QA/QC, Mechanical, Piping, Welding, NDT, Inspection


Last Updated: 13th September 2019 (over 3 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
25 to 34

Qualification Level
Trade Qualification

Languages
English, Hindi

Summary

16 Yrs Experience in QA/QC Mechanical, Piping, Pipeline, Welding, Equipment’s, Boiler, Installation, Alignment, Fabrication, NDT, PWHT, Hydro / Pneumatic Test, Test Package and Dossier Preparation and verification, PQR / WQT Coordination in the field of Oil, Gas Petrochemical, Power Plant Construction related Projects in Qatar, Saudi Arabia, United Arab Emirates, Iraq, Singapore and India

Education

TWI.UK
CSWIP 3.1 Welding Inspector. (Cert No.336615). TWI.UK

   Jun 2018
— Jul 2018

CSWIP 3.1 Welding Inspector. (Cert No.336615). TWI.UK

Srinivasa Subbaraya Polytechnic, Collage, Puttur, Tamilnadu, India
Diploma Mechanical Engineer

   Aug 2000
— May 2003

Experience

ONESTA Engineering Services Private Ltd. India
QA/QC Mechanical Engineer

   Apr 2019

 Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
 Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
 Issuance of non-conformance reports (NCR) and action for timely closing
 Preparing Test Package for Hydro and Pneumatic test
 Coordination with construction Team for Piping, Valve re Instatement Inspection activities
 Line check before commissioning activities and assist in Punch list preparation
 Prepare Inspection Report and Documentation to Close the RFI
 Piping Spool Released Document Preparation and Offering to Client Inspection team
 Witness and Review of Various NDT, PWHT & HT Reports
 Coordination with the NDT/ PWHT crew
 Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
 Checked valve orientation on high pressure steam and other critical lines before erection / fit up
 Verification of field rectification report issued by construction (IFC)
 Line check before commissioning activities and assist in test pack preparation
 Erection and Installation Inspection of Piping and Fittings as per Approved isometric drawing & PID
 Inspection of Punch listing Prior to MC, RFC & RFSU
 Coordinate to Client & third party Inspection team
 Updating, Monitor daily RFI Status as per Approved ITP Sequence and log

ENKA Insaat ve Sanayi A.S
QA/QC Mechanical / Welding Inspector

   Oct 2018
— Mar 2019

 Material receiving and related documents Inspection of Piping, Fittings, Static and Rotating Equipment’s, Boiler Panel, Economizer, Super heater, Evaporator, Turbine, Combustion Grate etc.
 Foundation, Dimensional, Erection and Installation, Alignment Inspection of Static, Rotating Equipment’s, Boiler, Economizer, Super heater, Waste Charging System, Combustion Grate, Ash System, Piping, Boiler Structure Column Cranes etc.
 Column, Separator, Dehydrator, Desalter, internal trays installation, Welding, Torque, Leak test Inspection
 Boiler Structure, Piping, Valves, Static, Rotating Equipment’s, Alignment, Final Bolt Torqueing Inspection
 Mechanical Completion MC walk down with client for Piping, Static, Rotating Equipment’s, Boiler etc.
 Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
 Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
 Issuance of non-conformance reports (NCR) and action for timely closing
 Preparing Test Package for Hydro and Pneumatic test
 Coordination with construction Team for Piping, Valve re Instatement Inspection activities
 Line check before commissioning activities and assist in Punch list preparation
 Prepare Inspection Report and Documentation to Close the RFI
 Piping Spool Released Document Preparation and Offering to Client Inspection team
 Witness and Review of Various NDT, PWHT & HT Reports
 Coordination with the NDT/ PWHT crew
 Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
 Checked valve orientation on high pressure steam and other critical lines before erection / fit up
 Verification of field rectification report issued by construction (IFC)
 Line check before commissioning activities and assist in test pack preparation
 Erection and Installation Inspection of Piping and Fittings as per Approved isometric drawing & PID
 Inspection of Punch listing Prior to MC, RFC & RFSU
 Coordinate to Client & third party Inspection team
 Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
 Coordinate with Construction and Engineering Dept. for as-built drawings final acceptance Etc.
 Coordinate Internal QA/QC Audit team
 Preservation of Static and Rotating equipment, valves as per vendor requirements
 Welder RT Performance updating and monitor project repair percentage and welder wise
 Radiographic (RT) Film Interpretation and updating NDT request

Jr Engineering Contractor
Mechanical QA/QC Engineer

   Mar 2018
— Oct 2018

 Prepare inspection reports & Documentation to submit RFI Client
 Pipe fit up, Weld Visual Inspection, NDT Coordination and Related Documents Preparation
 Spool released Documents Preparation and offering client inspection
 Maintaining the records and Calibration Certificate data such as Welding Machine, Quivers, Inspection tools
 Maintaining the records WPS, PQR, Welder Qualification Certificate related documentations
 Issuance of non-conformance reports (NCR) and action for timely closing
 Coordinate to Client & third party inspector
 To Fallow up Every inspection as per Approved ITP Sequence
 Coordinate weakly QA/QC meeting to Client & Subcontractor
 Coordinate weakly QA/QC internal Audit Etc
 Coordination with the NDT/ PWHT crew
 Updating and monitor Daily RFI Status
 Updating daily welding and NDT, PWHT & HT Reports to Weld Summary Sheet
 Preparing hydro test package
 Conducting welder Qualification test, Welder ID card new and renewal card
 Coordination with construction Team for Re Instatement activities
 Witness and Review of Various NDT,PMI,PWHT & HT Reports
 Welder RT Performance updating and monitor project repair percentage and welder wise

