civil engineer


Last Updated: 13th May 2017 (over 5 years ago)

Address
Constanta, Romania

E-mail
Locked

Phone Number
Locked

Qualification Level
Degree

Languages
English, French, Portuguese

Summary

I have relevant work experience (33 years - 22 like site manager) in the area of construction. I believe to be suitable candidate for this position, since I possess all the necessary qualification to perform my duties in effective and efficient manner. As you may note in the enclosed resume, I have excellent results in managing resource in different projects in order to maintain quality portfolio. In addition I have demonstrated capability to understand technological issues, and I am experienced in the managing of teams to ensure punctual completion of work, preserving expected workload of each team member. Furthermore I would like to point out that I am well acquainted with MS Office, MS Project, AutoCAD and other software.

Education

Institute of Engineering Construction Romania
Bachelor Degree

   Sep 1978
— Jun 1982

Hydraulics, Hydrotechnics

Experience

Kora Angola Lda
site manager supervision

   Jun 2012
— Jan 2016

city of KUITO and Andulo to a project to build 6000 units houses and all necessary infrastructure. I am responsible in Groundworks, infrastructure works like RC frame and structures, steel works, electrical line systems, concrete form works, reinforced concrete works, culverts, small bridges, roads, pavement, asphalt roads, landscape, Compacted ramps for Houses with Apartments , sewerage systems , water supply system, Water treatment plant, drainage, waste water systems including Waste water treatment plant, Bridges…etc.

Beton&Rohrbau Gmbh
site manager

   Feb 2010
— May 2012

to New Waste water treatment plant in Eforie Sud, Roumanie. The Plant serves to 28 000 residents-project value- 28 million EURO.

SC Ant&LAU Srl
site manager

   Mar 2006
— Nov 2009

THE NEW BUILDING of the MAYORALTY in Casimcea Town- 180 Km of roads, Water supply and sewerage systems in Babadag, Mihail Kogalniceanu, Razboieni and Lastuni city –Tulcea county, Roumanie. Project Value – 16 million EU.
(FIDIC CONTRACT) - Special construction Roads (234 Km), crane platforms and special reinforced concrete foundation for wind power plant to the Fantanele site – Romania. Project value - 1, 5 billion EURO.
(FIDIC CONTRACT) to execution of NEW SEWERAGE SYSTEMS IN CONSTANTA CITY. Project value 150 million EURO

Sc STIZO NUCLEAR SA
site manager

   Mar 2003
— Feb 2006

(FIDIC CONTRACT) - CONSTRUCTIONS-HIGHT STRUCTURES (Reinforced concrete, steel Towers, Surface and underground tanks.) and special INSULATIONS (Workshop fabricated, and installation of steel structures, steel or aluminum. Install insulation on metal supports. Manufacture and installation of protective sheet made of galvanized, aluminum or stainless steel.)
TO NUCLEAR PLANT IN CERNAVODA (ROUMANIE). Project value – 120 million EU

SC Marine&Services SA
site engineer, site supervisor and site manager

   Apr 1992
— Jan 2003

NEW PORT CONSTANTZA SOUTH, CONTAINER TERMINAL to AGIGEA TO BLACK SEA,
BREAKWATERS TO PORT MANGALIA TO BLACK SEA, Dredging works.

1998-2002 - SITE MANAGER- Supervision (FIDIC CONTRACT) -THE NEW AIRPORT OF BEIRUT (LEBANON) like that – Execute of RC structures of new terminal, Execute groundwork and foundation and the Aircraft runways, Execute reinforced concrete platforms. Execute endowment of all of this (installations, tunnels). Project Value – 140 million USD
Site Manager to BEIRUT PORT -The MAIN BREAKWATER, WARFS, BERTHS AND DREDGING to Beirut Port. Extend the Container Terminal to Beirut Port
-EXTEND AND MAINTENANCE OF PORT ALGER –ALGERIE. Execution of docks, piers, jetty’s, dredging the old port.

2002. DREDGING IN PORT MERSYN (TURKYE).
SITE MANAGER -THE NEW MAIN BREAKWATER IN ASHDOD (ISRAEL). (FIDIC CONTRACT) -Executed Concrete works for maritime cranes on docks, Wharfs, Berth, Dredging. All Infrastructure of the new port extended. Execution of the New Container Terminal, of port Ashdod. Project Value – 1. 4 billion USD

1984 - 1992-HYDROTECHNICS CONSTRUCTION COMPANY-SITE ENGINEER -CONSTRUCTIONS.
NEW PORTS TO MEDGIDIA, BASARABI, AGIGEA, NAVODARI city
1992 – Site Engineer - Extend infrastructure of the port and extended the main breakwater in PORT NADOOR –MOOROCO.

Hydrotechnics Construction Company Romania
site engineer

   Feb 1984
— Nov 1991

Execution of two navigable channels like so – first channel 62 km from DanubeTo Black Sea.Second – Poarta Alba – Black Sea with 32 km.
Works executed.
Large excavations navigation channel with a depth of 60 m, including front blasting work. Protections massive slopes with massive concrete walls, gabion. The execution of the foundation pillars supporting the two bridges over the canal each aperture of 160 m. installing the decks at the two bridges support the cables. Execution of the foundations and locks Agigea and Ovidiu city, lock 2-way transit for vessels up to 20,000 DWT capacity.

Irrigation Company Romania
Junior Site Engineer

   Aug 1982
— Jun 1984

Building in irrigation systems and drainage systems, building boosting and rebooting pump stations.

Ad
Ad
Ad