Summary

KANDASAMY.M
Mobile: +91-9487217564,+91-9841528364 / E-Mail:kanda_071186@yahoo.co.in
________________________________________
SENIOR ELECTRICAL ENGINEER – OIL AND GAS
________________________________________
An astute professional Electrical Engineer approved by Kuwait National Petroleum Corporation and Qatar Refinery with around 11 years of total experience. Experience involved in the field of EPC Project Execution, Installations, Testing of Substation and Electrical Equipment’s in all types of Power Systems from 400V to 400KV in Offshore and Onshore Oil and Gas Industries.
 Madina Group W.L.L. – Qatar. Feb 2018.
In Client side: QP – Qatar Petroleum Refinery Turnaround.

Responsibility:
• Functions test for all Protective Relays of Incoming, MCC and Distribution feeder and Faulty Replacements
• Complete functions test and Maintenance of all HV Switchgear and Transformers.
• Installing ATS Scheme in HV Side of all Substation.
• Installation of ELRelay and Modification work in LV,MCC side.
• Complete Motor Overhauling, Maintenance and Faulty parts replacements
• Co-ordinations with Commissioning Team to ensure safety and Completion of Testing and Commissioning of Substation.

 Integral Services CO. W.L.L. – Kuwait. Sep 2015 – March 2017.
Client : KNPC - Clean Fuel Project. Senior Electrical Engineer.

Responsibility:
• Erection of 132/11KV MAIN DISTRIBUTION SUBSTATION – 1,2,3.
• Erection of Power Transformers,11KV ABB Incomer and feeder panels, Control Relay panel,LT and MCC panels,UPS system, Battery Bank and other equipments involved in Substation.
• HT,LT & Control Cable laying, Jointing with proper cable tag and Terminations as per Standards.
• Installation of Cable Trays, Lightening, Earth pits installation, Earth bar laying & Earth cable Lying & Welding, Connections to all panels/equipment with IFC electrical drawings.
• Co-ordinations with Commissioning Team to ensure safety and Completion of Testing and Commissioning of Substation.
• Complete Substation work activities are dealed with proper Safety and Quality as per KNPC Standards.

 Rukan Al Yakeen International L.L.C. – Oman. June2014 -March2015.

Client: MZEC,MEDC Electrical Engineer - Responsibility:
• Erection of Transformers 3*20 MVA,33KV control Relay panel,11KV feeder panels, Battery Bank, Ring Main Unit(RMU), OLU.
• Erection of 33 KV GIS substation equipments such as CB, CT, VT, Bus Riser, LVAC panel with Earthing, Lightning arrester, C&R panel, SCADA panel.
• Cable laying as per OES Standards which involves Thrust boring, Concrete Ducts, Stone Pitching work.
• Installation of Lightening, Earth pits installation, Earth bar laying & Earth cable Lying & Welding, Connections to all panels/equipment as per AFC electrical drawings.
• Termination and laying of cables with proper tagging with cable schedule copy and proper glanding as per OES Standards.
• Installation of the outdoor and indoor lightings and its associated junction boxes, switch boards at the Power Stations control Buildings.
• Installation and Erection of Lighting poles and its termination works and proper cable trays installation in control Buildings, Cable Cellar area, Field area in Power Station.
• Involved in testing of IR-Insulation Resistance of all power cables, control cable, LV/HV switchgear Bus Bar with a 1-min. Test.

 Almeer Technical Services Co W.L.L - Kuwait. April 2012 – April 2014.

Up gradation of Obsolete Fire Detection,Alarm And Suppression System at KNPC MAA Site Including the Phase-Out of Halon System – Electrical Engineer.
• Installation of new Fire Alarm and Detection System which is analogue addressable with Work Station, Event printer and a main Graphic VDU display panel located in the Central Control rooms and the Refinery Fire Station.
• To integrate the existing fire alarm panels with the new system supplied.
• To provide all necessary components related to Fire alarm supervisory System such as: Master Fire Alarm panels, Slave Fire Alarm panels, smoke/ heat detectors, MAC’s, Sounders, and Workstations, and also to integrate them in order to make them fully functional.
• The Fire Protection Systems needs to replaced or repaired in the areas of: Floating Roof tanks, Compressor Units, Pumps in Hydrocarbon Service, Central Control Rooms, Local Control Rooms, Main sub-stations, Sub-stations (conventional type), packaged sub-stations (modular type), Battery rooms, Process areas.
• Installation of Master Fire Alarm Panel, Slave Fire Alarm Panel, Aspirating High Sensitivity Smoke Detection Panel, Gas Suppression Panel.
• MFAP is addressable type and located at the Fire Station. Alarm signals and fault conditions from the field shall be collated within the Master Fire Alarm Panel from the particular Slave Fire Alarm Panel. All product Tanks, Main Substations, Buildings and need to be incorporated in the Master Alarm Fire Panel.
• One PC Work station is provided in the Fire Station. Signals from Master and Slave Panels shall be repeated on a Repeater Panel located at the Control Room.
• Installation of ELR box, Zone box, LHD post, Manual Call Point, Junction boxes around the Floating Roof Tanks.
• Installation of Conventional devices like Smoke/Heat Detector, Flammable Gas Detectors, I/O module for Fault Isolator Module & Bell Sounder in the Substation, Satellite Input House (SIH), Buildings.
• Installation of conduits and required supports for the supply cable to the Conventional devices like all detectors, MAC.
• Excavation and cable layingas per KNPC Standards.

