democratic Republic of Cango, Afrika
Position/ Title : HSE Engineer
Date : February, 2017 to February, 2018
Project : MUMI (Mutanda Mining) Project
Owner : Glencore/ MUMI (Africa)
Project Brief: - Steel Structural, Maintenance, Mechanical, HDPE, AS, SS, CS Piping Erections, Pipe Supports Fabrication & Erection, Plate and Shutdown works activates.
-Tank Erection, Painting and Electrical & Instrumentation works for EW6, EW7 (Electro winning 6,7) Copper SX (Solvent Extraction) Plant, Roaster Plant, Booster tank erection.
-Leaching & CCD Plant, Lime Plant, Flotation and Floatation Reagent Plant including Cascade, Ball Mill Erections, Floatation Thickeners, Oxide Re-pulp Plant,
-Overland Conveyor Plant, EW6 & Zinc SX Plant along with Site Instruction Works. CDS (Central Degassing Station), Structural, Platforms & Shelter Erections, Insulation, Fireproofing, Painting Works, Control Building, Gate House, Existing Building Extension Works & System Pre-commissioning and Commissioning activities.
------------------------------o--------------------------------
Company : Siwan Construction Company, Aurangabad, India
Position/ Title : Safety Engineer
Date : June, 2016 to January, 2017
Project : NTPC Project
Client : NTPC (India)
Project Brief: - Priority area roads in plant area and village diversion roads outside plant boundary wall
- Drains in priority area of plant including the trunk drain & all sewerage works in plant area
- Chain link fence at land acquisition line, Boundary wall for plant area & H-type construction offices.
- Construction stores & Paving in steel storage yard with fencing & Erection of Structural Materials.
- Thermal Power Project (4x250 MW) through Domestic Commercial Borrowings and Internal Resources & Capacity of power plant is 3300MW.
------------------------------o--------------------------------
Company : Sai Skill Technology Pvt. Ltd, New Delhi India
Position/ Title : Assessor
Date : December, 2015 to May, 2016
Project : PMKVY(Pradhan Mantri Kaushal Vikas Yojana)
Owner : Trendsetters Skill Assessor Pvt. Ltd/ TS (India)
Project Brief: - Assessment of unemployment peoples and Awareness & execution of applicable safety rules, Safety Equipment, dangerous situations, safety locations in mine and Rescue Plan
- Clear understanding of Dangerous Situations & Safety locations along with execution of Rescue Plan
- Awareness & execution of applicable safety rules, Safety Equipment, dangerous situations, safety locations in mine and Rescue Plan, Understand the DGMS Guidelines on Safety & related compliances
-Understand the utility and importance of Safety Equipment like Shoes, Belt; Tight fit clothing, Safety Belt, Hand gloves, safety goggles, Gas Detector, Safety Lamp, Self-Contained Breathing Apparatus, Gum Boots, Ear Muff, Face Mask, Rehearse Rescue drill periodically, Support rescue operations after the arrival of Mine Manager/ Officer/Operations In-Charge
------------------------------o--------------------------------
Company : Redis Construction Company Democratic Republic of Cango, Afrika
Position/ Title : HSE Practitioner
Date : September, 2014 to August, 2015
Project : K.C.C Project
Owner : Glencore/ K.C.C (Africa)
Project Brief:-SMPP & E&I Structural, Mechanical, Maintenance, Shutdown, HDPE, AS, SS, CS Piping Erections, Pipe Supports Fabrication & Erection, Plate works
-Tank Erection, Painting and Electrical & Instrumentation works for EW2, EW3 (Electro winning 2,3) Copper SX (Solvent Extraction) Plant, Roaster Plant
-Leaching &CCD Plant, Lime Plant, Flotation and Floatation Reagent Plant including Cascade, Ball Mill Erections, Floatation Thickeners, Oxide Re-pulp Plant,
-KOV Crusher, Overland Conveyor Plant, EW4 & Zinc SX Plant along with Site Instruction Works. CDS (Central Degassing Station), RDS (Remote Degassing Station), MOL (Main Oil Lines 58+58 Kms -16”), Production Flow lines (6”), Produced Water & Gas Injection Lines (6”)
-Structural, Platforms & Shelter Erections, Insulation, Fireproofing, Painting Works, Demolition works, Cable Laying – E&I, Telecom Works, Building Related Civil & E&I Works for Substation, Control Building, Gate House, Existing Building Extension Works & System Pre-commissioning.
------------------------------o--------------------------------
Company : Samsung Engineering Company Limited, Jubail, Saudi Arabia
Position/ Tile : Safety Supervisor
Date : April, 2012 to November, 2013
Project : Ma’aden Rolling Mill Project
Owner : Alcoa (Aluminum Company of America) / MA’ADEN (K.S.A)
