B.E.Mechanical with 17 years experience in O&G,POWER PLANT


Last Updated: 9th May 2018 (over 4 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
Arabic, English, French, Hindi

Summary

TRUE KNOWLEDGE (CURRICULAM VITAE)
B. E. (Mechanical) with 18 Years Experience in same Field

KHUSHI RAM SWAMI
Mob. +91 9466024102(India).
E-mail. ram_khusi@yahoo.com , pwnswm@gmail.com
Passport Details:-
Passport No. K-9473514 (New Delhi), Validity: - 13 Feb. 2023.

Carrier Abstract:-
More than 18 years experience working in Oil & Gas Industry for myself as an Independent Pumper Including Production of Oil and Gas, Water/Polymer Flood facilities Operation, and Chemical waste disposal with EPA compliance standards. Trained in H2S Rescue Including Rescue or Work pack Training, Hydro-Carbon Fire Control , CPR, Cathodic Protection operations, Gas plant Operations, Managed Safety Meetings and Teams .

Professional Snapshot:-
• Compiled data including GIS, API, RRC, TCEQ, and BLM, for entry into E-Trakit, Laser-Fische, Excel, and Outlook .
• Inspected Well Locations From entry gate to Bore site , including Well tree, piping, tanks, compressors, and any other equipment on site such as , Vessels, scrubbers, secondary containment, ect……
• Permitted platting, pre-drilling, Hi-Pressure Pumping/ Fracing, completion, production, and final plugging.
• My duties were to inspect with the best of my ability to insure safety for our community, keep a high standard of awareness on the Environmental Respect, and interact with all entities of government, Federal, State, and County, to insure the welfare of our citizens.

Current Organization.

M/s. PIUL LTD
Designation: - Commissioning Lead .
Duration: - Sept. 2016 to Till Date.
Current Project: - SBF Plant Algeria

Last Career Abstract: -
Organization: - M/s. FLUOR
Designation: - Commissioning Lead with pay roll supply of SEPAM.
Duration: - August 2014 to Sept. 2016.
Current Project: - SADARA PETRO CHEMICAL PROJECT (Saudi Armco)
JUBAIL (KSA).
Responsibility: - Remedial work of chemical piping and commissioning of natural Gas, Benzene, Scalene, Acetylene Etc.

Organization: - M/s. SAMSUNG C&T LTD (SOUTH KOREA).
Designation: - Commissioning Lead with pay roll supply of TCE.
Duration: - Oct. 2011 to July 2014.
Current Project: - SAMSUNG C&T (4000MW Power Plant) Saudi Arabia. Responsibilities: - Erection and commissioning of Super Critical Gas Turbine MS5002 Generator (SIEMENS).

Organization: - M/s. LAS ENGINEERING LTD MUMBAI.
Designation: - Senior Project Manager.
Duration: - July 2008 to Aug. 2011.
Responsibility:_ prepping curb lines, removing damaged curbs, & replacement.
• Responsible for operating maintainer/grader in finish for asphalt repaving.
• Other duties consist of minor equipment maintenance, pot hole patching, landscape replacement, sprinkler repair and other assigned duties.

Organization: - M/S. PUNJ LLYOD LTD.
Designation: - Heavy Equipment Maintenance Manager.
Duration: - Sept. 2005 to June 2008.
Responsibility:-
• Operated multiple equipment; including Track Hoe and Loader, Rubber Tire Back Hoe, Maintainer, Street Sweeper, Platform Lift Truck, Compactor, Blade with Fully Auto Specta Graphics, Laser system, off road dump trucks, and water trucks.
• Over saw start to finish commercial and residential excavation.
• Responsible for ordering trucks and monitoring progress.
• Setup Laser for finish work, blue top parking lots, fire lanes, building pads, including prepared A. C. Calhoun football field for artificial turf.

