Mechanical Construction supervisor


Last Updated: 23rd February 2019 (over 3 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Other Post Graduate

Languages
Arabic, English, Hindi, Urdu

Summary

16years of experience in shop and field fabrication, assembly, erection, project material controlling, test pack and punch list,testing and Pre commissioning of Oil & Gas, Power & Petrochemical industries. Worked as, Site In Charge,Piping supervisor for different types of projects, such as Refinery,Gas plant,Flow line of Oil&Gas,Degassing&Dewatering skid of Oil&Gas,Ethylyne plat,Utility plant,Pta plant, Edg plant Gtg plant,Nitrozen plant,Naphta plant,Aromatics plant,Oil&Gas Well Head hook up,Powered Water Injection to Oil Well Head and fccu plants.
Project management & supervisory skills, ability to monitor / manage / control large multi-national workforce.
Experienced in working with multi-national companies in different countries –kuwait ,Abu Dhabi – UAE, , State of Qatar, Saudi Arabia and India.
Effective communication, interpersonal and leadership / influencing skills. Computer Literate, good command over spoken and written English.

Education

EIMSR Delhi
Diploma in Mechanical Engineering

   Jul 2006
— Jul 2009

Experience

Brunel Energy
Mechanical Construction Supervisor

   Jun 2014
— Feb 2018

TA2017 -Major Projects

Sulfolane piping replacement- Like to like piping replacement including pumps suction/discharge, pipe rack and column/exchanger lines. Pipe size 1” to 20”. Scope include fabrication, dismantle existing piping, erection, testing, NDT, painting insulation.

PSV vent modification – Installation of new PSV, vent lines fabrication, NDT, Insulation

Installation of new control valves and related piping- Dismantle existing piping, installation of new piping/CV, NDT, testing , insulation & Tapping of new nozzles for the installation of TI/TE.

Plant –POLYEHTELENE ( PEDB PROJECT )

RESPONSIBILITIES

The scope of project includes improvement in capacity of LLDPE product by increasing conveying capacity from 44 Tons/hour to 50 Tons/hour as part of project. Includes erection of two new Silos with associated equipment and piping. In addition, modification in existing silos, pellet surge hoppers, special supports etc.

The packaging line – A current capacity is 1200 bag/hour and in order to accommodate the new change (increase) in line-2, the packaging line – A has to be increase to at least 1800 bags/hour (Design Capacity to 2000 bags/hour). The warehouse conveyor capacity to increase from 114 units/hr. to 150 units/hr.

To meet higher consumption of ISO-pentane due to new proposed capacity rate increase, the storage capacity of ISO-pentane is to be increased from existing 500 MT to 1000 MT. Includes 35000-Inch dia welding of different size between ¾” to 36” dia, Tie-in, modifying one of the un-utilized existing tank and erection of new equipment like MRU, ISO-pentane Dryer, Cooler, Glycol water storage drum, pumps etc.

ETHYLENE UNIT- TURNAROUND 2014

RESPONSIBILITIES

The development and implementation of the project quality plans for procurement and construction and allocation and control of routine quality functions and resources through the assigned Piping team.
Meeting with department leaders design engineers to proceed jobs,dailly meeting with contractor for progress status,manpower status and material status.
follow plan and piping job at site, site visit with contractor to show the job location at site ,follow scaffold contractor to prepare scaffold for job execution.
Many modification done as per site condition and making as built in isometric drawing, making chart of material and follow NDT contractor for test,
follow insulation contractor and painting contractor to proceed the job as per plan.
Site inspection for the piping job as per design and handed over to process department.