M&E Manager


Last Updated: 5th March 2019 (over 3 years ago)

Address
Malaysia

E-mail
Locked

Phone Number
Locked

Gender
Female

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Malay

Summary

• Over 16 years of experience in the Consultancy and Construction industries. Lead Auditor/Auditor ISO9001. Project Management Office, Project Audit, Project Document Management
• Background in Project Management and Technical Aspects of Construction Industry gained through active exposure to a diverse range of Construction and Management functions.
• Knowledge of the regulatory international codes and standards, i.e. IPC: International Plumbing Code, BS: British Standards, NFPA: National Fire Protection Association, ASME, ASTM
• Client / Owner construction projects within the Power Generation, Transportation which included Double Tracking Project and Mass Rapid Transit (MRT) and Airport; comprises in depth review of all project documents (Method Statements, ITP, Material Submissions, Testing& Commissioning, Operation & Maintenance Manuals, Tender documents and design), P&ID (Process and Instrumentation Diagrams) and the like.

Education

European Centre of Technology
Masters in Renewable Energy

   Jul 2018
— Current

I am currently pursuing this.

University of Hertfordshire
BEng(Hons) Mechanical Engineering

   Sep 1999
— Sep 2001

Experience

PMXPERTZ Sdn Bhd
Project PMO, Project Consultant

   Oct 2017
— Jan 2018

PROJECT: Impression City, Malacca
PMXPERTZ, as an organization, is an effective project management services provider by virtue of the extensive experience and knowledge residing in its individual consultants. With a diverse background in the project environment, encompassing the aspects of People, Process and Technology, consultants demonstrate strength and effectiveness in addressing our clients’ needs.
Project Management, Project Coordination, Site Coordination, Document Control and Vendors Coordination of IT Installations.

United Contracting & Consultants Sdn Bhd
Project Manager

   Oct 2014
— Current

PROJECTS: Anjali @ North Kiara (High Rise Condominium) and Tamarind Square, Cyberjaya (Mixed Development)
Preparation of BQs, tender documentation, site management, purchases, account management, and day to day running of the company. Supply & Apply waterproofing system.

Mudajaya Corporation Berhad
Deputy Manager (M&E-QAQC)

   Nov 2012
— Feb 2014

PROJECT: MRT Package V3 Dataran Sunway to Section 17
Viaducts and Elevated Stations - PROJECT VALUE: USD269 MILLION
• Project Management, Project Site Coordination; Demonstrated all requirements of the Contract and relevant codes, standards and regulations are met.
• Monitored day to day operations of department personnel to guarantee compliance with both client & code specifications.
• Reviewed Inspection and Test Plans (ITP) and Method Statements to ensure all Contract Specification requirements are addressed and adhered by the sub-contractors M&E and C&S
• Reviewed manufacturer’s products and provided recommendation for design and specification purposes
• Evaluated quality and performance as per client specifications.
• Established the Organization Chart of the QA/QC Department (Supervision and Laboratory) and deploy the QA/QC resources, depending on the criticality of the work packages and the budget allowed.
• Conformity of Materials in material submittals to project specification and local authority requirements.
• Comply with ISO 9001:2008, ISO 14001 and OHSAS 18001 works procedures.
• Risk Identification and Action Implementation.
Lead Project Engineers and sub-contractors in day to day of project management, quality management and control and site coordination.

Gamuda Berhad (Doha, Qatar)
Senior Engineer (M&E/QAQC)

   Jul 2008
— Mar 2011

PROJECT: New Doha International Airport (NDIA), Doha, Qatar.
Airfield Paving, Tunnel & Detention Ponds - PROJECT VALUE: USD1 Billion
• Project Management, Project Coordination
• Reviewed Inspection and Test Plans (ITP) and Method Statements to ensure all Contract Specification requirements are addressed and adhered by the sub-contractors.
• Coordinated with the construction team and sub-contractors in the preparation of O&M Manuals, Training Manuals and Testing and Commissioning documents and review of documents.
• Liaised with the construction team of various disciplines, Consultants, Client, and Owner’s Engineers
• Managed all M&E inspections and preliminary tests at 2 tunnels, 3 detention ponds, airfield ground lighting AGL and substations.
• Witnessed and inspected on-site and off-site testing of equipment and materials (Factory Acceptance Tests.

Minconsult Sdn. Bhd
Senior Mechanical Engineer

   Mar 2002
— Jun 2008

PROJECTS:
Electrified Double Track Project, Malaysia.
(Ipoh to Bidor Package)
A national linear project of 68km between Rawang and Ipoh, involving construction of dual 160km/hr tracks, yards, and freight/passenger stations.
PROJECT VALUE: RM2.6 BILLION
Resident Project Engineer (April 2002 to January 2006)
• Project activities included all M&E and underground utility relocations/inspections, signaling, communication, train protection systems, earthing system and review of documentation for claims and progress monitoring purposes.
• Managed all activities and liaisons for the development of the project including quantity estimation and works certification for contractual payments, testing/commissioning and as-built preparations.
• Site Project Coordination, Project Management; Managed on-site design change submissions.
• Supported and liaised with the Measurement Engineers/Quantity Surveyors (QS) for variation of design to suite site condition.

Teluk Salut Combined Cycle Power Station Conversion Project.
Kota Kinabalu Industrial Park, Sabah.
(190 MW 2x2:2:1 Combined Cycle Conversion Project)
PROJECT VALUE: rm286 Million
Site Mechanical Engineer (March 2006 to March 2007)
• Included design review and overseeing of EPC installations. The project consisted of 2 x MHI Steam Turbine Generators, 4 x Heat Recovery Steam Generators, Generator and Auxiliary Transformers, Deaerator and 2 x Air Cooled Condenser Units.
• Owner’s Engineer; Observed and witnessed the installation of all rotation equipment inclusive of Steam Turbine Generator including all alignment procedures and installation of transformers.
• Reviewed of all submittals; shop drawings, material submittals, ITPs, material samples, design calculation, with regards to compliance with the Contract requirements.
• Project Management, Project Coordination; Involved with both Client and EPC to evaluate progress and critical path analysis.
• Reviewed P&ID drawings, isometric drawings of piping, M&E etc., Single Line Drawings of electrical, controls and instrumentation, As-Built drawings.

Tuanku Jaafar Power Station, Port Dickson Rehabilitation Project – Phase 2
Senior Mechanical Engineer
(750MW COMBINED CYCLE REHABILITATION PROJECT)
Lead a team of four (4) to study the fit-out and refurbishment of the Fire Fighting and Protection Service in a coal fired power plant as well as to prepare the preliminary BQ.
• Prepared specifications and contract documents and reviewed Fire Detection & Protection System drawings & documents for local authority submissions.
• Evaluated contract prequalification and tender submissions.
Preparation of the Fire Safety Design Philosophy report for the purpose of local authority submission.

Ad
Ad
Ad