Summary

I have 15plus years of experience in MEP field as Project Manager, Project Engineer, Mechanical Manager and MEP Consulting Manager. As well as experience in various countries, varying from some to extensive - Lithuania, Latvia, Belarus, Georgia (Sakartvelo), Great Britain and USA. (GB and USA as student, not as Engineer). Experienced in EPC contracts for New and Reconstruction. Modern, Technical and Heritage Buildings. Experienced in Energy and Resources Preservation technics and Projects. Internationally Trained in Technical Fields (AHU, Chillers) and Management. Able and willing to travel.
Working on:
HVAC Equipment failures & fixes
Energy savings and preservation
Design PEER reviews
Technical Specifications reviews and preparations
Detailed MEP BoQ's reviews and preparations
Project Management
Renewables
Site & Facilities Inspections
MEP Commissioning
MEP value Engineering

Education

Kaunas University of Technology
Bachelour Degree in Electrical Engineering

   Sep 1996
— Jun 2002

Experience

Barona
Asembly line worker

   Aug 2019
— Current

At Wamet automotive asembly line worker (MB A and GLC). Self employement didnt go well.

www.skillancer.eu
Engineer

   Jan 2019
— Current

Energy preservation, Building MEP inspections and fixes.
Working on:
HVAC Equipment failures & fixes
Energy savings and preservation
Design PEER reviews
Technical Specifications reviews and preparations
Detailed MEP BoQ's reviews and preparations
Project Management
Renewables
Site & Facilities Inspections
MEP Commissioning
MEP value Engineering

AECOM
Sr. Engineer

   Sep 2016
— Nov 2018

Responsible for Design meetings , MEP design overview, MEP value Engineering and Budgeting, Site installations and Inspections.
For Radisson Hotel Resort Tsinandali (25000m2 - 4 buildings, out of which 3 national heritage) Design and Installation, outdoor networks redesign (from pressurized to gravity driven) supervision and installation supervision, green façade (20000m2) tender design documentation preparation for MEP part, installation supervision and commissioning supervision. Classical Music Concert Event MEP design preparation, tender preparation, contractors selection, contractors supervision and commissioning.
Pools design overview, and 7000m2 landscaping preparation, on site, coordination as civil contractor failed to read drawings, coordination of trees planting (something new for me).
General tender MEP contractors proposals reviews.
Le Meridian Batumi Mock up preparation and quality control,
Hyatt MEP value Engineering and Budgeting,
Sheraton Methekhi Mechanical II Engineer.
Country wide travel to various sites.
Private installation of Infinity Pool.
As Sr. Project Manager, due to health condition, had to leave to Britain, I was backing Up Project for 6 months.
Languages used in office - English, on Site Russian and Georgian travelling - Georgian.
Dealing with local installation contractors in tenders, on site etc.
Contract was extended for couple times until expired.
Immediate, secondary use of FCU condensate usage implemented for 3rd and 4th time. (Radisson and Le Meridian Mock ups)

Roneli Georgia
Mechanical Manager

   Jan 2015
— Jul 2016

Responsible for Millennium Hotel mechanical Installation in Tbilisi, Georgia. 33 floors, 200 rooms, 7stars, 50'000m2 area. Responsible for Dunham Bush HVAC inspection in China Factory. Workshop design Repair and Preparation as Main Designer failed to produce drawings on time and at quality. Personnel training to work with equipment (Ventilation units assembly, use of pipe threaders for sprinkler installation, drawings readability training on selected local foreman's.
Rixos Tbilisi Mock up Rooms Preparation and Design Presentation to Contractor via internet and Grand Local Meetings, Kick offs.
Darialli Hydro Power Plant 5TW power, ventilation assembly support as crew failed to work with non local design drawings and construction technics.
Tbilisi Mall roof HVAC installation equipment inspection on failing equipment.
Language used to communicate with customer - English, language used to communicate with crew, and subcontractors - Russian, language used to communicate with Designers- google translate Czech. Contract was extended for couple times until expired.
Immediate, secondary use of FCU condensate implemented for 2nd time.

Energokomplektas
Technical Director

   Jan 2014
— Jan 2015

Various residential multidveling projects in Vilnius. Left because I've received invitation to Project in South. Small but stubborn company.

Jegos linija
MEP Project Manager

   Aug 2011
— Jul 2013

MEP Project Manager for contract on Comfort inn (7500m2, underground parking, 200 rooms, 3 meeting rooms, 6 floors) Hotel in Vilnius. As company was and is Electrical Engineering mostly, they needed someone with Mechanical Experience. Was responsible for 20-40 electricians on site, 2 HVAC and 1 automation subcontractors, preparation of workshop drawings (electrical and mechanical), tendering equipment, budgeting, dealing with technical supervisions and authorities. Project past its timeline, however budget and quality milestones achieved.
On this project I've learned, how it is possible to survey materials quantities, to an abnormal detail. Immediate, secondary use of FCU condensate implemented for first time (Choice hotel).
As project finished I was relocated to another electrical Project on CCSD office building (12000m2 8 floors), Kaunas, for site manager support on Commissioning, Backup Power and Data Center. www.jegoslinija.lt

Ygle
MEP Design Department Manager

   Jul 2011
— Jun 2019

Company consisted of 3 departments - Construction, Service and Design. After restructuring only Service department left. Department was working on various projects in Belarus, Lithuania, Kazakhstan and Germany. Total 11 designers at peak.

YIT Technika
Project Manager

   Jun 2010
— Jun 2019

During this period transitioned from Project Engineer to Project Manager in Construction, later in Design, again later in Maintenance. As well from Automation discipline shifted to Mechanical. And again from Mechanical to Management. As automation engineer on “Akropolis” (60000m2) shopping and entertainment center in 2005-2006, worked on Aqua Park Druskininkai (16000m2 with sauna complex, pools indoors and outdoors, offices, heritage buildings), responsible for Complete Mechanical and Automation of park, after commissioning had to train park maintenance personnel, Lithuania, Babilon Cinema theatres ( implemented NC 27 sound level AHU and distribution system developed by my crew, cost wise and technically very advanced and simplified) , Panevezys; various shopping centers and Vilniaus Baldai (Ikea Furniture Factory) as Facilities Manager (50000m2 two sites of facilities, 6MW of wood waste burning boilers (2 steam+3 hot water, 5 MV substations, 40 years old facilities; implemented preventative maintenance procedures for electrical, heating and ventilation systems, as systems were failing unexpectedly, preventive tests and maintenance allowed to minimize production line disruptions and flooding of furniture, due o age of boilers had to deal with environmental agency, because of pollution (cyclone filtering systems repaired). 12 crew members and at end of my work period there, and 3 almost permanant subcontractors.
Capitol offices (25000m2, 20 floors) Preliminary & Workshop Design MEP Manager