Senior Project Manager


Last Updated: 28th June 2018 (over 4 years ago)

Address
United Kingdom

E-mail
Locked

Phone Number
Locked

Qualification Level
Masters

Languages
English, French

Summary

25 years international experience in Program, Project and Construction Management

Education

Heriot-Watt University
Professionally Qualifified Architect

   Sep 1973
— Jul 1979

BArch (Hons) Degree in Architecture 1976
Post-Graduate Diploma in Architect Planning 1979

Experience

Emiral Spa
Project Director

   Mar 2015
— Current

Senior Project Manager & Chartered Architect RIBA ,with over thirty years international experience of Construction Project Management on various projects carried out in the Commercial Office, Retail, Hotel & Leisure Telecoms, Medical, Educational, Military, Airport Infrastructure and Oil & Gas sectors .

Organized and self-motivated with over 25 years’ international and UK experience in Project Management, contract management, architectural, civil engineering design and construction supervision on a wide range of Project scopes. Highly creative, applying imagination, resources and sound research to coordinate and innovative, viable solutions. Possesses excellent interpersonal skills, enabling a good fit within teams and a natural rapport with Clients, Contractors and Stakeholders at all levels of business. An analytical and detail oriented professional with an organized methodology, who prioritizes soundly to achieve project objectives on time and under budget. Articulate and perceptive, with abilities in english and french languages, assisting with effective integration and cooperation. Committed to professional development, acquiring practical skills and knowledge, as required. Passionate about developing potential in others and with the experience of to managing and leading multi-cultural teams.

Project and Cost Management, Contract Administration & Supervision, Project planning and Logistics, Building Design & Engineering Design Coordination, preparing of Technical Documentation, Tenders, Design Feasibility Reports and Specifications, Expertise in Claims Management and resolution, knowledge of International FIDIC and JCT Contracts, knowledge of BS Design Codes, Microsoft Office Suite, Fluent in French language.

BArch (Hons) Post-Graduate Dipl.Arch (Heriot–Watt University,UK),
Chartered Member of the R.I.B.A, 1979 and member of A.R.C.U.K, 1980. Profesional Licence with the ARB. Registration No. 047739G.

February 2015 to present

Project Director for Emiral Spa, a UAE-based Real Estate Development Company, on the Forum El-Djazair Project, comprising of Four 25 storey Residential Towers (496 Luxury apartments), 3 Commercial Office Buildings, a Shopping Mall, and 15 one-off luxury Villas, located at Morreti in Algeria. First Phase value USD 280 Million

January 2014-January 2015.

Technical Core Team Manager for Hill International Inc. Project Management & Construction Risk Managers. (Marlton, New Jersey USA and Basra, Southern Iraq).Programme Management Services for the Governorate of Basra. Leading a multi-discipline of Engineers on the guidance and development of the 2014/2015 Basra Province Redevelopment Plan. Including Infrastructure repair servives, Power Transmission , Utilities services, New Public Housing,
Road network including Bridges & Highways, Social Justice, Mosques and Higher Education, Techical Training Colleges and University facility upgrades. Government Project Budget for 2014 USD 5.0 Billion

June 2012 to Dec 2013

Site Project Manager for HSIP Project & Cost Managers (Cape Town & Mauritius). Responsible for the site supervision of construction and design coordination of a new 4 Star grade 180 Bed Hotel in Conakry; Guinea, West Africa. Engineering Consultants AECOM Sa. Main Contractor China Jiangsu Guinee Ltd. Contract Value USD 30 Million

March 2010 to April 2012

Site Project Manager for BENTINI Spa .Civil & Building Contractors
(Italy & Algeria).Responsible for the design coordination, site execution & delivery of EPC contract for Civil & Building Works Pacage for new LNG Gas Treatment Facility at Gassi Touil Oil Field, Southern Algeria. Main Contractor Japan Gas Corporation
(Yokohama). Contract value USD 30 Million. Works included Construction of Industrial warehouses, Main Plant Control Building Research & Testing Laboratory ,Drainage and 11Kv & 33 Kv Substations required at the LNG Plant

March 2009 to February 2010.

ORASCOM Construction Industries, Cairo, Eqypt, Italy and Algeria: Project Director for the Lot 6 Works –EPC Contract for a Permanent Base Camp and Industrial Area for the new LNG Train – Central Processing Plant at the EL Merk Oil and Gas Fields, Block 208 , Berkine Basin, Southern Algeria. Part of the EPC Contract Infrastructure Works awarded as as Joint Venture Agreement with Orascom CI of Egypt and Bentini Spa, of Italy .

Jan 2008 –August 2009.

Aeroports de Paris Ingenierie, (ADPi),Tripoli,Libya.Consultant Specialists in Airport Design and Engineering and Management.
Project Director in charge of Project Management and Supervision Consultancy Services Contract for the New International Airport Development at Benina Airport, Benghazi. Contract Value 400 million Euros..

Oct 2005 – Dec 2007.

Currie & Brown International, Dubai, UAE.Cost and PM Consultants.
Infinity Tower Project for CAYAN Investment and Development:
Project Manager, leading team to assist the Development Director of Cayan, a local Dubai property developer, on the new 73 storey apartment complex, known as the Infinity Tower, at Dubai Marina. Responsible from December 2006 until December 2007 on the successful completion of the Phase 1 Enabling Works.

New Dubai International Airport Expansion Project.
Senior Project Manager working on secondment for Al Abbar Aluminium Contactors, on the new Dubai International Airport Expansion Project-Concourse 2 for works packages AX323 External Envelope,(structural Glass and roof), and on AX 059 (Internal fit-out of Concourse 2 Building).

