SENIOR INSTRUMENTATION ENGINEER‏


Last Updated: 19th August 2018 (over 4 years ago)

Address
Abu Dhabi UAE, United Arab Emirates

E-mail
Locked

Qualification Level
Degree

Languages
English

Summary

10+ years’ experience. I need to get attached to an organization, which guarantees me the potential for significant professional, career growth and ensures commercial success. Apart from that a friendly & conducive workplace environment would be appreciable.

Education

Mehran University of Engineering & Technology Jamshoro Pakistan
Bachelors in Electronics Engineering (04 Years)

   Jul 2001
— Sep 2005

Experience

McConnell Dowell (ME) LLC. - Abu Dhabi, U.A.E (Multinational EPC Company)
Lead Electrical & Instrumentation Engineer (ADCO Approved)

   May 2014
— Current

Electrical & Instrumentation Engineer (ADCO Approved) at EPC, ADCO Habshan Project , Abu Dhabi, UAE under ADCO. ADCO, part of the Abu Dhabi National Oil Company ADNOC, group of companies, is one of the top ten oil producing companies in the world. McConnell Dowell has been charged with the EPC works.

Job Responsibilities:

EPC (Engineering, Procurement & Construction) of ADCO Water Injection Well, Oil Producer Well (Single/Dual) & ESP Well.
• Engineering drawings & document preparation review & asbuilting.
• Supervision of construction activities.
• Preparation of Loop check & Functional test folders.
• Supervision of Calibration, Loop check & Functional test of Turbine Flow Analyzer(Cameron),Electromagnetic Flow Transmitter (Emerson),Well Head Control Panel(Sulaiman Petrotech/Proserv/Petronash) & Solar Panels (Sola Pak).
• Coordination of commissioning activities & line up of instruments.
• Maintenance of all instruments after hand over to client if required.
• Coordinating vendor activities of product vendors of Solar Panel, Transmitters etc.
• Mounting , Calibration & final commissioning of Pressure Transmitters , Temperature Transmitters, Flame Detectors, Toxics Gas Detectors, Gas Alarm Beacons, Gas Alarm Sounders, Fire Alarm Beacons, Fire Alarm Sounders, Manual Call Points, Well Head Control Panel(Halliburton, Sulaiman Petrotech/Proserv/Petronash),Limit switches For SSV, Pressure Gauges, Temperature Gauges.
• Installation and commissioning of Distributed Temperature Sensing(DTS) system for water
Injection well monitoring.
• Installation. Testing and commissioning of WHCP (Petronash, Proserv and Sulaiman Petrotech).
• Installation. Testing and commissioning of chemical injection skid pump motors for ESP oil
Well.
• Installation. Testing and commissioning of Electrical Submersible pump in presence of ADCO
Maintenance and vendor.
• Installation. Testing and Pre-commissioning/Commissioning of Pre-Packed Sacrificial Magnesium Anodes for Buried underground crossings.
• Installation and commissioning of V-monitor RTU Panel for ESP oil well, worked with Siemens & ADCO Engineers to configure all field signals.
• To discuss / attend meetings with ADCO PMC team to clear ambiguities & project progress
Reports.
• Expediting of all actions relevant to material delivery (comment vendor schedules, close Progress follow-up…..
• Attended FAT for Electrical, Instrumentation, Cathodic Protection Packages.
• Review Functional Logical Diagrams, Cause & Effect Diagrams, Instrument Location Plan, Cable routing layouts, Materials requisition, Bid evaluation, Purchase requisitions and approval vendor documents.
• Monitor and Control of Engineering Man hours.
• Review deviations and change orders and forward Engineering observations to Project Engineering Manager.

PUNJ LLOYD LTD. – Abu Dhabi, U.A.E (Leading Multinational EPC Contractor)
Electrical & Instrumentation Engineer (ADCO Approved)

   Dec 2011
— Mar 2014

Electrical & Instrumentation Engineer (ADCO Approved) at EPC, TIE-IN project, Abu Dhabi, UAE under ADCO. ADCO, part of the Abu Dhabi National Oil Company ADNOC, group of companies, is one of the top ten oil producing companies in the world.Punjlloyd has been charged with the EPC works ($197 million USD) on 750 KM of flow lines at SAS and 160 Well Heads at three onshore oil fields(Shah,Asab,Sahil).

Job Responsibilities:

• To Plan / schedule and Execute the job of Trench Excavation ,Cable Lying , cable testing (33KV) XLPE Power Cable including execution, Inspection & Supervision of high voltage underground cable as per drawings & ADCO Standards.
• Installation. Testing and commissioning of chemical injection skid pump motors.
• Install earthing network near power skid and ESP wellhead area.
• Mounting & Testing Local Control Panel, Instrument, Electrical & Fire & Gas Junction boxes as per ADCO Standards.
• Installation, Termination & testing the Control / Instrument & Fire & Gas Cables loops.
• Mounting , Calibration & final commissioning of Pressure Transmitters , Temperature Transmitters, Flame Detectors, Toxics Gas Detectors, Gas Alarm Beacons, Gas Alarm Sounders, Fire Alarm Beacons, Fire Alarm Sounders, Manual Call Points, Well Head Control Panel(Halliburton),Limit switches For SSV, Pressure Gauges, Temperature Gauges.
• Tubing connection from chemical Injection skid to ESP Well downstream flow line.
• Installation and commissioning of Siemens (S7-300) RTU Panel, worked with Siemens & ADCO Engineers to configure all field signals.
• Attend weekly meetings with ADCO shah (I/C & Electrical) maintenance engineer to clear ambiguities & site progress reports.
• To discuss / attend meetings with ADCO PMC team to clear ambiguities & project progress reports.
• Perform close monitoring and review of all the drawings and instruct the design team to make proper changes in the drawings which are not complying with the ADCO standards.
• Review drawings and documents and assure that all documents and drawings comply with ADCO standards and specifications.
• To follow and review “Quotations" packages with procurement department.
• Be fully aware of the contract, scope of work, budget and schedule for the assigned project.
• Choose the vendors in accordance with procurement manager, engineering manager and project manager.
• Study of the offers received and clarification with vendors.
• Expediting of all actions relevant to documentation (Engineering deliverable, vendors’’ manual...)
• Expediting of all actions relevant to material delivery (comment vendor schedules, close progress follow-up….)
• Performs all relevant loop checks and Updates as built drawings.
• To ensure Review/Validate redlines, as-built, Electrical, Instrumentation & F&G documentation is completed and submitted.
• Tray work, instrument installation, glanding & termination, RTU panel glanding, JB glanding, Field Instrument Glanding, conduit work, cable lying, branch cable & main cable control to field JB to instrument.
• To mobilize/guide/train Instrument & Electrical foreman, technicians & Electricians to their respective jobs.
• To supervise site engineers and reporting to Project manager.
• Implementation of Project Quality Plan and Procedure for the inspection of the installation and testing of instrument.
• Issues the relevant Quality Records and when necessary, writes and sends to QC supervisor Non-conformances reports (NCR’s).

M.R Al-Khathlan Co. K.S.A (Leading EPC Contractor)
Instrument & Control Engineer/QC Inspector Instrument (Satorp Approved)

   Jan 2010
— Oct 2011

Project for SATORP (Saudi Aramco Total Refining and Petrochemical Company) Jubail Export Refinery Package 5C

EPC (Engineering, Procurement & Construction) project for the auxiliary utilities package of the new grass root Jubail Export Refinery (JER) being built by Saudi Aramco and Total (France) at the Jubail Industrial City 2.

Job Responsibilities:

• Installation & commissioning of Switch Racks and pump motors.
• To Plan / schedule and Execute the job of Trench Excavation, Cable Lying, cable testing & termination as per drawings & Satorp Standards.
• Mounting & Testing Local Control Panels, Instrument Junction boxes as per Satorp Standards.
• Installation, Termination & testing the Control / Instrument cables loop.
• Mounting, Calibration & final commissioning of Level Transmitters, GWR Transmitters, Level Indicators, Flow switches, Pressure Transmitters, Temperature Transmitters, Pressure Gauges, Control Valve, on-off valve, Safety Valve and analyser.
• Installation and commissioning of Fire Alarm Control Panel (FACP-Siemens).
• To discuss / attend meetings with Satorp PMT team, vendors, design consultant (CZFP) to clear ambiguities & project progress reports.
• To mobilize/guide/train Instrument foreman, technicians to their respective jobs.
• Review drawings and documents and assure that all documents and drawings comply with JER Engineering standards and specifications.
• Review MR packages to assure the implementation of JER Engineering Standards and specifications.
• To follow and review “Quotations" packages with procurement department.
• To supervise site engineers and reporting to construction manager.
• Be fully aware of the contract, scope of work, budget and schedule for the assigned project.
• To oversee critical equipment installation and to coordinate and arrange appropriate documentation / specialist vendor assistance as required.
• To ensure redlines, as-built, Operation and maintenance documentation and to the project completion documentation is completed and submitted.
• Perform close monitoring and review of all the drawings and instruct the design team to make proper changes in the drawings which are not complying with the SATORP standards.
• Shall have to review all submittal packages related to design in order to ensure that all the requirements of SATORP are incorporated in the packages.

Dewan Cement Ltd (Dewan Mushtaq Group Pakistan)
Assistant Manager E & I

   Oct 2006
— Jan 2010

Job Responsibilities:

• Re-Vamping of Cement Mill Line-1 from Relay Control Logic to PLC (Siemens PCS7) From IO Listing to Signal Testing and now plant running successfully, worked with Siemens Engineers as a Project Engineer.
• Carry out safe and smooth Plant Operations.
• Coordinate between process and maintenance (Electrical, Instrumentation & Mechanical) for rectifying day to day plant problems.
• Ensuring timely completion of jobs to minimize production losses.
• Responsible for PLC system for Operational Plant (Siemens PCS7).
• Calibration of Fan Dampers
• Shut Down Maintenance Jobs
• Daily Instrument & Electrical Inspection.
• Worked on Thermocouple, RTDs,Temperature Controller and indicator, Temperature Guages, Electrovalve, Level Sensor and Controller, Flow Switch, Speed Control Sensor, Proximity Sensor, Limit Switches, Belt Scale (Hasler) and Gas Analyzer (Siemens,ABB).
• Responsible to Weekly Preventive & Corrective maintenance of Instruments.

S.G.Fiber Ltd Pakistan
Trainee Engineer Instrument

   Jul 2005
— Aug 2006

Job Responsibilities:

• Responsible Pre-Commissioning phase of the project covering installation, termination, Meggering, continuity and calibration of pressure transmitter, pressure switch, temperature switch, level indicator, I/P, RTD, TE, monitoring the preparation of instrument calibration.
• Inspection of field instrument installation, cable meggering & continuity check, instrument component installation inspection and final commissioning of inst. DCS system. Loop from filed instruments to main console monitoring system, functional testing of all loop, including fire & Gas.

Ad
Ad
Ad