Summary

make the commissioning for the power plant, gas turbine, steam turbine, HRSG, , , , , ,

Education

Faculty OF Engineering
BS.C Mechanical Department

   Sep 1994
— Sep 1998

Experience

Elsewedy PSP
Project Commissioning Manager

   Jan 2015
— Current

ANSALDO GAS TURBINE FRAME AE 94.2
2*165 MW simple cycles.
 Commissioning
 The operation
 Warranty

KHARAFINATIONAL
Senior Commissioning Engineer

   May 2011
— Jan 2015

 Confirm mechanical completion of all installation.
 Manage interface between the different vendors, suppliers, subcontractors
 Support scheduling for optimized construction progress to enable optimized phased handover from construction to commissioning.
 Accept packages from construction (mechanically complete, visual inspection, pressure test and other construction tests are complete) .
 Commissioning, start up and operation for 4X125 MW GE (frame 9E).
 Commissioning, start up and operation for balance of plant (BOP).
 Make the protective maintenance for the gas turbine and it’s auxiliary.
 Make alignment for the vertical pump and horizontal.
 troubleshooting for the gas turbine and getting the spare parts from the manual
 Firefighting installation &commissioning.
 HVAC commissioning
 diesel generator commissioning
 Pump station installation &commissioning.

Middle Delta Electricity Production Company
Mechanical Maintenance Engineer

   May 2010
— May 2011

Turbine Section Inspection For The Gas Turbine Number( 1) 250 MW M701F Includes
i. change the fuel nozzle , combustor basket, transition piece
ii. making NDT test for the nozzle and the bypass elbow, cross fire tube
iii. change the vanes for the stages 1, 2 for (the stationary stages)
iv. change the blade for the stages 1,2 for the(rotating stages)
v. measure the clearance for the blades and also the vanes
vi. make alignment for the transition piece
 Turbine Inspection For The Gas Turbine Number( 2) 250 MW M701F Includes
i. change the fuel nozzle , combustor basket, transition piece
ii. making NDT test for the nozzle and the bypass elbow, cross fire tube
iii. change the vanes for the stages 1, 2 for (the stationary stages)
iv. change the blade for the stages 1,2,3,4 for the(rotating stages)
v. measure the clearance for the blades and also the vanes
make alignment for the transition piece

Middle Delta Electricity Production Company
SHIFT LEADER

   May 2010
— May 2011

OWNER representative mechanical engineer responsible for
 Commissioning, Start up and operation of gas turbine Mitsubishi (2x250 MW) (M701F) and its Related auxiliaries such as:
 Lube oil unit – hydraulic oil unit – purge air compressor GT by pass damper – fuel gas compressor – vibration monitoring system –turbine cooling air cooler (TCA) – hydrogen filling system for cooling generator –hydrogen releasing system by using air after using CO2 – CO2 firefighting system

 FOR NEM HRSG boilers
Perform the chemical cleaning according to procedures for condensate system & feed water system.
 Perform the steam blow-out activities for HP steam, HRH &CRH steam,
LP steam lines.
 follow the installation &alignment & commissioning, Start up and operation of Steam turbine ANSALDO (250 MW) and its related auxiliaries such as;
Lube oil system – hydraulic oil system – jacking oil system – hydrogen filling system for cooling generator – vacuum system – STF condenser –seal oil system.
 Also -commissioning and testing for the following systems:
i. Condensate system, condensate pumps.
ii. Feed water system (LP, HP/IP) & FWP’s.
iii. Circulating water system & CW pumps.
iv. Sump pumps.
v. Firefighting installation and commissioning.
 HVAC commissioning
 diesel generator commissioning
 pump station installation and commissioning
 Perform the sequence test for the following systems:
i. Condensate system, condensate pumps.
ii. Feed water system (LP, HP/IP) & FWP’s.
iii. Circulating water system & CW pumps.
iv. Service water system.
v. Closed cooling system.
vi. Instrument and service air system.
vii. Potable water system.
viii. Cooling water intake equipment (sluice gate, traveling screen).
 Record the commissioning data for all systems mentioned previously.
 Report and advice the daily activities for all systems mentioned previously.
 Also working as owner operation engineer responsible for:
i. conducting all preparation steps of units in field to realize permissive for startup from control room such as (filling line of water free of bubbles, all safety valves ready, coolers in service, all skids of hydraulic and pneumatic ready, firefighting ready, all electrical power source ready position of motorized valves in auto mode and ready to work locally, all manuals valves before and after control and motorized valves shall be open, etc.
ii. Responsible of startup, operation, remarking alarms of units from control room and solve operation problems.
iii. Survey in field for more check and confirmation of safe operation of units

Middle Delta Electricity Production Company
OPERATOR ENGINEER

   May 2000
— May 2009

 unit start up and shutdown procedures
 monitoring parameters
 testing the equipment's
 isolation and de-isolation procedures
 safety work permit system
the above mentioned is done for
 8GE gas turbine 25 MW each (MS5001frame P) and its related auxiliaries
 8 NEM HRSG
 (2X58) GE steam turbine and its related auxiliaries
And also done for ;
 Condensate system & condensate pumps.
 Circulating water system & circulation pumps.
 Feed water system & pumps.
 Sump pumps.
I also watch the following maintenance sections for steam turbine GE( 58 MW )
Make major inspection
 Pumps maintenance and balancing.
 the starting mean inspection (the diesel assembly and disassembly) of the gas turbine
 Overall maintenance for condensate pumps (10 stages), vertical pumps

 Maintenance for travel screen and main cooling pumps, hydraulic power unite, air compressors and steam turbine auxiliaries such as ejectors, lubrication system and condenser