Summary

After a year of training in the metallurgical field and the destructive and non-destructive controls, in 1994 I joined my first project of construction and petrochemical installations in Algeria, to implement my knowledge, and since , I keep evolving from one project to another, within world-renowned companies like JGC, Bonatti, Petrofac, ect... My 23 years of experience have enabled me to successfully complete the various tasks and inspection missions QC and NDT that have been allocated to me.
Experience and professional awareness animate my desire to rise to the challenge that will live up to my expectations, as a result, I aspire to a new environment, and a pleasant framework of work, different from the previous one.

Education

ASNT SNT-TC-1A
NDT Lev ll

   Apr 2015
— Jul 2015

RT UT MT PT VT

COFREND
NDT Lev ll

   Mar 2014
— May 2014

RT X & Gamma

ALTRA Welding School
NDT Controller Polyvalent

   Apr 1993
— Apr 1994

Training versatile Welding Controller, (currently Recognized by COFREND France).

University of Oran Algeria
Bachelor

   Jun 1984
— Jul 1984

Science

Experience

SONATRACH / BONATTI / PETROFAC
QC & NDT Inspector

   Oct 2014
— Apr 2017

- Assistance to the various mechanical tests in order to qualify the WPS/PQR welding procedures.
- Follow-up and monitoring NDT control (RT-UT-MT-PT-VT), and interpretation of radiographic films of welded joints Site/prefabrication.
- Follow-up and control of the spools assembly on rack according to numbering and isometric planes.
- Monitoring and control of the assembly, welding and testing of the pressure equipment at the factory.
- Follow-up of NCR, control of damage and conformity of spools.
- Conformity control, welding and fitting of the flanges and valves with the planes, direction, and access.
- Control and preservation, lines for hydrostatic tests.
- Control of the Supports of the lines.
- Assistance to the various stages of hydrostatic tests, and their good conduct according to procedure.
- Assistance with the relocation of the lines after hydrostatic tests
- Establishment of the PV of all checks carried out, and classifications.

SONATRACH / JGC Japan
QC & NDT Inspector

   Jul 2009
— Sep 2014

- Assistance to the various mechanical tests in order to qualify the WPS/PQR welding procedures.
- Follow-up and monitoring NDT control (RT-UT-MT-PT-VT), and interpretation of radiographic films of welded joints Site/prefabrication.
- Follow-up and control of the spools assembly on rack according to numbering and isometric planes.
- Monitoring and control of the assembly, welding and testing of the pressure equipment at the factory.
- Follow-up of NCR, control of damage and conformity of spools.
- Conformity control, welding and fitting of the flanges and valves with the planes, direction, and access.
- Control and preservation, lines for hydrostatic tests.
- Control of the Supports of the lines.
- Assistance to the various stages of hydrostatic tests, and their good conduct according to procedure.
- Assistance with the relocation of the lines after hydrostatic tests
- Establishment of the PV of all checks carried out, and classifications.

SONATRACH / SAÏPEM
NDT Controller Lev ll

   Jul 2005
— Jul 2009

-Follow up, and monitoring visual inspection of welded joints
-Monitoring control of welded joints Site/prefabrication by the various NDT (RT-UT-MT-PT-VT).
-Monitoring interpretation of radiographic films of welded joints Site/prefabrication.
-Monitoring and control of the Assembly, assembly, welding and testing of the pressure equipment at the factory.
-Monitoring and control of the spool assembly according to isometric numbering and planes,
-Checking of the damage and conformity of the spools
-The preservation and control of the lines, the supports, for hydrostatic tests.
-Establishment of the PV of all the checks carried out.

SONATRACH / BHPBilliton / SAÏPEM
NDT Controller Lev ll

   Jun 2002
— Jun 2005

-Follow up, and monitoring visual inspection of welded joints
-Monitoring control of welded joints Site/prefabrication by the various NDT (RT-UT-MT-PT-VT).
-Monitoring interpretation of radiographic films of welded joints Site/prefabrication.
-Monitoring and control of the Assembly, assembly, welding and testing of the pressure equipment at the factory.
-Monitoring and control of the spool assembly according to isometric numbering and planes,
-Checking of the damage and conformity of the spools
-The preservation and control of the lines, the supports, for hydrostatic tests.
-Establishment of the PV of all the checks carried out.

SONATRACH / SOFRESID
NDT Controller Lev ll

   Jul 2000
— May 2002

-Follow up, and monitoring visual inspection of welded joints
-Monitoring control of welded joints Site/prefabrication by the various NDT (RT-UT-MT-PT-VT).
-Monitoring interpretation of radiographic films of welded joints Site/prefabrication.
-Monitoring and control of the Assembly, assembly, welding and testing of the pressure equipment at the factory.
-Monitoring and control of the spool assembly according to isometric numbering and planes,
-Checking of the damage and conformity of the spools
-The preservation and control of the lines, the supports, for hydrostatic tests.
-Establishment of the PV of all the checks carried out.

SONATRACH / SNC-Lavalin
NDT Controller Lev ll

   Nov 1998
— Jun 2002

-Follow up, and monitoring visual inspection of welded joints
-Monitoring control of welded joints Site/prefabrication by the various NDT (RT-UT-MT-PT-VT).
-Monitoring interpretation of radiographic films of welded joints Site/prefabrication.
-Monitoring and control of the Assembly, assembly, welding and testing of the pressure equipment at the factory.
-Monitoring and control of the spool assembly according to isometric numbering and planes,
-Checking of the damage and conformity of the spools
-The preservation and control of the lines, the supports, for hydrostatic tests.
-Establishment of the PV of all the checks carried out.

SONATRACH / SOFRESID
NDT Controller Lev l

   Apr 1994
— Oct 1998

-Monitoring, visual inspection of welded joints
-Preparation and realization of radiographic images of welded joints Site/prefabrication.
-Preparation of the products of chilling and realization of the controls on seals designated by level 2 technician.
-Monitoring of welded joints Site/prefabrication.