Summary

Professional Associations:

1) Organization : Joint Venture of SEC(Saudi Electricity Company) & Worley
Parsons via GTC
Riyadh, Kingdom of Saudi Arabia
Designation : Electrical Engineer (Consultant) at EHV Projects
Duration : June 2017 to Still
Location : 1800 MW Combined Cycle Power Plant & Associated
9040 BSP – 380 kV Substation, Dhurma, Riyadh
Duties and Responsibilities:
3 x 502 MVA, 380/132/13.8kV GIS Substation with 30 Bays of 380kV and 24 Bays of 132kV with associated systems.
2 feeders from STG (Steam Turbine Generator) – Power plant side (step up transformers 18/380 kV)
3 feeders from GTG ( Gas Turbine Generator) – Power Plant side (step up transformers 18/380 kV)

 Carried out the Site Supervision/Inspection, for Erection and commissioning of all the GIS Associated equipments/Structures of the following major equipments/systems. Coordination with all the teams such as design, testing and project planning group within the company. Attending Progress review meeting with contractors and preparation of progress report.

1. 380 kV & 132 kV GIS Switchgear of HHI Korea Make.
2. 380 kV & 132 kV GIB with SF6/Air Bushing.
3. Power Transformer (Super Grid Transformers) 502 MVA - 3 Nos. 380/132/13.8 kV ONAN Auto Transformer make ABB Sweden.
4. Auxiliary Transformer 2 MVA- 13.8 kV/400 V
5. LCC, Control Relay Panel, Bus bar Protection, SCADA, SOE, Annunciation, Fault Recorder etc.
6. AC/DC Auxiliary Power supply systems.
7. Earthing Systems.
8. Gantry, 132kV Power Cable, 13.8 kV MV cabling work.
9. Medium Voltage Switch Gear 13.8 kV of Wescosa Make.

 Carry out the Execution, witness for all the pre-commissioning checks and testing done by the main contractor testing and commissioning team as under:

1. Transformer stability (Leakage Under Pressure).
2. All Equipment site Tests such as power Transformer, Auxiliary Transformer, CTs, VTs, GIS Switch Gear, CVT, SA, AC/DC Auxiliary system.
3. Primary Injection and secondary Injection Test for CT’s and VT’s.
4. Material Inspection like Circuit Breaker, Control, Protection & Relay panels, Cable Tray, Control Cables, Power Cables, Structures etc.
5. High Voltage Test for 110 kV and 13.8 kV Power Cables and Switchgear.
 As a EPCM consultant, attend the Inspection i.e., RMI & RFI as per contractor’s request.
 Witnessed for Installation of RTCC panels, AMR / AMI & DCU panels, 125 V DC Batteries & Chargers (back up for S/S), laying of earthing conductor, earthing risers, Shunt Reactor, AC/DC panels as well as AC/DC lighting i.e., outdoor lighting, boundary wall lighting, transformer firewall lighting, link boxes with SVL & without SVL’s and laying of electrical cables 500 sqmm, 630 sqmm & upto 2000 sqmm, 502 MVA transformers(380/132/13.8 kV), Surge arrestors, surge counters, outdoor & indoor receptacles (32A,63A & 125A), DC inverters for SAS systems, AC/DC push buttons, 220 V socket outlets, RMT panels.
 Making Punch list against the incomplete works.
 Resolve the Technical Queries according to the site requirement.
 Provide the solutions to the contractors If there is any Engineering discrepancies in approved drawings.
 Assure the quality standards as per SEC Project Specification.
 Ensure the quality process at site & maintain the QMS in compliance with ISO 9001 & related SEC standards.
 Supervising & Coordinating with CSD for the commissioning activities.
 Supervising the fire installation / commissioning activities of firefighting, Smoke detector, Modules, FACP panels.
 Checking the HVAC ducting, Panels & installation as per drawing along with contractor’s RFI.
 Review the packages for contractors internal RFI’s & conducting the final walkdown according to submitted packages.
 Approving the packages / Submittals with code 1 ,2 , 3 & 4
 Using the ENCOMPASS to get the documents / drawings to review / approval.
 Using the BLUEBAM software for Contractor’s submittals review / approval / comments.
 As per SPL (Sas Points List) , collecting / confirming the all signals from firefighting, Fire Alarm, Genaral Alarms & HVAC to annunciator panels.
 Knowledge of Fire Fighting, Fire Sprinkles, Fire Alarm, FM200, Smoke Detector.
 Close follow up with Substation Automation System for open loop / Close loop with Measurement, Alarm, Signals & Command.
 Issuing the NCR / SITE NOTE if the contractors violating the PTS.
 Monitoring Three weekly schedule according to initial project planning schedule in case of any deviation found then preparing the recovery planning schedule with contractor to go with proper initial project schedule in order to avoid closing the project delay or energisation .
 Monitor the work performance to ensure the respect of works standards & project quality specifications.
 Keep records & make corrections in Installation drawings if it is deviated from the approved drawings.
 Follow up the pending items / Snag list during the testing stage and make sure that substation will be energized without snags / pending items.
 Holding SEC(Saudi Electricity Company) ID to enter live substations.
 In charge of Remote end substation Power Plant 12 through U/G cable(9035) & 2 loop in / loop out feeders through OHTL (9034 & 9013 BSP’s) to upgrade and provide new protection panels to the existing bays under shut down condition.

