Land Surveyor


Last Updated: 14th November 2017 (over 5 years ago)

Address
Bangladesh

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Other Post Graduate

Languages
Arabic, English, Hindi

Summary

I am looking for opportunities to advance my career as a Land Surveyor. I am a highly skilled, motivated, hardworking and loyal person looking to establish myself in the survey engineering field. I have been involved with surveying since a young age and have a passion for surveying field. I am a proud graduate of Bangladesh Survey Institute and have the experience and knowledge to survey instrument and software.
• Extensive knowledge of land surveying methods and measurement practices.
• Solid understanding of geometry engineering and trigonometry.
• Strong familiarity with RTK GNSS,Level & Total Station & surveying software.
• Impressive analytical and conceptual abilities.
• Excellent internal and external communications skills.
• Auto Cad 2D, LISCAD Engineering Software, Leica Geo Office, Auto CAD Civil 3D.

Education

Bangladesh Survey Institute, Rammala, Comilla.
Diploma in Engineering Surveying

   Oct 2009
— Nov 2013

Experience

Survey Technologies Bangladesh Ltd
Senior Land Surveyor

   Aug 2017
— Current

A. Provided technical support to any other surveyors involved with each project.
B. Prepared survey drawings and descriptions as directed.
C. Provided survey and mapping services to meet client requirements.
D. Performed detailed field surveys and oversaw the activities of field survey crews in performing the survey.
E. Maintained accurate notes, records and sketches to describe and certify work performed.
F. Researched previous survey evidence, maps, physical evidence and other records. G. Attended project meetings, providing input, evaluating and managing the required field survey work.

Qatar Engineering and Technical Company, Doha, Qatar
Senior Land Surveyor

   Aug 2016
— Jul 2017

A. Fixing bench marks & Traversing for project.
B. Traverse Adjustment.
C. Ensured that all required survey information was collected per project requirements.
D. Worked with surveying staff architects and mapping staff to ensure consistency. E. Maintained an updated database of project-related geographical information.
F. Calculated height depth width distance and other key factors.
G. Resulted any issues with surveying results in a timely manner.
H. Clearly determine boundaries for each surveying assignment.
I. Infrastructure Survey.
J. Topographical Surveys, As Built Survey, Detailed Survey etc.
K. Data Processing from Total Station, RTK GNSS to Auto Cad.
L. Contouring & Contour map.
M. Established Control Point by RTK GNSS (Static Method).
N. Confirmed that surveying techniques conformed to quality control procedures. O. Provided technical support to any other surveyors involved with each project.
P. Prepared surveying reports for architects and project engineers.
Q. Auto Cad 2D, Leica Geo Office, Auto CAD Civil 3D.

Land Surveyor
Qatar Engineering and Technical Company, Doha, Qatar

   Jun 2015
— Jul 2016

A. Cadastral Survey (Demarcation, Re- Demarcation, Subdivision, Consolidation, Strata).
B. Data Processing from Total Station, RTK GNSS to Auto Cad.
C. Fixing bench marks & Traversing for project.
D. Traverse Adjustment.
E. Topographical Surveys, As Built Survey, Detailed Survey etc.
F. Levelling.
G. Contouring & Contour map.
H. Anchor bolt lay-out.
I. Volume Calculation.
J. Create X-Section & Longitudinal profile
K. Established Control Point by RTK GNSS (Static Method).
L. Auto Cad 2D, Leica Geo Office, Auto CAD Civil 3D.

Celestial Tech Limited, Bangladesh
Surveyor

   Mar 2014
— Current

A. Topographical Surveys, Cadastral Survey, Levelling, RTK GNSS Survey, Layout etc.
B. Ensured that all required survey information was collected per project requirements.
C. Worked with surveying staff architects and mapping staff to ensure consistency.
D. Calculated height depth width distance and other key factors

Search Jobs by Industry

Ad
Ad
Ad