Jurong Engineering Ltd
Mechanical QC Engineer

   Nov 2014
— Oct 2017

 Material receiving and Related Documents Inspection of Piping, Fittings, Static and Rotating Equipment’s
 Foundation, Erection, Installation, Dimensional, Alignment, Inspection of Boiler,Piping,Static and rotating, Equipment’s
 Column internal trays installation, dimension, orientation, Leak test inspection
 Boiler Structure, Steel Structure, Static, Rotating Equipment, Manhole Flange, column Alignment Bolt Torqueing Inspection, Grouting Inspection and related Reports preparation
 Preservation of static and rotating equipment as per vendor requirements
 Prepare inspection reports & Documentation to submit RFI Client
 Pipe fit up, Weld Visual Inspection, NDT Coordination and Related Documents Preparation
 Spool released Documents Preparation and offering client inspection
 Maintaining the records and Calibration Certificate data such as Welding Machine, Quivers, Inspection tools
 Maintaining the records WPS, PQR, Welder Qualification Certificate related documentations
 Issuance of non-conformance reports (NCR) and action for timely closing
 Coordinate to Client & third party inspector
 To Fallow up Every inspection as per Approved ITP Sequence

Saipem SPA- Abu Dhabi. UAE
Mechanical QC Supervisor

   Aug 2012
— Jun 2013

 Material receiving and related documents Inspection of Piping, Fittings, Static and Rotating Equipment’s, Boiler Panel, Economizer, Super heater, Evaporator, Turbine, Combustion Grate, Flare stack etc.
 Foundation, Dimensional, Erection and Installation, Alignment, Bolt torqueing Inspection of Static, Rotating Equipment’s, Piping, Valves, Boiler, Economizer, Super heater, Waste Charging System, Combustion Grate, Ash System, Piping, Boiler steel structure, Flare stack, Cranes etc.
 Column, Separator, Dehydrator, Desalter, internal trays installation, Welding, Torque, Leak test Inspection
 Inspection of Punch listing Prior to MC, RFC & RFSU
 Coordinate to Client & third party Inspection team
 Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
 Preservation of Static and Rotating equipment, valves as per vendor requirements
 Preparation Verification of Mechanical Completion certificate and RFI status to PCOS Updating

Black cat Engineering Construction Company WLL. Qatar
Mechanical QA/QC Inspector

   Jan 2011
— Aug 2012

 Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
 Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
 Issuance of non-conformance reports (NCR) and action for timely closing
 Preparing Test Package for Hydro and Pneumatic test
 Coordination with construction Team for Piping, Pipeline valve re Instatement Inspection activities
 Line check before commissioning activities and assist in Punch list preparation
 Prepare Inspection Report and Documentation to Close the RFI
 Piping Spool Released Document Preparation and Offering to Client Inspection team
 Witness and Review of Various NDT, PWHT & HT Reports and Coordination NDT/PWHT Crew
 Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
 Checked valve orientation on high pressure steam and other critical lines before erection / fit up
 Verification of field rectification report issued by construction (IFC)
 Line check before commissioning activities and assist in test pack preparation
 Erection and Installation Inspection of Piping, Pipeline and Fittings as per Approved Isometric & PID
 Inspection of Punch listing Prior to MC, RFC & RFSU
 Coordinate to Client & third party Inspection team
 Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
 Coordinate with Construction and Engineering Dept. for as-built drawings final acceptance Etc.
 Coordinate Internal QA/QC Audit team
 Preservation of Static and Rotating equipment, valves as per vendor requirements
 Welder RT Performance updating and monitor project repair percentage and welder wise
 Radiographic (RT) Film Interpretation and updating NDT request
 PMI Checking in all Project raw material and all related documents

Saudi International Petrochemical Company Saudi Arabia
Mechanical QA/QC Inspector

