Senior Electrical Engineer/Technical Expert


Last Updated: 30th August 2018 (over 4 years ago)

Address
United Kingdom

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
65+

Qualification Level
HNC/HND/City & Guilds

Summary

Senior Principal Electrical Engineer, Engineering Manager/Technical Expert on ANSI, NEMA, API, NEC, IEC, standards. Hazardous Area Classification, EMC Management, Power System Studies (ETAP), Arc Flash Management, Shell DEPs, ARAMCO,NORSOK and other International Oil Company standards and Lloyds Register Marine Classification Documents. Projects include Refineries, LNG Floating and Onshore Export and Import Terminals, Offshore Platforms and Oil and Gas projects in the Middle East, Norway, SE Asia, China and Australia

Education

IEEE
LIFE SENIOR MEMNER

   Aug 2015
— Aug 2015

state of California
PROFESSIONAL ELECTRICAL ENGINEER

   Aug 1987
— Aug 2015

Experience

SUBSTATIONS (PH) LTD
TECHNICAL DIRECTOR

   Jan 2017
— Current

01/17 to present. SUBSTATIONS (PH) LTD Reading UK. Technical Director.
Design, Purchase and Installation of Substation Retrofit Automation Solutions for 132/66/33/11 kV Industrial Substations.

Turnkey Retrofit packages for 132kV33kV, (GIS) substations, Emergency diesel generators, 6.6kV /400v Switchgear, AC and DC UPS, ENMCS system, P F Correction equipment, ENMCS, LOAD SHEDDING, ESD, DCS Integration.
Design and construction is to ANSI and IEC standards

09/16 to 01/17. SOFREGAZ Paris. Electrical Specialist. Kuwait Al Zour LNG Import Project FEED endorsement for HEC (Korea)/ Kuwait NPC.
Work is preparation of Electrical Specifications for 132kV33kV, (GIS) substations, Emergency diesel generators, 6.6kV /400v Switchgear, AC and DC UPS, ENMCS system, P F Correction equipment, EMC and
Earthing studies to IEE 80. Powers System studies loadflow, short circuit, voltage drop, motor starting and re-acceleration using ETAP software.
Design and construction is to KNPC, Shell DEP and IEC standards.

Woodgroup Woking UK
SENIOR PRINCIPAL ELECTRICAL ENGINEER

   Jan 2014
— Current

09/14 to 6/15. Mustang Engineering, Woking. Senior Principal Electrical Engineer. Ivar Aasen Field Development Project offshore platform design
for SMOE (Singapore)/ Det Norkse Norway.
Work is as Package Engineer on Siemens Electrical Packages for 110kV,11kV, (GIS) substations, IS limiter, Emergency and Essential diesel generators, 11kV, .69kV,400v Primary and secondary distribution networks including all associated equipment and cabling, Low voltage distribution network, AC Uninterruptible Power Supply (UPS) systems and distribution networks. Substation Control Monitoring System (PDCS), HV and LV AC motors, AC electrical variable speed drive systems .Interface with the Instruments DSS/PCS.
Design and construction is to NORSOK and IEC standards.

09/13 to 3/14. Foster Wheeler. PMC Senior Electrical Engineer ADCO Bab Integrated Facilities FEED Project Office, Petrofac FEED Contractor Woking.
FEED project for new Bab Central Desalting Plant, 2 trains, modifications to existing BCDS plant,1 new Remote Degassing Station, 4 new Water Injection Clusters and 4 new Well Pads for Bab Field, Abu Dhabi.
Work is to review and approve all FEED electrical deliverables for 220kV,33kV, 11kV, 3.3Kv new substations, Emergency diesel generators,220kV, 33kV. 11kV, 3.3kV,415v Primary and secondary distribution networks including all associated equipment and cabling, Low voltage distribution network, AC and DC Uninterruptible Power Supply (UPS) systems and distribution networks. Substation Control Monitoring System (SCMS), HV and LV AC motors, AC electrical variable speed drive systems. Solar Power Panels, Interface with the Instruments IPCS.
Design and construction is to ADCO, Shell DEPs and IEC standards.

3/10 to 6/13. Technip, Onshore/Offshore. Paris, France.
Senior Electrical Engineer on PRELUDE FEED/EPCI for Royal Dutch Shell Australia for a 3.5 million tonnes/year floating LNG facility. Electrical work includes: Main steam turbine generators and step-up transformers, their associated control and protection systems and cabling/power connections, Three Essential diesel generators including all associated equipment and cabling, Two Emergency diesel generator including all associated equipment and cabling, 33Kv. 11Kv, 690V,400v Primary and secondary distribution networks including all associated equipment and cabling, Low voltage distribution network including all associated equipment and cabling,AC and DC Uninterruptible Power Supply (UPS) systems and distribution networks including all associated cabling, Electrical Network Management and control system (ENMCS),HV and LV AC motors, AC electrical variable speed drive systems.
Design and construction is to Shell DEP standards, IEC 60092, Lloyds Rules and Regulation for the Classification of Ships and Australian codes.

4/09 to12/09. Tractobel/Electrobel, Flevo Power Plant, Lelystad, Netherlands.
Owner’s Lead Electrical Engineer.
Lead on-site electrical engineer for the owner during the construction and commissioning of Flevo (2 X 416 MW/520 MVA) KA26-1 Combined Cycle Power Plant and associated 380kV and 150 kV Substations connections to the grid, being engineered, furnished, installed and commissioned by Alstom under a lump sum contract. Each separate unit consists of a 262 MW Gas Turbine coupled to a single shaft with a 130 MW Steam turbine receiving steam from a HRSG driving a 520 MVA Generator producing 435 MW at 21Kv.

