QA/QC, Mechanical, Piping, Welding, NDT, Inspection
Last Updated: 13th September 2019 (over 3 years ago)
Summary
Education
CSWIP 3.1 Welding Inspector. (Cert No.336615). TWI.UK
Jun 2018
— Jul 2018
Diploma Mechanical Engineer
Aug 2000
— May 2003
Experience
QA/QC Mechanical Engineer
Apr 2019
Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
Issuance of non-conformance reports (NCR) and action for timely closing
Preparing Test Package for Hydro and Pneumatic test
Coordination with construction Team for Piping, Valve re Instatement Inspection activities
Line check before commissioning activities and assist in Punch list preparation
Prepare Inspection Report and Documentation to Close the RFI
Piping Spool Released Document Preparation and Offering to Client Inspection team
Witness and Review of Various NDT, PWHT & HT Reports
Coordination with the NDT/ PWHT crew
Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
Checked valve orientation on high pressure steam and other critical lines before erection / fit up
Verification of field rectification report issued by construction (IFC)
Line check before commissioning activities and assist in test pack preparation
Erection and Installation Inspection of Piping and Fittings as per Approved isometric drawing & PID
Inspection of Punch listing Prior to MC, RFC & RFSU
Coordinate to Client & third party Inspection team
Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
QA/QC Mechanical / Welding Inspector
Oct 2018
— Mar 2019
Foundation, Dimensional, Erection and Installation, Alignment Inspection of Static, Rotating Equipment’s, Boiler, Economizer, Super heater, Waste Charging System, Combustion Grate, Ash System, Piping, Boiler Structure Column Cranes etc.
Column, Separator, Dehydrator, Desalter, internal trays installation, Welding, Torque, Leak test Inspection
Boiler Structure, Piping, Valves, Static, Rotating Equipment’s, Alignment, Final Bolt Torqueing Inspection
Mechanical Completion MC walk down with client for Piping, Static, Rotating Equipment’s, Boiler etc.
Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
Issuance of non-conformance reports (NCR) and action for timely closing
Preparing Test Package for Hydro and Pneumatic test
Coordination with construction Team for Piping, Valve re Instatement Inspection activities
Line check before commissioning activities and assist in Punch list preparation
Prepare Inspection Report and Documentation to Close the RFI
Piping Spool Released Document Preparation and Offering to Client Inspection team
Witness and Review of Various NDT, PWHT & HT Reports
Coordination with the NDT/ PWHT crew
Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
Checked valve orientation on high pressure steam and other critical lines before erection / fit up
Verification of field rectification report issued by construction (IFC)
Line check before commissioning activities and assist in test pack preparation
Erection and Installation Inspection of Piping and Fittings as per Approved isometric drawing & PID
Inspection of Punch listing Prior to MC, RFC & RFSU
Coordinate to Client & third party Inspection team
Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
Coordinate with Construction and Engineering Dept. for as-built drawings final acceptance Etc.
