
Mechanical projects manager
Last Updated: 12th September 2017 (over 5 years ago)
Summary
I am performing the following:
Supervising Primary Design, Planning, Design, Submittals, Modification of the Design, Approvals, Construction, Testing, Commissioning, Operation, Maintenance & Handing over
Education
Power mechanical Engineer
Oct 1979
— Jul 1984
Experience
Senior Mechanical Engr
Feb 2012
— Current
• Review the primary shop drawings, material submission & required tests.
• supervise the construction with its required tests & modifications.
• Approving AS-built drawings, final tests, handing over & operation.
project manager
Jan 2002
— Feb 2012
• Responsible about preparing of shop drawings, in AutoCAD format, describing the layout and arrangement of equipment, buildings, tanks, vessels, and piping systems for the various projects (potable water and wastewater plants). This includes development of piping and instrumentation diagrams, schematics, general arrangement, piping, elevation, isometric, and other drawings.
• Preparing the Projects submittals for the client for approval.
• Preparing bill of materials for equipment, pipes and all accessories for plant.
• Communicating with Consultant regarding Submittals for getting approvals.
• Communicating with site engineers to solve the installation problems.
• Preparing the As-Built Drawings.
• Supervising the construction then O & M of Saudi National Guard Plant (SANG) as Electro- Mechanical Projects Manager.
• Working as Contractor Quality Manager in (SANG). U. S. Army Was the consultant of the project.
• Working as Electro-Mechanical projects Manager in Hunnay Plant, Arrar Plant & Maddinah Munnawarah Plant, to complete the construction but mainly O & M
CHIEF ENGINEER
Dec 1989
— Jul 2001
• Responsible for preparing shop drawings for Variation orders & modifications, describing the layout and arrangement of equipment, buildings, tanks, vessels, and piping systems for the various projects (potable water and wastewater plants). This includes development of piping and instrumentation diagrams, schematics, general arrangement, piping, elevation, isometric, and other drawings.
• Preparing the Projects submittals for the client for approval.
• Preparing bill of materials for equipment, pipes and all accessories for plant.
• Communicating with Consultant regarding Submittals for getting approvals.
• Supervising site engineers to solve the maintenance, Repair & installation problems.
• Preparing the As-Built Drawings.
• Supervising all periodic preventive & corrective maintenance.
Site / Shift Engineer
Mar 1986
— Dec 1989
• Responsible about the Power house Equipments, load, security, Maintenance works during my shift.
• Preparing the report about the main events during the shift regarding plant load, equipments, Tripping, Instruction of control center of Electricity networks any running or planned requested Maintenance.
• Full Control of complete power house staff.
• In emergency to prepare emergency team staff those waiting for calls to handle maintenance
Facility engineer
Oct 1984
— Jan 1986