3/08 to 2/09 Technip, Paris, France.
Lead Electrical Engineer on a pre-FEED study for Pluto-2, 4.2 Mtpa LNG Liquefaction Plant for Woodside Energy, Perth, Australia.
The work includes the expansion of Pluto-1 facility to add a second train. New process facilities include GT/LP/MR compressor with 20MW VFD helper motor, BOG compressor 5.2 MW, methane product compressor, GT/PR compressor with 20MW VFD helper motor, End Flash compressor 20.5 MW VFD. New Electrical facilities included four Frame 6, 30MW/50MVA CTGs with 11/33Kv step up transformers, one 33kV GIS substation, four 33/6.6Kv 20 MVA transformers, ABB Power Management System to IEC-60870-5, four 6.6 kV/ 400v substations and associated cable tray, 33 Kv, 6/10kv and .6/1kv cable installation, 3 2.5 MW emergency power Diesel Generator Plant, DC and AC UPS, Lighting, grounding and lightning protection.
Design and construction is to Shell DEP and WEL standards, IEC and Australian codes.
Other studies completed for new Browse Gas Field.
Browse to Burrup One 4.9 Mtpa LNG train plus 6.1 Mtpa Gas backfill
Browse to Kimberley Two 7.1 Mtpa LNG trains grass roots facility.
Electrical facilities included 4 x 185 MW Combined Cycle power plants and 132 kV and 33kV Gas Insulated Substations.
The work included CAPEX estimates for the facilities
.
8/07 to 2/08. CBI Europe BV. Fujian LNG Terminal, Putian, China.
Lead Electrical Engineer EPC, on final design through energizing for LNG receiving terminal for CNOOC Fujian LNG Co Ltd. Design contractor is Chenda Engineering Company and the Construction contractor China Petroleum First Construction Company (CPFCC)
The work includes the design, construction and commissioning of two 160,000 cubic meter LNG full containment storage tanks, Jetty, offshore flare, Seawater intake structure, Seawater pumps Seawater treatment package, Boil-off gas compressors, Recondenser, HP Openrack vaporizers, LNG Intank-pumps and HP Send-out pumps, Truck loading facility, Nitrogen, Plant and Instrument air packages. Electrical facilities included one 110Kv GIS substation, two 110/6.6Kv 25 MVA transformers, Siemens Power Management System to IEC-60870-5, two 6.3 Kv/ 380v substations and associated cable tray, 110 Kv, 6/10kv and .6/1kv cable installation, essential power Diesel Generator, DC and AC UPS, Lighting, grounding and lightning protection.
Design and construction is to IEC and Chinese GB codes.

9/06 to 4/07. Stone and Webster Ltd. Kuala Lumpur, Malaysia.
Lead Electrical Engineer PMC DUNG Quat Refinery Project Vietnam.
EPC is Technip/JGC/TR Sa designed in Kuala Lumpur, Japan, Paris and Madrid.
Project management based in Kuala Lumpur.
New 125,000 bbd, grass roots refinery, first in Vietnam. Process units Include CDU, NHT, CCR, KTU, RFCC, LPG treater unit, RFCC NTU, SWS. SRU,CNU,SRU, ISOM, LCO HFT. Offsites include crude oil storage, refinery tankage, loading and receiving jetty, seawater intake, flare and firewater. Utilities include steam with 4 x 27 MW Steam Turbines, 6.6Kv Emergency Diesel Generator, Nitrogen, CW, air and caustic plants.

2/06 to 9/06 Snamprogetti/ AGIP KCO. Budapest, Hungary.
Senior Electrical Engineer. KASHAGAN ONSHORE/OFFSHORE. Kazakakstan.
Part of ECMT team working for client on the onshore oil and gas project in contractors, MSS/HARKEN, office in Budapest Hungary.. Review and approve electrical detailed design. Design is to KDOC standards, IEC 60287, IEC 60079 and other IEC and Kazakakstan standards.

7/05 to 11/05 JACOBS Engineering Ltd. Reading, UK.
Senior Electrical Engineer. Worked on a Project Proposal for ARAMCO Safaniya Offshore Expansion of Gosp-4 to maintain to 1300 and 750 MBCD at Safaniiya and Zuluf Offshore Fields. New facilities included, 3 phase LPPT, 230kv GIS Substation expansion, PIB building, Booster and injection pumps.

8/85 to 3/05 PARSONS CORP. Pasadena USA. Lead Electrical Engineer.

Petrochemical Projects:

• Caltex Batangas refinery debottlenecking project in Manila, Philippines for revamp of FCCU and Gas Recovery Plant, Crude Unit, Platformer, Naphtha Hydrotreater, Diesel Desulfizing Unit, LSR Merox Unit, new Sulfur Recovery Plant, and 8 MW Diesel Electrical Generation Plant.
• Shell Refinery, Richmond, CA, Clean Fuels projects, 115kv Substation upgrade.
• Exxon, Benica, CA. Clean Fuels projects.
• BP Alaska, GH-2 Gas compression Modules.
Oil and Gas projects:

• ARAMCO Shaybah Development Project, a grassroots multi project $2.0 billion program to develop 500 MBCD oil production facilities at Shaybah Saudi Arabia. Facilities included three gas oil separation plants, 300MW power plant (GEFR7) an airport, industrial complex, a 600 kM, 46 inch pipeline to ABQAIQ and additional stabilization facilities at ABQAIQ plant.
ARAMCO Hawiyah $1 billion Program. Detailed design construction management.GOSP 2 & 3 upgrades, and new grass roots Hawiyah GOSP 4. Water Injection Plant and upgrades to Salt Water treatment Facility.

OTHER EXPERIENCE

Available on request. Power, LNG and Petrochemical Projects.

Ad