2) Organization : SEC(Saudi Electricity Company) via SEGI
Jeddah, Kingdom of Saudi Arabia
Designation : Electrical Engineer (Consultant) at 380/110 kV S/S
Duration : Oct 2013 to May 2017
Duties and Responsibility:
1. Worked as Project Engineer & Duties & Responsibilities are as follows,
 Registering the weekly routine Jobs & shutdown into SAP system with the co-ordination of Contractors .
 Follow up with WRCC (western Region Control Centre) / Maintenance to get the approval of routine jobs & Shutdowns in time.
 Review the Submittals from the contractor i.e, FAT report etc.
 Issuing the shipment release after approving the Transmittal submittals.
 Attending weekly meetings with contractor in order to close the punch list.
 Be a member of Projects closing committee for final handing over the projects & register the routine jobs i.e., MODON 380 kV BSP, Namerah North BSP, Jeddah North East (King Abdul Aziz International Airport ) BSP, Al-Lith BSP,Makkah Central BSP, Taif SISED BSP, Shoaibah-3 380 kV BSP, HHR 1 – 6 (Haramain Highspeed Railway) Projects, Bisha 380 kV BSP.
 Assign my Colleague engineers for various activities like Electrical ,Mechanical, Civil, Protection & communication as per weekly approved routine jobs to send site inspection for update the percentage of completion or sign / close the punchlist.
 Preparing weekly report according to the approved routine jobs as per completion of work / punchlist & submit to the SEC Project Manager directly.
 Co – Ordination with various subcontractors, responsible for handing over of final As-built drawings.

2. Worked as SITE Electrical Engineer (Acting SITE Manager) & Duties & Responsibilities are as follows,
Client : MODON 380/110 kV BSP, Jeddah
Conractor : Al Gihaz
2 x 502 MVA, 380/110/13.8kV GIS Substation with 12 Bays of 380kV and 17 Bays of 110kV with associated systems.

 Carried out the Site Supervision/Inspection, for Erection and commissioning of all the GIS Associated equipments/Structures of the following major equipments/systems. Coordination with all the teams such as design, testing and project planning group within the company. Attending Progress review meeting with contractors and preparation of progress report.

10. 380 kV & 110 kV GIS Switchgear of ABB Make
11. 380 kV & 110 kV GIB with SF6/Air Bushing.
12. Power Transformer 502 MVA - 2 Nos. 380/110/13.8 kV ONAN Auto Transformer make ABB Cardoba.
13. 110/33 kV (2 nos) & 110/13.8 kV (3 nos) power transformers of BEST, Turkey make.
14. Auxiliary Transformer 2 MVA- 13.8 kV/380 V
15. LCC, Control Relay Panel, Bus bar Protection, SCADA, SOE, Annunciation, Fault Recorder (Qualitrol) etc.
16. AC/DC Auxiliary Power supply systems.
17. Earthing Systems.
18. Gantry, 110kV Power Cable, 13.8 kV MV cabling work.
19. Medium Voltage Switch Gear 13.8 kV of Siemens Make.