Organization: - M/S. SAUDI SPIEM COMPANY LIMITED.
Designation: - Sr. Engineer (Mechanical).
Duration: - May 2002 to Sept. 2005.
Responsibilities: - Preparation of Commissioning Method Statement procedure like
Air blowing, Water flushing, Air freeing, N2 purging, chemical cleaning & loading ,steam blowing, Catalyst loading, lube oil flushing, system Dry out, prepare punch list
Operation test procedure, System Mark up P & ID, Test Pack activities.
Preparing and follow up of plans for precommissioning activities like chemical cleaning, degreasing , hydro jetting ,blowing , flushing of lines.
Inspection of vessels , columns , scheduling of installation of trays , demisters and other internals.
Preparing and updating Precommissioning & Commissioning operating procedures, check sheets, manuals ,Marked-up P & IDs, certificates etc.
Preparing and up-dating test pack priority list , follow up with construction sub client for about it, clearing punch items with clients , sub contractors, vendors , other construction departments.
Ensuring Standard Operating Procedures are being followed during the start up of all major equipments.
• Major Equipments : Claus Air Blower, Reaction Furnace , Claus and CBA reactors, HP and LP steam generators, Steam Ejectors, Incinerators, Absorber , Regenerator, Pump.

Start Organization: - M/S. L & T POWER LTD.
Organization Profile: - An associate company in execution of EPC Contractor in Power Project.
Designation: Site Engineer.
Duration: - Jan. 2000 to May 2002.
Responsibilities: - SIEMENS 220 MW turbine with Bio-Mass TPP and
ATLAS COPCO Compressor, BENTLY NEVEDA vibration monitoring system.
BOP systems commissioned with METSO-DCMS system
Inlet air filters system.

Commissioned Role and Responsibility:-
Provided support for pumps, compressors, steam and gas turbine driven machinery trains up to 18,000 HP.
• Identify and solve root cause of noise and vibration issues
• Perform dynamic testing and data analysis
• Perform natural frequency testing for products
• Set up and implement right testing for several types of issues
• Optimize product design collaborating with cross-functional team
• Use specification limits and tolerance level of products during testing
• Walk down of responsible area with client and EPC field pre-commissioning activities including planning, communicating, assigning activities, tracking progress, intervening and escalating Issues.
• Preparation of master punch Points and class wise A, B, C punch list
• Preparation of flow diagram and sketch of pre-commissioning
• Evaluation of related equipments and plants
• Inspection of ECC and handover of CCC with close punches
• Provide field support during pre-commissioning, commissioning, and startup of new facilities including field EH&S observations and Interventions during Construction and pre-commissioning.
• Lead and coordinate reviews of preliminary and final version of all C&SU material to ensure technical accuracy.
Equipments Breakdown/Maintenance Handled:
Pumps:
 Single and Multistage centrifugal pumps with different material of construction.
 Positive displacement pumps(plunger, Gear, Screw, Lobe and Diaphragm pumps)
 High pressure Boiler feed water pumps and fuel injection pumps
 Axial flow propeller pumps, Vertical turbine type pumps
 Make: SULZER, GOULDS, KSB, BAYRON JACKSON, EBARA, LAWRANCE, and IR.