Coordinate Internal QA/QC Audit team
Preservation of Static and Rotating equipment, valves as per vendor requirements
Welder RT Performance updating and monitor project repair percentage and welder wise
Radiographic (RT) Film Interpretation and updating NDT request
Mechanical QA/QC Engineer
Mar 2018
— Oct 2018
Pipe fit up, Weld Visual Inspection, NDT Coordination and Related Documents Preparation
Spool released Documents Preparation and offering client inspection
Maintaining the records and Calibration Certificate data such as Welding Machine, Quivers, Inspection tools
Maintaining the records WPS, PQR, Welder Qualification Certificate related documentations
Issuance of non-conformance reports (NCR) and action for timely closing
Coordinate to Client & third party inspector
To Fallow up Every inspection as per Approved ITP Sequence
Coordinate weakly QA/QC meeting to Client & Subcontractor
Coordinate weakly QA/QC internal Audit Etc
Coordination with the NDT/ PWHT crew
Updating and monitor Daily RFI Status
Updating daily welding and NDT, PWHT & HT Reports to Weld Summary Sheet
Preparing hydro test package
Conducting welder Qualification test, Welder ID card new and renewal card
Coordination with construction Team for Re Instatement activities
Witness and Review of Various NDT,PMI,PWHT & HT Reports
Welder RT Performance updating and monitor project repair percentage and welder wise
Mechanical QC Engineer
Nov 2014
— Oct 2017
Foundation, Erection, Installation, Dimensional, Alignment, Inspection of Boiler,Piping,Static and rotating, Equipment’s
Column internal trays installation, dimension, orientation, Leak test inspection
Boiler Structure, Steel Structure, Static, Rotating Equipment, Manhole Flange, column Alignment Bolt Torqueing Inspection, Grouting Inspection and related Reports preparation
Preservation of static and rotating equipment as per vendor requirements
Prepare inspection reports & Documentation to submit RFI Client
Pipe fit up, Weld Visual Inspection, NDT Coordination and Related Documents Preparation
Spool released Documents Preparation and offering client inspection
Maintaining the records and Calibration Certificate data such as Welding Machine, Quivers, Inspection tools
Maintaining the records WPS, PQR, Welder Qualification Certificate related documentations
Issuance of non-conformance reports (NCR) and action for timely closing
Coordinate to Client & third party inspector
To Fallow up Every inspection as per Approved ITP Sequence
Mechanical QC Supervisor
Aug 2012
— Jun 2013
Foundation, Dimensional, Erection and Installation, Alignment, Bolt torqueing Inspection of Static, Rotating Equipment’s, Piping, Valves, Boiler, Economizer, Super heater, Waste Charging System, Combustion Grate, Ash System, Piping, Boiler steel structure, Flare stack, Cranes etc.
Column, Separator, Dehydrator, Desalter, internal trays installation, Welding, Torque, Leak test Inspection
Inspection of Punch listing Prior to MC, RFC & RFSU
Coordinate to Client & third party Inspection team
Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
Preservation of Static and Rotating equipment, valves as per vendor requirements
Preparation Verification of Mechanical Completion certificate and RFI status to PCOS Updating
Mechanical QA/QC Inspector
Jan 2011
— Aug 2012
Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
Issuance of non-conformance reports (NCR) and action for timely closing
Preparing Test Package for Hydro and Pneumatic test
Coordination with construction Team for Piping, Pipeline valve re Instatement Inspection activities
Line check before commissioning activities and assist in Punch list preparation
Prepare Inspection Report and Documentation to Close the RFI
Piping Spool Released Document Preparation and Offering to Client Inspection team
Witness and Review of Various NDT, PWHT & HT Reports and Coordination NDT/PWHT Crew
Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
Checked valve orientation on high pressure steam and other critical lines before erection / fit up
Verification of field rectification report issued by construction (IFC)
Line check before commissioning activities and assist in test pack preparation
Erection and Installation Inspection of Piping, Pipeline and Fittings as per Approved Isometric & PID
Inspection of Punch listing Prior to MC, RFC & RFSU
Coordinate to Client & third party Inspection team
Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
Coordinate with Construction and Engineering Dept. for as-built drawings final acceptance Etc.
Coordinate Internal QA/QC Audit team
Preservation of Static and Rotating equipment, valves as per vendor requirements
Welder RT Performance updating and monitor project repair percentage and welder wise
Radiographic (RT) Film Interpretation and updating NDT request
PMI Checking in all Project raw material and all related documents
Mechanical QA/QC Inspector
Jul 2008
— Dec 2009
Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
Issuance of non-conformance reports (NCR) and action for timely closing
Preparing Test Package for Hydro and Pneumatic test
Coordination with construction Team for Piping, Pipeline valve re Instatement Inspection activities
Line check before commissioning activities and assist in Punch list preparation
Prepare Inspection Report and Documentation to Close the RFI
Piping Spool Released Document Preparation and Offering to Client Inspection team
Witness and Review of Various NDT, PWHT & HT Reports and Coordination NDT/PWHT Crew
Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
Checked valve orientation on high pressure steam and other critical lines before erection / fit up
Verification of field rectification report issued by construction (IFC)
Line check before commissioning activities and assist in test pack preparation
Erection and Installation Inspection of Piping, Pipeline and Fittings as per Approved Isometric & PID
Inspection of Punch listing Prior to MC, RFC & RFSU
Coordinate to Client & third party Inspection team
Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
Coordinate with Construction and Engineering Dept. for as-built drawings final acceptance Etc.