 Carry out the Execution, witness for all the pre-commissioning checks and testing done by the main contractor testing and commissioning team as under:

6. Transformer stability (Leakage under Pressure).
7. All Equipment site Tests such as power Transformer, Auxiliary Transformer, CTs, VTs, GIS Switch Gear, CVT, SA, AC/DC Auxiliary system.
8. Primary Injection and secondary Injection Test for CT’s and VT’s.
9. Material Inspection like Circuit Breaker, Control, Protection & Relay panels, Cable Tray, Control Cables, Power Cables, Structures etc.
10. High Voltage Test for 110 kV and 13.8 kV Power Cables and Switchgear.

 As a SITE consultant, attend the Inspection i.e., RMI & RFI as per contractor’s request.
 Witnessed for Installation of RTCC panels, AMR & DCU panels, 125 V DC Batteries & Chargers (back up for S/S), laying of earthing conductor, earthing risers, Capacitor banks, AC/DC panels as well as AC/DC lighting i.e., outdoor lighting, boundary wall lighting, transformer firewall lighting, link boxes with SVL & without SVL’s and laying of electrical cables 500 sqmm, 630 sqmm & upto 2000 sqmm, 502 MVA transformers(380/110 kV), 133 MVA transformers(110/33 kV), 67 MVA transformers(110/13.8 kV), Surge arrestors, surge counters, outdoor & indoor receptacles (32A,63A & 125A), DC inverters for SAS systems, AC/DC push buttons, 220 V socket outlets, RMT panels.
 Making Punch list against the incomplete works.
 Assure the quality standards as per SEC Project Specification.
 Supervising & Coordinating with CSD for the commissioning activities.
 Issuing the SITE NOTE if the contractors violating the PTS.
 Monitoring Three weekly schedule according to initial project planning schedule in case of any deviation found then preparing the recovery planning schedule with contractor to go with proper initial project schedule in order to avoid closing the project delay or energisation .
 Monitor the work performance to ensure the respect of works standards & project quality specifications.
 Keep records & make corrections in Installation drawings if it is deviated from the approved drawings.
 Follow up the pending items / Snag list during the testing stage and make sure that substation will be energized without snags / pending items.
 Holding SEC(Saudi Electricity Company) ID to enter live substations.
 In charge of Remote end substation Shoaiba & Sanabil 380 kV to upgrade and provide new protection panels to the existing bays under shut down condition.

3) Organization : CAE (Control & Applications Emirates)
Abudhabi-UAE
Designation : CP and Electrical Engineer
Duration : NOV 2012 to MAY 2013
Contractor-1 : SAMSUNG ENGINEERING
RRE-Project (Ruwais Refinery Expansion)
OIL & GAS(Offshore & utilities)
Client : TAKREER

