WIND TURBINE TECHNICIAN


Last Updated: 26th September 2019 (over 3 years ago)

Address
Philippines

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Trade Qualification

Languages
English, Filipino

Summary

 Ensures that all accessories and main parts of wind turbine are complete upon the deliviries at the site.
 Participate in nacele preparation, tower preparation & tower foundation prepation.
 Responsible on inspection of tools and equipment if the calibration or inspection date is not expired.
 Responsible of installation of cooling unit, Transformer unit, power unit & staircase set.
 Participated in erection of bottom, mid and top tower, perform high torquing of tower to tower connection and tensioning of base tower to foundation.
 Rotor assembly, erection of nacele and rotor.
 Routing and termination of small cables (power cables, lamp cables, signal cables, fiber optic cables, UPS and 690V cable)
 Cable pulling and mounting of distance rails, cable brackets and smart clets.
 Perform cable looping of cables from nacele and the whole tower.
 Participated in pre-commissioning and final commossioning of wind turbine.

Previous Projects:

19.2 MW Wind Farm SWT 3.2 DD
Pohang City, South Korea
September 21, 2017 – December 15, 2017

36.8 MW Wind Farm SWT 2.3 VS
Lockerbie,Scotland UK
December 06,2016 – February 24, 2017

270 MW Wind Farm SWT 3.6 VS
Borkum,Germany
March 23, 2016 – August 10, 2016

288 MW Wind Farm SWT 3.6 VS
Sassnitz,Germany
June 8, 2015 – Oct. 24, 2015

30 MW Wind Farm SWT 3.0 DD
Gasi-ri, Jeju-do, South Korea
Oct. 15, 2014 – Dec. 20, 2014

18 MW Wind Farm SWT 3.0 DD
Akita, Japan
June 19, 2014 - August 9, 2014

81 MW Wind Farm SWT 3.0 DD
Caparispisan, Pagudpud, Ilocos Norte, Philippines
April 1, 2014 - June 16, 2014

Experience

Siemens Gamesa Renewable Energy
Wind Turbine Technician / Blade Inspector

   Mar 2014
— Current

 Ensures that all accessories and main parts of wind turbine are complete upon the deliviries at the site.
 Participate in nacele preparation, tower preparation & tower foundation prepation.
 Responsible on inspection of tools and equipment if the calibration or inspection date is not expired.
 Responsible of installation of cooling unit, Transformer unit, power unit & staircase set.
 Participated in erection of bottom, mid and top tower, perform high torquing of tower to tower connection and tensioning of base tower to foundation.
 Rotor assembly, erection of nacele and rotor.
 Routing and termination of small cables (power cables, lamp cables, signal cables, fiber optic cables, UPS and 690V cable)
 Cable pulling and mounting of distance rails, cable brackets and smart clets.
 Perform cable looping of cables from nacele and the whole tower.
 Participated in pre-commissioning and final commossioning of wind turbine.

Previous Projects:

19.2 MW Wind Farm SWT 3.2 DD
Pohang City, South Korea
September 21, 2017 – December 15, 2017

36.8 MW Wind Farm SWT 2.3 VS
Lockerbie,Scotland UK
December 06,2016 – February 24, 2017

270 MW Wind Farm SWT 3.6 VS
Borkum,Germany
March 23, 2016 – August 10, 2016

288 MW Wind Farm SWT 3.6 VS
Sassnitz,Germany
June 8, 2015 – Oct. 24, 2015

30 MW Wind Farm SWT 3.0 DD
Gasi-ri, Jeju-do, South Korea
Oct. 15, 2014 – Dec. 20, 2014

18 MW Wind Farm SWT 3.0 DD
Akita, Japan
June 19, 2014 - August 9, 2014

81 MW Wind Farm SWT 3.0 DD
Caparispisan, Pagudpud, Ilocos Norte, Philippines
April 1, 2014 - June 16, 2014

BLADE INSPECTOR
Nabas Windfarm
May 2 to 11, 2019

Pililia Windfarm
July 15 to Augsut 01, 2019

San Lorenzo, Guimaras Windfarm
August 08 to 31, 2019

Job Description:

 Inspection of blade damage by taking photo of inside and outside of the blade.
 Identify the damaged location in the blade.
 Make report of the severity of damage if there is and recommendation on when to repair it

Siemens Gamesa Renewable Energy
Wind Turbine Technician / Blade Inspector

   Mar 2014
— Current

 Ensures that all accessories and main parts of wind turbine are complete upon the deliviries at the site.
 Participate in nacele preparation, tower preparation & tower foundation prepation.
 Responsible on inspection of tools and equipment if the calibration or inspection date is not expired.
 Responsible of installation of cooling unit, Transformer unit, power unit & staircase set.
 Participated in erection of bottom, mid and top tower, perform high torquing of tower to tower connection and tensioning of base tower to foundation.
 Rotor assembly, erection of nacele and rotor.
 Routing and termination of small cables (power cables, lamp cables, signal cables, fiber optic cables, UPS and 690V cable)
 Cable pulling and mounting of distance rails, cable brackets and smart clets.
 Perform cable looping of cables from nacele and the whole tower.
 Participated in pre-commissioning and final commossioning of wind turbine.

Previous Projects:

19.2 MW Wind Farm SWT 3.2 DD
Pohang City, South Korea
September 21, 2017 – December 15, 2017

36.8 MW Wind Farm SWT 2.3 VS
Lockerbie,Scotland UK
December 06,2016 – February 24, 2017

270 MW Wind Farm SWT 3.6 VS
Borkum,Germany
March 23, 2016 – August 10, 2016

288 MW Wind Farm SWT 3.6 VS
Sassnitz,Germany
June 8, 2015 – Oct. 24, 2015

30 MW Wind Farm SWT 3.0 DD
Gasi-ri, Jeju-do, South Korea
Oct. 15, 2014 – Dec. 20, 2014

18 MW Wind Farm SWT 3.0 DD
Akita, Japan
June 19, 2014 - August 9, 2014

81 MW Wind Farm SWT 3.0 DD
Caparispisan, Pagudpud, Ilocos Norte, Philippines
April 1, 2014 - June 16, 2014

BLADE INSPECTOR
Nabas Windfarm
May 2 to 11, 2019

Pililia Windfarm
July 15 to Augsut 01, 2019

San Lorenzo, Guimaras Windfarm
August 08 to 31, 2019

Job Description:

 Inspection of blade damage by taking photo of inside and outside of the blade.
 Identify the damaged location in the blade.
 Make report of the severity of damage if there is and recommendation on when to repair it