E&I CONSTRUCTION & COMMISSIONING ENGINEER


Last Updated: 4th June 2018 (over 4 years ago)

Address
Bellevue, Washington

E-mail
Locked

Phone Number
Locked

Qualification Level
HNC/HND/City & Guilds

Languages
English, Spanish

Summary

Electrical Engineer with 14 years of progressive experience on construction, commissioning and turnover for large scale Power & Energy projects: 3 years in Hydroelectric Power Plant (13,800MW), 4 years in Gas Fired Power Plants (GE Frame 6EA, 7FA, GE Aero LM6000, LMS100), 3 years in Coal Fired Power Plants (300MW), and 2 year in Oil & Gas Operations.
I have led and successfully fulfill large scale EPCM, Turnkey and Fast-track projects from start to finish, Power Generation mostly, performing the roles of Superintendent, Resident Engineer, Site Engineer and Commissioning Leader and Electrical Construction Manager, providing technical support for electrical & instrumentation construction, scheduling, design review, application of construction methods, documentation and resolution of design conflicts.
Ability to always meet or beat deadlines and a Champion on HSE.
Native Spanish and fluid in English.

Education

UNEXPO
Electronics Engineer

   Apr 1996
— Aug 2003

BSc in Electronics Engineering

Experience

AEI Energy
Electrical Construction Area Leader

   Jan 2013
— Current

Project: 300MW (2X150MW) Coal Fired Power Plant
Construction of a 300MW solid fuel-fired power plant
 Guarantee that contractors are building the latest revision of the drawings, specifications, and procedures by directing and implementing project construction work processes, procedures, manuals, and systems
 Meticulously review generation of field materials requisitions (FMR), receipt of materials, and preparation of material summary reports
 Regularly monitor reporting and encoding of actual quantities installed while ensuring compliance with project quality requirements by carrying out technical audits, inspections, testing, and surveillance activities
 Create report regarding construction, QA/QC, pre-commissioning, and turnover progress
 Maintain strict adherence with projects procedures and specifications and promote work safety
 Collaborate with construction superintendents and supervisors to ensure that contractors generate required quality of work in alignment with project drawings and specifications
 Resolve technical issues that couldn’t be solved at the site by serving as liaison with home office engineers
 Edit project documents based on the changes or improvements done during the construction stage
 Ensure progression of testing, pre-commissioning, and turnover activities in line with the project schedule
 Succeeded with the creation of a methodology to measure progress and oversee required materials both included and not included in the project documentation

Duro Felguera
Resident Engineer

   Aug 2012
— Jan 2013

Project: Iron Ore (12 MTY) Concentration Plan
Construction, commissioning, and start-up of an Iron-ore Concentration Plant (12 MTPA)
 Administered all aspects of construction management work with contractors
 Evaluated contractor’s dispute claims and change orders and made recommendation to project director on possible solutions
 Instituted schedule and cost control by supporting the program controls leadership
 Communicated with contractors to clarify construction issues
 Assessed and validated contractor’s payment requisitions

ProEnergy Services
Field Electrical Engineer

   Jan 2010
— Jan 2012

Project: 800MW (GE 7FA, 7EA, LM6000) Gas Power Plants
Construction and commissioning of several thermal power plants such as GE LM6000, Frame 7EA, and Frame 7FA
 Provided keen oversight to on-site installations performed by subcontractors to ensure alignment with the drawings and specifications
 Effectively managed the installation of raceways and cables as well as commissioning of E&I/C equipment including switchgears, MCCs, Cabinets, and enclosures
 Evaluate power scheme designs, cable sizing, and types

ABB
Principal Engineer

   Jan 2007
— Jan 2010

Project: Retrofit for Guri Hydroelectric Power Plant
Retrofit of Supervision, measurement, protection, control and instrumentation systems for Guri Hydroelectric Power Plant the 3rd largest hydro power plant in the world
 Served as liaison with client and the Design Department regarding the installation details and design issues
 Spearheaded on-site document control for engineering and correspondence
 Rendered assistance to simultaneous translation for foreign instructors
 Provided direct supervision with the work and activities of the subcontractors
 Made significant contributions with the preparation of procedures and complete construction documents including progress reports and valuations

TOTAL
Entry-level Engineer

   Jan 2004
— Jan 2006

Project: 120 MMSCFD Natural Gas Plant
Construction of a 120 MMSCFD Natural Gas Plant
 Assisted the electrical field engineer in overseeing electrical construction activities such as equipment storage, preservation, and cable inventories
 Executed cable and wiring schedules daily regulated by the electrical engineer
 Held accountability in creating reports and updates of all electrical issues for the electrical engineer
 Designated responsibilities to supporting electrical engineers in testing and installing electrical equipment

Search Jobs by Industry

Ad
Ad
Ad