Senior Mechanical Engineer-Project Engineering
Last Updated: 15th July 2019 (over 3 years ago)
Summary
Have handled projects in the role of Project Manager and Lead engineer. Have independently handled medium to large-scale projects comprising of multi-disciplinary team of engineers, inspectors, expeditors and buyers responsible for basic & detail engineering, Scope of Work & specification preparation, bid evaluation, vendor document review, preparation & monitoring of schedule and resources, preparation & monitoring of budget/cost, vendor management, client management
Education
Bachelor of Engineering-Mechanical Engineering
Apr 1999
— Apr 2003
Completed year:- 2003
Class:- First Class with Distinction
Experience
Senior Mechanical Engineer(Project-engineering)
May 2016
— May 2018
i. Gas Metering Skid & Distribution Network(ARAMCO Standard):- Project manager responsible for engineering & coordination, planning, schedule & cost management, procurement, and execution management through vendor, for laying of new gas distribution network along with multiple treatment & metering skids of various capacities for individual customers for Light Industrial Park in Yanbu Industrial City, Saudi Arabia, conforming to ARAMCO standards and Royal Commission standards.
ii. Sea Water Reverse Osmosis plant: - 6x350 cum/hr, Total installed capacity of 50400 cum/day with provision for expansion to 100000 cum/day in next phase. In the capacity of Package Manager responsible for engineering & coordination, planning, budgeting, schedule & cost management, vendor document review.
iii. Industrial waste water transportation pipeline rehabilitation & installation:- Project manager responsible for engineering & coordination, planning, schedule & cost management, procurement, and execution management through vendor, for laying of new Industrial waste water transportation pipeline and construction of new lift stations & rehabilitation of existing waste water transportation pipeline along with lift stations in Yanbu conforming to Royal Commission standards.
iv. Sewage Treatment plant (SWTP) & Industrial Waste Water Treatment Plant (IWTP):- : - 30,000 m3/day capacity conventional activated sludge SWTP with provisions for expansion to 300,000 m3/d capacity AND 40,000 m3/day capacity extended air activated sludge with advanced secondary treatment IWTP, with provision for expansion to 120,000 m3/d in next phase. In the capacity of Senior Mechanical engineer for Project Engineering department responsible for review of all technical documents.
v. Project engineer for miscellaneous projects for up gradation of existing pump houses, compressed air station, HVAC system..etc.
Consultant
Jun 2015
— Apr 2016
Detail engineering of water &waste water treatment systems, cooling water distribution system, HVAC systems & other utility systems for two mini integrated steel plant projects at Chhattisgarh, India and Orissa India
Senior Engineer –Mechanical(Packaged Equipments)
Feb 2013
— Mar 2015
Projects :-
i. FPSO Pioneiro de Libra , Petrobras Brazil- Extended well testing FPSO of capacity 8000 sm3/d of oil, 4,000,000 sm3/d of gas and 4000 cum/d of produced water.
Packages handled:- Gas Dehydration system , Produced water treatment system, Potable water and demineralized water plant, Hypochlorite generation package.,
ii. Shell Malikai Tension Leg Platform, Offshore Sabah, East Malaysia(Nameplate capacity of 60,00bbl/day of liquid (oil + water) and 50 MMscf/d of gas):-
Packages handled:- Demineralized Water Package (RO+EDI), Multimedia Backwashable Fine Filter Package, HP Washdown Package, Gas Dewpointing Package,
iii. North Malay Basin Development (Feed engineering), Offshore Malaysia :-
Packages handled:- Produced water treatment system, Air compressor & Dryer Package
iv. Maharajalela South Offshore production platform, Offshore Brunei, (Early works):-
Packages handled:- MEG Injection package, Flare Package, Nitrogen & CO2 Bottle.
Assistant-Manager (Power projects)
Jun 2010
— Jan 2013
• Projects:-
i. Quarryah Combined Cycle Power Plant, Saudi Arabia: - Conversion of Open cycle plant to Combined cycle plant. Total generation capacity of 3190 MW.