Contractor- 2 : HYUNDAI HEAVY INDUSTRIES
IGD- PROJECT no-5239 (Integrated Gas Development)
Offshore, DAS ISLAND
Client : ADGAS(Abudhabi Gas Liquefaction Company LTD)
Duties and Responsibility:
 Cable pulling for HV and LV panels
 Cable pulling such as secondary cable and primary cable,Earthing cables for electrical cables(green and green yellow type) and instrument cables(green blue type)
 Earthing cables 4 sqmm to 185 sqmm
 Well knowledge about the underground cable 185sqmm‘T’ joint cadd welding
 Testing the cable continuity and meggering
 To study construction schedule and project budget and review them continuously to assure working within their limits.
 Having experience in a consulting engineering environment in the areas of lighting, power distribution, and other types of electrical systems
 Testing of circuit breakers, relay(ground or earth fault),CT and PT through radio Communication
 Prepare the RFI
 Having experience in Cathodic Protection and entire plant earthing system
 Installation of CP Transformer Rectifiers as per drawing
 Installation of Deep well anodes,kynar cables, anode centralizer together with cotton coated pvc pipes, end weight, deep well anode depth upto sea water level(offshore)
 Installation of canister anodes and reference cells
 Checking the location of deep well, depth of the well, steel casing, PVC casing, anode cables, coke breeze powder, native sand backfilling as per drawing
 Installation of Earth pits as per location of drawing
 Testing the earth pits using earth megger tester (value < 1 ohms)  Installing BRASS earth rod depth upto 2.4m(offshore)  Maintenance internal and external cathodic protection systems for Pipelines, Tanks, and Terminals, including monitoring, testing, design, and installation for design of corrosion control systems. Inspects installation of cathodic protection systems  Commissioning of Cathodic Protection Rectifiers, and Remote Monitoring Units.  Reviewing Electrical drawing such as SLD, Grounding & lighting. Electrical Cabling, Cable installation, glanding & termination.  Knowledge in cathodic protection system schematic diagram for underground structures (U/G pipelines, U/G reinforced steel in concrete structures  Installation of positive distribution box, negative distribution box, anode junction box for CP as per drawing location  Completion of MCCR’s earlier as per project requirement 4) Organization : SSEM (Saudi services for electro-mechanic works) C\O AL-RASHID ABETONG contracting company Saudi Arabia Designation : Electrical Site Engineer Duration : Sep 2010 to July 2012 Client : Royal Commission for Jubail & Yanbu (Royal commission via Saudi Electricity Company)SCECO Site : RC-13,RC-27 Duties and Responsibility:  Coordination for installation of • 230 kv GIS(AREVA)/34.5 kv switchgear – Project RC -13 • 115 kv GIS (Hyundai )/ 13.8 kv switchgear (Schneider) – Project 19 BD • 380 kv GIS(Hyundai) – Project RC 27  Supervision of Installation and Termination of new protection/ control panels(ABB,SIEMENS,ALFANAR etc.,), LCC, AC, DC Panels, Fire Alarms & battery charger in 115KV Substation  Testing of Transformers , Switch Gears , LT boards , UPS , Battery Charger and Relays  Testing and commissioning of High Voltage equipments (Megger test, insulation resistance test, ratio test etc).  Erection of Transformers & Circuit Breakers  Permit receiver for electrical works in existing substation  Active participation in functional checking of protection and control scheme and pre-commissioning  Project co- ordination with all vendors, subcontractors and Client.  Preparation and co –ordination for submittals to client for approval etc  Co-ordination with Planning Engineer to update time schedule and preparation of progress reports.  To execute the works according to the latest approved revision of drawings and/or instructions of authorized authorities  To supervise the construction in terms of proper method, material reservation and optimum output of labor  To study all construction drawings, documents and its updates, in terms of construction methods in coordination with other, contractors, subcontractors prior to construction.  To coordinate with the Consultant/ Supervisor for inspection of works stages to gain his approval on the works requested and to make the corrective action needed to gain his acceptance.  