Summary

I am an Operations, Commercial, Compliance and Performance specialist of Power and Desalination plant; I have 24 years of experience behind me in which more than 14 years in UAE. My objective is to achieve a responsible career position where my education and experience can be utilized while contributing to the success of the company

Education

NEBSM
NEBS Management certificate course

   Mar 2000
— Mar 2001

NED University of Engineering and Technology Karachi Pakistan
Bachelor of Technology in Electrical Engineering

   Jan 1996
— Jan 2000

KANUUP
Post Diploma in Nuclear Engineering

   Jan 1990
— Jan 1991

GSEZIT Karachi Pakistan
Diploma of Associate Engineer in Electrical Technology

   Jan 1987
— Jan 1990

Experience

Total Tractebel Emirates OM
Risk and Compliance Manager

   Mar 2017
— Current

External and internal Compliance Monitoring of the organization.
Business Continuity Management Coordinator

Total Tractebel Emirates OM
Commercial and Performance Manager

   Aug 2013
— Mar 2017

Taweelah A1
Commercial and Performance Manager at a 1590MW CCGT, 84 MIGD Desalination Plant. Additionally performing the functions of Technical Support Engineer
The Plant consists of 10 GE gas turbine generator sets each capacity of 107MW at reference site conditions, the gas turbines are connected with dual pressure HRSG. The power plant section also includes three back pressure steam turbine generator sets.
Desalination facility consists of four MSF units and 14 MEDs

Shuweihat Power and Desalination, Abu Dhabi UAE
Commercial and Performance Engineer

   Jun 2007
— Jul 2013

Worked as Commercial and Performance Engineer at a 1500MW CCGT, 100 MIGD Desalination Plant. Additionally performing the functions of Technical Support Engineer
The Plant consists of five Siemens gas turbine generator sets each capacity of 222MW at reference site conditions, the gas turbines are connected with dual pressure HRSG supplied by nooter eriksen. The power plant section also includes two back pressure steam turbine generator sets from Siemens.
Desalination facility consists of six MSF units each capacity of 16.6 MIGD

Shuweihat Power and Desalination, Abu Dhabi UAE
Shift Team Leader

   Mar 2003
— Jun 2007

Worked as Shift Team Leader; Safe, effective and efficient operation of 1500MW CCGT, 100 MIGD Capacity Desalination units.
The Plant consists of five Siemens gas turbine generator sets each capacity of 222MW at reference site conditions, the gas turbines are connected with dual pressure HRSG supplied by nooter eriksen. The power plant section also includes two back pressure steam turbine generator sets from Siemens.
Desalination facility consists of six MSF units each capacity of 16.6 MIGD