Project Brief:-Construction of 5 RCC Silos using Slip Form, Roof Erection, MV Substation, LV Substation, Office and Warehouse and Drainage Facilities, Fully integrated Greenfield complex with bauxite mine, Alumina Refinery, Aluminum smelter and can sheet Rolling mill and Erection of Pipes Rack & Pipes Works
-Engineered Wetlands System to Treat Two Million Gallons of Wastewater
-Works including utilities, Landscaping and Hardscaping and Fencing and Gat 2Civil & Building Works of Ma'aden Rolling Mill Project Civil and Building Works related to Ma’aden Rolling Mill Project 3
-Erection of Structural Steel and Cladding works of Rolling Mill and Installations Heavy Machine & Equipment and Construction office buildings and install electrical equipment and Install Over head Crane.
------------------------------o--------------------------------
Company : Petroleum, Chemical & Mining Company, Jubail Industrial City, KSA
Position/ Title : HSE Superintendent
Date : March, 2011 to February, 2012
Project : CTCI- Amines Project, Saudi Kayan Petrochemical Complex
Client : CTCI Saudi Arabia / Saudi Kayan (K.S.A)
Project Brief:-The project were approx. 6.0 Million Man-hours jobs and major scope constitutes of 78,000M3 Excavation, 169,304 M3 Backfilling, 27,453 M3 Concrete, 80,408 M2Form Work, 38,558 M2 Water Proofing, 2,500 Tons Rebar, 26,000 LM Cs Piping ( 202, 847Ø” welding) 14,000 LM FRP piping (85,000Ø” lamination) 700 Ton Pipe supports, Insulation and Painting works, 3,136 Ton Equipment, 5,563 Ton Structural Steel, 1,619 Ea Field Instruments, 285,500 LM Power Cabling, 26,800 LM Instrument Cabling and related conducting and cable tray works.
------------------------------o--------------------------------
Company : Saudi Binladin Group- Petroleum, Chemicals & Mining Division Saudi
Position/ Title : Project In-Charge - HSE
Date : April, 2010 to November, 2010
Project : Saudi Kayan Petrochemical U&O Mega Project, Utilities Island, K-086 Project
Client : FLUOR Arabia Ltd / Saudi Kayan (K.S.A)
Project Brief:-Erection of Piping Spools, Welding Joints between Piping Spools, NDT of Isometric Piping Spools Welding Joins, Post weld Heat Treatment (if applicable) of the Welding Joints
- Hydro test of Fluid Loops, Painting of Fluid Loops, Mechanical Completion & Reinstatement of Fluid Systems & Scaffolding Erection and Dismantling activities.
-Supply, fabricate & install CS, RTR piping for sea water and fire water systems for sizes varying from 1” to 42”& Maintenance Heavy Equipment & Replacement.
-Commissioning Pre Commissioning of Fluid Systems.
------------------------------o--------------------------------
Company : Saudi Binladin Group- Petroleum, Chemicals and Mining Division Saudi
Position/ Title : HSE Supervisor
Date : May, 2009 to April, 2010
Project : Saudi Kayan U&O Mega Project, Cooling Water Island, K-023 Project
Client : FLUOR Arabia Ltd / Saudi Kayan (K.S.A)
Project Brief:-The Scope of Work includes Civil, Mechanical, Electrical, Instrumentation, Maintenance Works, Process Pipelines, Structural works which includes - 26 (20 + 6) Cells and Pre-Commissioning & Commissioning, Scaffolding Erection & dismantling activities.
-Cooling Tower (180m x 35m x 24m) including motors, fans, internals, gearbox and associated electrical & instrument works. Summary of Key quantities: Piping on Sleepers (CS&SS) 140 km (4100 tons), Piping on Rack (CS & SS) 45 km (1200 tons), Configured Piping (CS) 16 km (200 tons), 132”/90” CW U/G piping 2 km (1563 ton), FRP Piping (108” ~ 1”) 10 km, Equipment 500 tons, Structural Steel 2,800 ton, Hot Tap 5 nos., Conduit Works 80 km, Cable Trays 16 km, Cables 250 km, Instrument 8000 nos., Lighting Fixtures 1,500 nos.
-Grounding 125 km, Excavation, 700,000 m³, Backfilling 500,000 m³, Concrete 45,000 m³, Rebar 4,050 tons, Epoxy Grout 200 m³, Non-Shrink Grout 600 m³, HDPE Liner 40,000 m²..
------------------------------o--------------------------------
Company : Saudi Binladin Group- Petroleum, Chemicals and Mining Division Saudi
Position/ Title : HSE Advisor
Date : March, 2009 to May, 2009
Project : T & I Shutdown Project
Client : ARAMCO / Saudi Aramco Riyadh Refinery, Saudi Arabia
Project Brief:-Overhauling of Heat Exchangers, Modification of vessels, removing fin –fan
-Turnaround and inspection of 91 - heat exchangers, 47 - Fin fan coolers, 16 – Columns, 11 – Furnaces, 5 – Reactors 14 - Tanks, 72 – Vessels, 24 – Valves, among other stationary equipment and huge quantity of defects job in Aromatic Unit and Oil & Gas tanks & supporting pipes lines maintenance cleaning and repair.