Packages handled:- Water treatment system consisting of Multistage Flash Desalination system & MB, Effluent treatment system consisting of chemical neutralizing basin, oily water separator along with oily waste and chemical waste pumping system.
ii. DB Super Thermal Power Plant, Chattisgarh, India:- 2 X 660 MW Coal based thermal power project.
Packages handled:- Supervision of engineering of WBD, cooling water system, water treatment system (pretreatment & demineralized water plant), chlorination system etc.
Engineering of Effluent treatment system :- Sludge treatment system, Oily waste treatment system, Chemical waste treatment system, Ash handling system consisting of clarifier and ash pond, Sewage treatment plant(packaged).
iii. PPN Power Generating Co, Tamil Nadu, India: - 3 X 360 Combined Cycle project.
Packages handled:- Water treatment system consisting of Lamella clarifiers, filtration plant & Sea water based Reverse Osmosis plant. Effluent treatment system consisting of Chemical waste treatment neutralization basin, oily waste collection system and Oily water separator.
iv. LANCO, Vidharbha,:- Owner’s Engineering for 2 X 660 MW Coal based super critical power plant.
v. Proposal engineering for TPCIL power project:- 2 x 700 MW Coal based supercritical power project.
vi. Proposal Engineering for Beer Tuvia, Israel-1x 450 MW CCGT power project.
vii. Proposal Engineering for Ghorasal, Bangladesh, 1x 360 MW CCGT power project.
Senior Mechanical Engineer-Projects
Feb 2006
— May 2010
Leading a team of engineers for development of piping, ducting drawings, General Arrangement & Civil assignment drawings.
Total project management on behalf of Consulting Engineer Company including planning, preparation and monitoring of schedule, budgeting of man hour/resource and monitoring of cost. Also providing project management services to the client for planning, schedule & cost monitoring.
• Projects:-
i. I.S.P (SAIL), Burnpur,W.B -Universal Section Mill:-Project of 700000 tons/annum universal section mill at I.S.P Burnpur, supplied by SMS-Meer, Germany.
Detail engineering of Effluent treatment system consisting of scale pit, settling basin, filtration plant, sludge thickener and filter press,
ii. I.S.P (SAIL), Burnpur,W.B -Pig Casting Machine Complex:- Detail engineering of Water & effluent treatment system, HVAC & Utility system.
iii. ISTLL MIDDLE EAST LLC., Dubai: - Owner’s engineering as well as detail engineering for project of 550000 T/Annum POMINI make Rolling Mill with Monoblock Mill for wire Rod and Thermax TMT Line.
Deputed to Taiwan site for supervision of Dismantling of the Mill.
iv. BSP (SAIL), Bhilai, Slab Caster (No-6):- Project of Single Strand Jumbo Slab Caster supplied by Danieli Spa Italy. Detail engineering of Water, HVAC & Utility system on behalf of Utility system EPC contractor Danieli Engineering India Limited. Approval of drawings from owners engineer Centre for Engineering & Technology, Bhilai.
v. BSP (SAIL), Bhilai , LRF :- Project of 130 Ton Ladle Furnace supplied by Danieli & Centromet, Italy. Detail engineering of Water, HVAC & Utility system on behalf of Utility system EPC contractor Danieli Engineering India Limited. Approval of drawings from owners engineer Centre for Engineering & Technology, Bhilai.
vi. Deepak Steel &Power Ltd, Barbil, Orissa:- Owner’s engineering and detail engineering for project of 2x15Ton & 2x7Ton IF,6x11 Billet Caster, for Mini Steel Plant along with Cogen based Captive Power Plant .Detail design of water treatment system consisting of reverse osmosis based desalination system, detail engineering of effluent treatment system . Project management services to the client including planning, preparation & monitoring of schedule & cost.
vii. Arcvac Forgecast Pvt Ltd, Dankuni,W.B :- Owner’s engineering and detail engineering for project of 20 Ton EAF ,LRF & V.D . Project management services to the client including planning, preparation & monitoring of schedule & cost
Project Engineer
Sep 2003
— Jan 2006