   Jul 2008
— Dec 2009

 Mechanical Completion MC walk down with client for Piping, Static, Rotating Equipment’s, Boiler etc.
 Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
 Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
 Issuance of non-conformance reports (NCR) and action for timely closing
 Preparing Test Package for Hydro and Pneumatic test
 Coordination with construction Team for Piping, Pipeline valve re Instatement Inspection activities
 Line check before commissioning activities and assist in Punch list preparation
 Prepare Inspection Report and Documentation to Close the RFI
 Piping Spool Released Document Preparation and Offering to Client Inspection team
 Witness and Review of Various NDT, PWHT & HT Reports and Coordination NDT/PWHT Crew
 Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
 Checked valve orientation on high pressure steam and other critical lines before erection / fit up
 Verification of field rectification report issued by construction (IFC)
 Line check before commissioning activities and assist in test pack preparation
 Erection and Installation Inspection of Piping, Pipeline and Fittings as per Approved Isometric & PID
 Inspection of Punch listing Prior to MC, RFC & RFSU
 Coordinate to Client & third party Inspection team
 Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
 Coordinate with Construction and Engineering Dept. for as-built drawings final acceptance Etc.
 Coordinate Internal QA/QC Audit team
 Preservation of Static and Rotating equipment, valves as per vendor requirements
 PMI Checking in all Project raw material and all related documents
 Verified subcontractor MC, RFC & RFSU, Hand over completion dossier

Gama Com W.L.L Qatar
Mechanical QA/QC Inspector

   Jun 2007
— Jun 2008

 Material receiving and related documents Inspection of Piping, Fittings, Static and Rotating Equipment’s, Boiler Panel, Economizer, Super heater, Evaporator, Turbine, Combustion Grate, Flare stack etc.
 Foundation, Dimensional, Erection and Installation, Alignment, Bolt torqueing Inspection of Static, Rotating Equipment’s, Piping, Valves, Boiler, Economizer, Super heater, Waste Charging System, Combustion Grate, Ash System, Piping, Boiler steel structure, Flare stack, Cranes etc.
 Column, Separator, Dehydrator, Desalter, internal trays installation, Welding, Torque, Leak test Inspection
 Mechanical Completion MC walk down with client for Piping, Static, Rotating Equipment’s, Boiler etc.
 Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
 Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
 Issuance of non-conformance reports (NCR) and action for timely closing
 Preparing Test Package for Hydro and Pneumatic test
 Coordination with construction Team for Piping, Pipeline valve re Instatement Inspection activities
 Line check before commissioning activities and assist in Punch list preparation
 Prepare Inspection Report and Documentation to Close the RFI
 Piping Spool Released Document Preparation and Offering to Client Inspection team
 Witness and Review of Various NDT, PWHT & HT Reports and Coordination NDT/PWHT Crew
 Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
 Checked valve orientation on high pressure steam and other critical lines before erection / fit up
 Verification of field rectification report issued by construction (IFC)
 Line check before commissioning activities and assist in test pack preparation
 Erection and Installation Inspection of Piping, Pipeline and Fittings as per Approved Isometric & PID

MIL Industries Ltd. Chennai.India
Mechanical QA/QC Supervisor

   May 2003
— Current

 Mechanical Completion MC walk down with client for Piping, Static, Rotating Equipment’s, Boiler etc.
 Piping, Pipeline, Fit up, Welding, Weld Visual Inspection and Related Documentation
 Updating Daily Fit-up, Welding and NDT, PWHT & HT Reports to Weld Summary Sheet
 Issuance of non-conformance reports (NCR) and action for timely closing
 Preparing Test Package for Hydro and Pneumatic test
 Coordination with construction Team for Piping, Pipeline valve re Instatement Inspection activities
 Line check before commissioning activities and assist in Punch list preparation
 Prepare Inspection Report and Documentation to Close the RFI
 Piping Spool Released Document Preparation and Offering to Client Inspection team
 Witness and Review of Various NDT, PWHT & HT Reports and Coordination NDT/PWHT Crew
 Witnessed Hydro test, Pneumatic test, Reinforcement pad leak test, flushing /air blowing
 Checked valve orientation on high pressure steam and other critical lines before erection / fit up
 Verification of field rectification report issued by construction (IFC)
 Line check before commissioning activities and assist in test pack preparation
 Erection and Installation Inspection of Piping, Pipeline and Fittings as per Approved Isometric & PID
 Inspection of Punch listing Prior to MC, RFC & RFSU
 Coordinate to Client & third party Inspection team
 Updating, Monitor daily RFI Status as per Approved ITP Sequence and log
 Coordinate with Construction and Engineering Dept. for as-built drawings final acceptance Etc.
 Coordinate Internal QA/QC Audit team
 Preservation of Static and Rotating equipment, valves as per vendor requirements
 Welder RT Performance updating and monitor project repair percentage and welder wise
 Radiographic (RT) Film Interpretation and updating NDT request
 PMI Checking in all Project raw material and all related documents
 Preparation Verification of Mechanical Completion certificate and RFI status to PCOS Updating
 Verified subcontractor MC, RFC & RFSU, Hand over completion dossier
 Coordinate PQR / WQT Qualification and related Documentation
 Preparing Welder Qualification Certificate, Welder ID card, Keep Update Welder Summary log
 Ensure that all Inspection activities as per Approved ITP, WPS, Codes / Specifications / Standards
 Keep updating, Maintain the Calibration Certificate such as Welding Machine, Oven, Quivers, Gauges
Torqueing Machine and Inspection related tools
 Maintaining the records WPS, PQR, Welder Qualification Certificate related QA/QC Documents

Ad
Ad
Ad