------------------------------o--------------------------------
Company : Saudi Binladin Group- Petroleum, Chemicals and Mining Division Saudi
Position/Title : HSE Advisor
Date : December, 2008 to March, 2009
Project : T & I Shutdown Project
Client : ARAMCO / Saudi Aramco Yanbu Refinery, Saudi Arabia
Project Brief:-Turnaround and inspection of 68 - heat exchangers, 15 columns, 36 Vessels, 178 Valves, and Various miscellaneous equipment in 1 EG & 1 Utility Plant (10 days S/D). Total Workforce – 374
-Oil & Gas tanks & supporting pipes cleaning modification and repair and handed over being a time
-Scope also includes supply and installation of conduit, trays, cables, motors, panels and modification to existing substation building electrical equipment, installation of various other electrical items.
------------------------------o--------------------------------
Company : Saudi Binladin Group- Petroleum, Chemicals and Mining Division Saudi
Position/ Title : HSE Engineer
Date : November, 2007 to October, 2008
Project : Polyethylene Plant - Sharq 3rd Expansion Project
Client : FOSTER WHEELER / Eastern Petrochemical Company (SHARQ), Saudi
Project Brief:-Construction of Tank, Pipe Rack and Equipment Foundations, Dike Walls, Paving, Oxygen Line (2.4 km), Fire Water Line, Waste Water & Foul Water Pipe Lines (20 km), Cable Trenches, Ducts, Sump & Basins, Fencing and Maintenance of pump & Equipment etc
-Embedded items Steel Structure Erection(44MT), Concrete (97,282M3), Excavation (450,000M3), Dewatering System(18,000LM), Backfilling(380,000M3), Rebar (7,427 MT), Asphalt Road(114,00M2), Cable Trenches(20,000LM), Fire Water main(14,000LM), Precast Cement with Erection(6540Units), Grounding Cable/ Electrical Cables(LM), Sheet Piling(1.2 km)
------------------------------o--------------------------------
Company : Saudi Binladin Group- Petroleum, Chemicals and Mining Division Saudi
Position/ Title : HSE Supervisor
Date : July 2006 to November, 2007
Project : Polyethylene Plant - Sharq 3rd Expansion Project
Client : LINDE (Linarco) / Eastern Petrochemical Company (SHARQ), Saudi
Project Brief: - Construction and development of complete PE plant civil works, consisting of Various Equipment and Structure foundations, Pipe Racks, Buildings, Structures, Waste Water Pits, Cable Trenches, Ducts, FRP U/G Piping (Oily, Contaminated & Fire Fighting), Earth Grounding, etc.
-In the following Key areas: (Vent Recovery (4PE,3PE), Reaction Train (4PE,3PE), Purification, Purge Bin/ Pelletizer, Structure, Waste water pond, N 2 and Chiller Unit, Isopentane Structure, Silos – Granular Resin, Elutriator Blowers, Catalyst Preparation, Silica Storage & Alkyle storage, Liquid Additive Storage & Raw Material, Peletter Bagging and Sea Bulk Loading and Buildings.
------------------------------o--------------------------------
Company : Dodsal Company Ltd, Raigadh, India
Position/ Title : Safety Officer
Date : Aug, 2005 to May, 2006
Project : ECE Project
Client : Nippon Co. Ltd. (India)
Project Brief: - Erection of furnace structural and equipment and Tanks erection, repair & painting.
- Erection pipe rack & installation tank plate & mechanical works and installation of coil machine etc.
- Install cable tray & install electrical supply plant & building.
-Installation of hot & cold coil machine, conveyer and dismantling, rolling plate etc.

Education

Birsa Techanical Institue
Industrial Safety and Fire Management

   Aug 2002
— Jul 2003

Industrial Safety and Fire Management

Experience

Redis Construction Company
HSE Engineer

   Feb 2017
— Feb 2018

Steel Structural, Maintenance, Mechanical, HDPE, AS, SS, CS Piping Erections, Pipe Supports Fabrication & Erection, Plate and Shutdown works activates.
-Tank Erection, Painting and Electrical & Instrumentation works for EW6, EW7 (Electro winning 6,7) Copper SX (Solvent Extraction) Plant, Roaster Plant, Booster tank erection.
-Leaching & CCD Plant, Lime Plant, Flotation and Floatation Reagent Plant including Cascade, Ball Mill Erections, Floatation Thickeners, Oxide Re-pulp Plant,
-Overland Conveyor Plant, EW6 & Zinc SX Plant along with Site Instruction Works. CDS (Central Degassing Station), Structural, Platforms & Shelter Erections, Insulation, Fireproofing, Painting Works, Control Building, Gate House, Existing Building Extension Works & System Pre-commissioning and Commissioning activities.