Review the work progress and to solve daily problems.  To study construction schedule and project budget and review them continuously to assure working within their limits.  Having experience in a consulting engineering environment in the areas of lighting, power distribution, and other types of electrical systems for institutional and commercial buildings.  Preparation of work program schedule for the timely completion of Jobs & co-ordination according to the issued program schedule By Main Contractor.  Preparation of Material / shop drawing submittals for the Consultant’s / client approval.  Being the closest member for the construction team to the labor & being aware of their requirements Extension work at Existing Substation : 19BD (Jubail Residential) Scope of work : The Scope of work under this project includes supply, installation, testing and commissioning of a new 115kv GIS in a new GIS building adjacent to the existing GIS building, supply, installation, testing and commissioning of two numbers of 115/13.8kv 50/67 MVA transformers and addition of 13.8kv switchgear line-up in the 13.8kv switchgear building extension to be constructed adjacent to the existing 13.8kv Switchgear building 5) Organization : MKM Engineering C\O Hindustan Construction Company (KKNPP) Designation : Quality Control Engineer (Electrical) Duration : Dec 2008 to July 2010 Duties and Responsibility: As a Quality Engineer is my duty to check and Verify the  All Types of Low Tension Electrical Wirings  Installation of LT Switchgears  Installation of pipe Earthing.  Ensured implementation of Quality Control Plan (QCP), Project Procedures and Specifications.  Co-ordination with Project Management Consultant (PMC) Special Maintenance Wing:  Testing of Distribution Transformer-Open Circuit Test, Short Circuit Test, High Voltage Test, Back to Back test  Repairing Works of Distribution Transformer, Repairing Works of Breakers, Potential Transformers, Current Transformers and HT Metering set.  Winding of HV coil Meter and Relay Test Wing:  Testing of current Transformers - Ratio Test. Polarity Test, High Voltage Test.  Testing of Power Transformers (up to 25 MVA) - Open Circuit Test, Short Circuit Test, Group Test, Corebalance Test, Phasing out Test, Measuring of PI Values.  Testing of HT Metering set-Ratio Test, Voltage Test, Meggering the Primary & Secondary Terminals.  Testing of Circuit Breaker - Measuring of Insulation Resistance value, Contact Resistance, Measuring of opening and closing time, Wiring Works for 11 KV, 22 KV and 110 KV Circuit Breaker and panel Switch gear works.  Other tests- Measurement of Earth Pit resistance in 66 KV,110 KV,230 KV substation yards, Meggering of all devices & Initial charging of newly installed sets of batteries I was working as a Site Quality Engineer (Operation and Maintenances) in MKM Engineering Industries in BHEL (trichy), Also Inspection Activities during the period. In Construction site. It’s my responsibility to Inspect Quality and Testing for all the accessories and to manage the Quality procedures and standards as client denoted also to give the quality progress. Interaction with the client so as to achieve the target allotted for the month and to maintain proper balance among other disciplines within the project. 6) Organization : Tamilnadu Electricity Board (TNEB) TamilNadu Government Undertaking Designation : Electrical Engineer Trainee Duration : May 2007 to Dec 2007 Job profile: This is Government concern to maintenance and operation of Electricity Distribution.  Transformer Maintenance  Meter reading testing  Inspection Activities Duties and responsibilities as a Quality Control Inspector (Electrical)  Check and Verify the  Laying of LT armored cables / HT armored cables.  End termination and running joint of LT Cables using M- Seal Kit.  Erection Testing and commissioning of CT operated energy meter panel.  Lighting work both concealed and open wiring using PVC and MS conduit pipes.  Testing of Relays - Over current relay, Earth fault relay, Differential relay, Motor Protection relay, Buccholz Relay  All Types of Low Tension Electrical Wirings It’s my responsibility to Inspect Quality and Testing for all the accessories and to manage the Quality procedures, standards and Specifications as client denoted, also to give the quality progress