Coordinate Internal QA/QC Audit team
Preservation of Static and Rotating equipment, valves as per vendor requirements
PMI Checking in all Project raw material and all related documents
Verified subcontractor MC, RFC & RFSU, Hand over completion dossier
Mechanical QA/QC Inspector
Jun 2007
— Jun 2008
Foundation, Dimensional, Erection and Installation, Alignment, Bolt torqueing Inspection of Static, Rotating Equipment’s, Piping, Valves, Boiler, Economizer, Super heater, Waste Charging System, Combustion Grate, Ash System, Piping, Boiler steel structure, Flare stack, Cranes etc.
Column, Separator, Dehydrator, Desalter, internal trays installation, Welding, Torque, Leak test Inspection
Mechanical Completion MC walk down with client for Piping, Static, Rotating Equipment’s, Boiler etc.
Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
Issuance of non-conformance reports (NCR) and action for timely closing
Preparing Test Package for Hydro and Pneumatic test
Coordination with construction Team for Piping, Pipeline valve re Instatement Inspection activities
Line check before commissioning activities and assist in Punch list preparation
Prepare Inspection Report and Documentation to Close the RFI
Piping Spool Released Document Preparation and Offering to Client Inspection team
Witness and Review of Various NDT, PWHT & HT Reports and Coordination NDT/PWHT Crew
Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
Checked valve orientation on high pressure steam and other critical lines before erection / fit up
Verification of field rectification report issued by construction (IFC)
Line check before commissioning activities and assist in test pack preparation
Erection and Installation Inspection of Piping, Pipeline and Fittings as per Approved Isometric & PID
Mechanical QA/QC Supervisor
May 2003
— Current
Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
Issuance of non-conformance reports (NCR) and action for timely closing
Preparing Test Package for Hydro and Pneumatic test
Coordination with construction Team for Piping, Pipeline valve re Instatement Inspection activities
Line check before commissioning activities and assist in Punch list preparation
Prepare Inspection Report and Documentation to Close the RFI
Piping Spool Released Document Preparation and Offering to Client Inspection team
Witness and Review of Various NDT, PWHT & HT Reports and Coordination NDT/PWHT Crew
Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
Checked valve orientation on high pressure steam and other critical lines before erection / fit up
Verification of field rectification report issued by construction (IFC)
Line check before commissioning activities and assist in test pack preparation
Erection and Installation Inspection of Piping, Pipeline and Fittings as per Approved Isometric & PID
Inspection of Punch listing Prior to MC, RFC & RFSU
Coordinate to Client & third party Inspection team
Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
Coordinate with Construction and Engineering Dept. for as-built drawings final acceptance Etc.
Coordinate Internal QA/QC Audit team
Preservation of Static and Rotating equipment, valves as per vendor requirements
Welder RT Performance updating and monitor project repair percentage and welder wise
Radiographic (RT) Film Interpretation and updating NDT request
PMI Checking in all Project raw material and all related documents
Preparation Verification of Mechanical Completion certificate and RFI status to PCOS Updating
Verified subcontractor MC, RFC & RFSU, Hand over completion dossier
Coordinate PQR / WQT Qualification and related Documentation
Preparing Welder Qualification Certificate, Welder ID card, Keep Update Welder Summary log
Ensure that all Inspection activities as per Approved ITP, WPS, Codes / Specifications / Standards
Keep updating, Maintain the Calibration Certificate such as Welding Machine, Oven, Quivers, Gauges
Torqueing Machine and Inspection related tools
Maintaining the records WPS, PQR, Welder Qualification Certificate related QA/QC Documents