HSE Engineer


Last Updated: 10th April 2018 (over 4 years ago)

Address
United Arab Emirates

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
Afrikaan, English

Summary

An ISO Certified HSE Engineer offering over 11 years’ experience spanning Power, Oil and Gas, Civil Construction and Transportation Industry. Skilled in Waste Management, HSE Policy and Procedure, Hazard Prevention and Control, HSE Audit and Risk Assessment, Project Management, Standardization and Quality Control, Occupational Health Safety Management System (OHSMS), Regulatory Compliance (DCCA) and Integrated Management System ( ISO 14001 and OHSAS 18001. Keen on continuous career Progression.

Education

Newcastle University
Fire & safety Engineering

   Mar 2010
— Feb 2014

Fire and safety engineering and loss prevention and general work place safety management.

Newcastle University
Safety Engineering

   Jan 2009
— Dec 2009

General safety management of work area and the environment.

Experience

Green Modeling Contracting LLC
Safety Engineer

   May 2017
— Current

Project Handled
• Nero Spinal Surgical Hospital (G+3)
• AZIZI Victoria Phase 01-P105, Four Buildings (B+G+10)

Key Achievements
• Awarded safety engineer of the month
• Achieved 10 million safe man hours without LIT/LTA

Key Duties
• Ensure company’s Occupational Health and Safety Management System, Policy and Procedure are implemented.
• Attend to all Dubai Municipality (DM)/Dubai Creative Cluster Authority (DCCA) Requirements.
• Preparation of site and office Emergency Evacuation response plans; drawings and implementation
of procedure for emerging items such as Emergency Evacuation Risk assessment (EERA), Emergency Evacuation Safety Analysis (EESA), Computing Fluid Dynamics (CFD) for Fire and Explosion
• Monitor Safety equipment inventory and ordering of HSE deliverables as required
• Mediate between the project management team, the workforce and foremen to resolve any arising safety or facility challenges that pose a threat to optimal project completion time.
• Maintain Integrated Management System (ISO 14001 and OHSAS 18001).
• Preparation of Environmental Aspects and Impacts register as related to UAE federal law and International Environmental Law
• Development and Revision of Procedures and HSE Plans and Policies
• Registering of “Objectives and Targets” and Management Programs
• Maintaining/review of applicable legislation register
• Evaluation of local and International legal compliance
• Ensure all site personnel are well trained for hazards identification and reporting
• Preparation and issue of relevant weekly, monthly, quarterly and annual reports
• Accident/Incident Investigation analysis report

Al Hassan Engineering Company Abu Dhabi UAE
HSE Engineer

   Sep 2014
— May 2017

Projects Handled
• GASCO, Abu Dhabi UAE
o Gas Treatment and H2s Removal (ICAD, Abu Dhabi UAE)
o Black Powder Management- New Separation & Filtration-EPC Work (Abu Dhabi Ruwais)
• ADMA OPCO, (Abu Dhabi UAE)
o Satah Al Razboot (Sarb) and Zirku Island Oil Field Development Project-EPC Work (Offshore)
Key Duties
• Reviewed contractor’s HSE documents, submittals, etc. to verify the suitability, adequacy and conformance to company and project requirements.
• Ensured federal and local regulations were implemented with the objective of meeting all reasonable and practicable standard to protect the safety and health of workers, staff and visitors at site.
• Conducted Inspections, relevant meetings, HSE management system audits and closely monitored the site activities daily and issuance of non-compliance reports when required.
• Measured the HSE performance of contractor, also advised on any actions necessary for improvement.
• Conducted relevant in-house safety awareness training to PMC, site Management team on various subjects and safety inspection procedures related to the project.
• Coordinated weekly and Monthly meetings and presentation of updated HSE status on site based issues

Alstom Middle East FZ, Dubai UAE
HSE Engineer

   Jun 2012
— Jul 2014

Projects Handled
• Sohar Power Plant, IRAQ Government- Basra/Najaf
o Rehabilitation of Basra Power Station/Substation, Iraq.
o Rehabilitation of Najaf Power Station, Iraq.
o Shut Dawn of Sohar Aluminum Smelter Power Plant, Oman.
• Takerre/Gasco Abu Dhabi, Fujairah Power Authority
o Shut Dawn of Takreer Power Plant, Ruwais Abu Dhabi.
o Shut Dawn of Habshan and Bab Power Plant, Gasco Abu Dhabi.
o Shut Dawn of Fujairah Power Station, UAE
Key Duties
• Ensured company’s Occupational Health and Safety Management System, Policy and Procedure were implemented.
• Preparation of site and officeEmergency Evacuation response plans, drawings and implementation
of procedure for emerging items such as Emergency Evacuation Risk assessment (EERA), Emergency Evacuation Safety Analysis (EESA), Computing Fluid Dynamics (CFD) forFire and Explosion
• Monitored Safety equipment inventory and ordering of HSE deliverables as required
• Mediated between the project managementteam, the workforce and foremen to resolve any arising safety or facility challenges that posed threat to optimal project completion time.
• Maintained Integrated Management System (ISO 9001, ISO 14001 and OHSAS 18001).
• Ensured operations at sites followed the company policies and procedures
• Reviewed Procedures, Plans and Policies
• Ensured that during all phases of operation, attention is paid to safe systems of work by carrying out regular inspections in all operational areas, re-inspect all the lock-out/tag-out prior to starting any activities in the GT/Gas Turbine,ST/Steam Turbine(Gas Lines/Rotor and DB)

Search Jobs by Industry

Ad
Ad
Ad