Compressors:
 Single and Multistage centrifugal compressors Horizontal and Vertical split(Barrel type) compressors(Make: ELLIOTT, MITSUBISHI INGERSOLL RAND, HITACHI, DOMAGK, NUOVOPIGNONE,)
 Axial flow centrifugal compressors (Make: SIEMENS Used in 135MW Gas turbines)
 Screw and Lobe Compressors (Ingersoll rand HOW DEN, ATLAS CAPOS)
 Reciprocating compressors (JOY, KHOSHALA CRIPPLE, CHICAGO PNEUMATICS)
Turbines:
 Steam turbines single and multistage Condensing, Extraction, and Back pressures steam turbines with different types of Governing system (Make: MURRAY, ELLIOTT, SHANGHAI TURBINE WORKS, WORTHINGTON, TERRY, )
 Gas turbines capacity 135MW ( SIEMENS, VOITH ,GE & Centaur 40 Solar gas turbine)
Gas & Diesel Engine:
 Hourly Based Maintenance of Gas engines - ET, DDS Tools used for Periodical testing and Overhauling Depend upon the Hours, (Make: Caterpillar, Waukesha, GMWA –Cooper Bessemer)
 Hourly Based Maintenance of Diesel Engine – Overhauling the Engine. Time Based Maintenance.(Make: Caterpillar, Kirloskar, Cummins, Leyland)
Centrifuges, Blowers and Fans:
 ID and FD fans, FD and ID Fin fans, Cooling tower fans and Lobe Blowers
 Pusher, Basket and Horizontal split Screw type centrifuges (SULZER)
Other Rotating Equipments and Alignments
 Top and Bottom entry Agitators mounted in High pr Reactors, tanks, crystallizers
 Gear Drives (Spur, Helical, Double helical, Worm and Spiral Bevel type Gears). Conveyors (Belt, Screw and Chain conveyors) .
 Rim and Face, Reverse dial Graphical & Analytical method and laser alignment.
Condition Monitoring and Vibration analysis:
 Vibration data collection and analysis with IRD 880, CSI – 2130, Adash DDS 2000, Entek IRD Odyssey Software
 DP and UT test to find cracks in Mechanical parts and welding joints
 Thickness measurement of Pipe lines and Vessels with Ultrasonic thickness Gauge

Other fields Cooperation Duties:-
1. Responsible for preparing scope of work, Material identification, Work allotment, Maintaining, Maintaining target for production & Preparation of MTO.
2. Identifies Inspection requirement and organizes for stage inspection as required.
3. Preparing daily progress report and forward to planning department & Organizes Material and equipments for upcoming jobs in advance.
4. Responsible for maintaining the fabrication crew to achieve the required target as per the required specification.
5. Supporting in fabrication & erection of Oil & Gas Pipeline of Material Class -Carbon Steel, Alloy Steel. Stainless Steel and GRP, GRE lines.
6. Responsible for Coordination with client, raising site Queries to implement revision & to assist in improving productivity, advising priorities based on Material availability.
7. Broad knowledge of waste water and sea water cooling operational processes and theory and understanding of sea water cooling plant optimization techniques.
8. Turbine trip logic for lube oil system, trip oil system, Lube oil system Commissioning
9. Excellent knowledge of technical developments in the field of sea water cooling treatment plant and equipment & preventative maintenance theory and techniques.

Scholastics:-
1. 12th (Non-Medical) from H.B.S.E. Bhiwani.
2. B.E. (Mechanical) from I.M.E. Mumbai.
3. NDE Certificate of Level 2nd from Mumbai.

Trainings Attended: -
1. Attended 15 days training on CNC from NTTF Bangalore
2. Attended Basic Hydraulics training from REXROTH .
3. Attended 15 days training on PCB Fabrication from NTTF Bangalore.

Computer Knowledge:
Elementary knowledge of internet & networking.
Basic, MS Word, office, hardware.
Operating System: Windows XP/NT/2000/VISTA/WINDOW 7.

Personal Details: -
Fathers Name: - Mr Purshotam Dass
Date of Birth: - 31-07-1974
Drawn Salary: - 8100 USD per month
Expected Salary: - 9000 USD per month
Joining Period: - 25 Days.
Home address. H.NO.438/31, Qutubpur, Rewari-123401
(Haryana) India.

Education

IME MUMBAI
B.E. MECHANICAL

   Sep 1992
— Sep 1996

I have passed out in B.E. Mechanical Degree in the year September 1996 .

Experience

PETROFAC INTERNATIONAL UAE LTD
Commissioning Lead

   Aug 2017
— Current

Pre-Commissioning and Commissioning of SBF Plant