Education

Anna University
BE (EEE)

   May 2003
— Nov 2007

Studied Bachelor of Electrical & Electronics Engineering

Experience

Saudi Electricity Company / Worley Parsons
Senior Electrical Engineer

   Oct 2013
— Current

Duties and Responsibilities:
3 x 502 MVA, 380/132/13.8kV GIS Substation with 30 Bays of 380kV and 24 Bays of 132kV with associated systems.
2 feeders from STG (Steam Turbine Generator) – Power plant side (step up transformers 18/380 kV)
3 feeders from GTG ( Gas Turbine Generator) – Power Plant side (step up transformers 18/380 kV)

 Carried out the Site Supervision/Inspection, for Erection and commissioning of all the GIS Associated equipments/Structures of the following major equipments/systems. Coordination with all the teams such as design, testing and project planning group within the company. Attending Progress review meeting with contractors and preparation of progress report.

1. 380 kV & 132 kV GIS Switchgear of HHI Korea Make.
2. 380 kV & 132 kV GIB with SF6/Air Bushing.
3. Power Transformer (Super Grid Transformers) 502 MVA - 3 Nos. 380/132/13.8 kV ONAN Auto Transformer make ABB Sweden.
4. Auxiliary Transformer 2 MVA- 13.8 kV/400 V
5. LCC, Control Relay Panel, Bus bar Protection, SCADA, SOE, Annunciation, Fault Recorder etc.
6. AC/DC Auxiliary Power supply systems.
7. Earthing Systems.
8. Gantry, 132kV Power Cable, 13.8 kV MV cabling work.
9. Medium Voltage Switch Gear 13.8 kV of Wescosa Make.

 Carry out the Execution, witness for all the pre-commissioning checks and testing done by the main contractor testing and commissioning team as under:

1. Transformer stability (Leakage Under Pressure).
2. All Equipment site Tests such as power Transformer, Auxiliary Transformer, CTs, VTs, GIS Switch Gear, CVT, SA, AC/DC Auxiliary system.
3. Primary Injection and secondary Injection Test for CT’s and VT’s.
4. Material Inspection like Circuit Breaker, Control, Protection & Relay panels, Cable Tray, Control Cables, Power Cables, Structures etc.
5. High Voltage Test for 110 kV and 13.8 kV Power Cables and Switchgear.
 As a EPCM consultant, attend the Inspection i.e., RMI & RFI as per contractor’s request.
 Witnessed for Installation of RTCC panels, AMR / AMI & DCU panels, 125 V DC Batteries & Chargers (back up for S/S), laying of earthing conductor, earthing risers, Shunt Reactor, AC/DC panels as well as AC/DC lighting i.e., outdoor lighting, boundary wall lighting, transformer firewall lighting, link boxes with SVL & without SVL’s and laying of electrical cables 500 sqmm, 630 sqmm & upto 2000 sqmm, 502 MVA transformers(380/132/13.8 kV), Surge arrestors, surge counters, outdoor & indoor receptacles (32A,63A & 125A), DC inverters for SAS systems, AC/DC push buttons, 220 V socket outlets, RMT panels.
 Making Punch list against the incomplete works.
 Resolve the Technical Queries according to the site requirement.
 Provide the solutions to the contractors If there is any Engineering discrepancies in approved drawings.
 Assure the quality standards as per SEC Project Specification.
 Ensure the quality process at site & maintain the QMS in compliance with ISO 9001 & related SEC standards.
 Supervising & Coordinating with CSD for the commissioning activities.
 Supervising the fire installation / commissioning activities of firefighting, Smoke detector, Modules, FACP panels.
 Checking the HVAC ducting, Panels & installation as per drawing along with contractor’s RFI.
 Review the packages for contractors internal RFI’s & conducting the final walkdown according to submitted packages.
 Approving the packages / Submittals with code 1 ,2 , 3 & 4
 Using the ENCOMPASS to get the documents / drawings to review / approval.
 Using the BLUEBAM software for Contractor’s submittals review / approval / comments.
 As per SPL (Sas Points List) , collecting / confirming the all signals from firefighting, Fire Alarm, Genaral Alarms & HVAC to annunciator panels.
 Knowledge of Fire Fighting, Fire Sprinkles, Fire Alarm, FM200, Smoke Detector.
 Close follow up with Substation Automation System for open loop / Close loop with Measurement, Alarm, Signals & Command.
 Issuing the NCR / SITE NOTE if the contractors violating the PTS.
 Monitoring Three weekly schedule according to initial project planning schedule in case of any deviation found then preparing the recovery planning schedule with contractor to go with proper initial project schedule in order to avoid closing the project delay or energisation .
 Monitor the work performance to ensure the respect of works standards & project quality specifications.
 Keep records & make corrections in Installation drawings if it is deviated from the approved drawings.
 Follow up the pending items / Snag list during the testing stage and make sure that substation will be energized without snags / pending items.
 Holding SEC(Saudi Electricity Company) ID to enter live substations.
 In charge of Remote end substation Power Plant 12 through U/G cable(9035) & 2 loop in / loop out feeders through OHTL (9034 & 9013 BSP’s) to upgrade and provide new protection panels to the existing bays under shut down condition.