 ENMAS O & M Services Pvt Ltd – Chennai, Tamilnadu.
Client: Adhunik Metalliks Ltd – Orissa

Installation & Maintenance Engineer – July 2009 – March 2012.
Responsibility:
To keep plant synchronized with the Grid and maintenance of 132KV substation equipment’s like Power Transformer, HT& LT Switch gear panels, HT& LT motors, all protection relays, all type of electrical trouble shooting. To maintain plant in running and healthy conditions.
Preventive maintenance of Power Transformer checking like Oil Status, WindingTemperature and Oil temperature has been maintained.
Motor Change over, Trouble shooting of HT Motors like MCW, BFP, ACW and LT Motors change over and preventive maintenance schedule work.
DG preventive maintenance, Plant load factor, Turbine steam Consumption, Day to day Operation and Maintenance activities in Power plant are the responsibilities.
 Voltech Engineers Pvt Ltd – Chennai, Tamilnadu.

Testing Engineer – May 2007 To June 2009.
Responsibility:
• Project Execution, Operation and Maintenance of Power Plant, Oil and Gas industries Sub-station Electrical equipment’s.
• Testing and Commissioning of all Electrical equipment from 440 volts to 400KV Power System.
• Testing of CT, PT, Circuit Breaker, Switch Gear and Power Transformer.
• Inspection of Control and Relay panel, preparation of Test Report and Cable schedule for Sub-station, Power plant, and Process plant.
• Testing and Commissioning of Control & Relay Panel for Transformer, Bus Coupler, Bus-Transfer, and Line feeder.
• Testing and Commissioning of Power control center and Motor control center.
• Experience with Relays- Over current and Earth fault relays.
• Testing of Protective Relays for various needs.
• Knowledge of Transformer Protection, Transformer Differential Protection & REF Protection, Bus Bar Protection, Motor Protection, and Synchronizing scheme.
• Trouble shooting of all Electrical circuits, Control and Protection circuits.
• Co-ordination with client in As Built Scheme drawing submission, test report submission.
• As build cable schedule submission and all site activity to satisfy the customer
over all substation maintenance.

Client: IOCL – Indian Oil Corporation Limited – Panipet.
Testing and Commissioning of all Electrical equipment’s present in Substation of 110KV includes HT & LT Switchgear panels, Power Transformer, HT & LT Motors, Cable – HT & LT, BusBar and all types of Numerical relays and Electromagnetic Relays present in the panels. CT, PT, Circuit Breaker present in the Switch Yard. Test reports preparing as per Client requirement.

Client: Ultratech Cement Limited – Bukka (A.P).
Involved in the Testing and Commissioning of Substation capacity of 210KV and Synchronization of Power Plant. Cable schedule undertaken and cable testing, Switch Gear breaker and Power transformer testing done.HT motors like BFP, ID, MCW and ACW MOTOR testing and to keep plant in running conditions and Control relay panel and Capacitor bank testing also made.

ACADEMIC CHRONICLE:
Technical Qualification :
Completed B.E – Electrical and Electronics Engineer from Raja Lakshmi Engineering College at Chennai in 2007 with First Class under Anna University Tamilnadu.
SYSTEM EXPOSURE:
• Operating System – Microsoft Windows.
• Productivity Tools – Microsoft Office2003, 2007, 2010.

PERSONAL DETAILS:
Passport Number : Z4110859.
Date of Birth : Nov 1986.
Father’s Name : K. Mookkandi.
Permanent Address : 10, Vaiyapuri Nagar, Tirunelveli, Tamilnadu.
Linguistic Abilities : English, Tamil, Hindi and Malayalam.
Sex : Male.
Marital Status : Married.
Nationality : Indian.

DECLARATION:
I hereby declare that all the information Furnished above is true and correct to the best of my knowledge.

Date: Yours Truly,
Place: KANDASAMY.

Education

ANNA UNIVERSITY
BE - EEE

   Jul 2003
— Apr 2007

Experience

isco -kuwait
SENIOR ELECTRICAL ENGINEER

   Sep 2015
— Mar 2017

• Erection of 132/11KV MAIN DISTRIBUTION SUBSTATION – 1,2,3.
• Erection of Power Transformers,11KV ABB Incomer and feeder panels, Control Relay panel,LT and MCC panels,UPS system, Battery Bank and other equipments involved in Substation.
• HT,LT & Control Cable laying, Jointing with proper cable tag and Terminations as per Standards.
• Installation of Cable Trays, Lightening, Earth pits installation, Earth bar laying & Earth cable Lying & Welding, Connections to all panels/equipment with IFC electrical drawings