June 2005 - October 2005.

Gardiner & Theobald (Romania and UK).

Senior Project Manager assigned to assist I D Grup and Citigroup on the pre-contract phase for new office developments in Sector 1, Bucharest.

2004 - 2005

Maunsell AECOM Consultancy Services, Doha, Qatar.

Senior Project Manager for 25 site based design team in charge of the design, contract administration & supervision of the Cultural Village Project Phase 2, outside Doha: a collection of 40 individual structures, built around a central amphitheatre, with a central services compound and related infrastructure works, roads and landscaping. Contract Value (Phase 2): USD 70M. Main Contractor was Thinet Int’l, with MEP Building Services provided by Pioneer.

2003 - 2004

Biwater International Ltd .Specialist Waste Water Treatment Contractors . (UK & Lyon,France)

Contract Manager and Country Manager for the rehabilitation and extension of waste water treatment plant (increase from 100 000 persons to 200 000 persons PAX capacity), at Camberene, outside Dakar, Senegal. Preparation of claims, valuations, general contract administration and running local design team office. Design and Build Contract JV, between Civils Contractor, La Sade (France) and MEP services Contractor, Biwater Sa. Contract Value USD 6.0M.

2001 - 2003

Buro Four Project Services Ltd ( Project Managers).

Client Representative and Project Manager seconded to Exxon Mobil Global Real Estate for pre-contract management services for new offices (3000m2) in N’Djamena in Chad and Douala in Cameroon for staff management staff to oversee new 1100 km long Chad to Cameroon pipeline project. Acted as local client representative in- country responsible to find suitable sites, obtain permissions, organise all pre-contract phase up to and including, finding local contractors and conducting tender negotiations on behalf of Client. Contract Value USD 7.5M.

1999 - 2001

BPMi Paris (Cabinet d’Economistes/Project Managers).Paris, France

Project Manager for new internal fit-out of the Paris Hilton Hotel Suffren.

Client Representative/PM for refurbishment & fit-out of new (30 000m2) NewTelehouse (Neutral Carrier Co-location facility for Global Switch UK at Clichy Levallois, N.W. Paris. Responsibility to ensure all individual fit-out contractors working within MC overall programme & design parameters, organisation all requirements for new incoming Tenants, including modifications for various telecom service providers, such as, Cable & Wireless, Exodus, Above Net and Global Crossing. Total contract value GBP 60M.Main Contractor –Waterfields UK.

Site Project Manager responsible for fit-out of 3000m2 of new telecom and switch equipment space for a Point of Presence Facility (POP) for Global Crossing with Global Switch (Telehouse). Acted as PM for coordination of an Agroupement” of local Paris-based French Contractors. Contract value of fit-out Works USD 3.0M.

Client based PM for Paris HQ of Internet Incubator office for Speed Ventures BV, (Holland), in central Paris: responsible to coordinate int’l team of consultants for feasibility study and outline design stage.

1998-1999

Gulf Design Consultants.(Doha,Qatar)
Architects & Engineering Consultants.

Design Team Leader for the pre-contract design and documentation phase of new 23 storey AL Hodeifi Tower Office complex at West Bay, Doha. Preparation of all pre-contract documentation, including detailed design drawings, specifications and Tenders Documents. Contract value-USD 30M.

1996 - 1998

Geahing Engineering Berhad, Civil & Building Contractors, Kuala Lumpur, Malaysia.

Site Project Manager responsible for the site construction of new 42 storey RC framed Hotel and Office complex, comprising 800 hotel beds, 10 floors of offices, 3 floors of retail and restaurant space, a conference centre, several business suites and conference rooms. Responsible for the site supervision and implementation of Consultants design, organising a site supervision team of 30 strong, 50 different sub-contractors, preparing tenders for specialist site engineering works, attending Consultants meetings, preparing monthly Progress Reports and reporting back to Main Board on cost and cash flow issues. Contract Value USD 80.0M.

1995- 1996:

DAEWOO Corporation,(Seoul & Benghazi), Libya
Civil and Buildings Division

Site Project Manager on final Phase of the construction of ancillary technical services buildings for the Benghazi General Hospital Comlpex (1400 Beds).Contract Value of total works USD 35.0M.

1992 - 1994

Teknica Engineering UK Ltd (London & Tripoli) Oil & Gas Engineering Consultants.

Consultant Architect responsible for the pre-tender design and documentation for new Buildings & Infrastructure complex at A -115 Oil Field Development; New HQ , Offices , accommodation for 6oo maintenance and logistical support staff for Main NC-115 Field & Pipeline Development Project , located in southern Libya. Contract value of Total Development-including Pipeline: USD 11 BN- Operator – JV between Repsol (Spain) and NOC of Libya. Contractor –Mannesman (Germany).

1988 - 1991

Bovis International /Hazama Corporation JV (London & Tokyo).

Assistant Project Manager & Client Representative, responsible for feasibility studies for development of European Projects with Tokyo based Investors and Consultant SIN Int’l of Hong Kong. Varies development studies undertaken on sites in Reims(France), Algeiceras (Spain) and in the Landmark Hotel in Marylebone, London UK

1986-1988

Taylor Woodrow Construction Ltd.UK Design & Construction Division Project.

Project Team Leader, responsible for the design and site supervision of new City Trading floor for Yasuda Mutual Life City, London, new BHS shopping centre and private housing development in Luz bay in the Algarve, Portugal. Value of projects ranged from GPM 0.5m to GBP 3.0M; projects built by Taylor
Woodrow's Main contractor and subsidiary company Myton for all fit-outs and joinery works.

1985 - 1986

AREEN Design Consultants (London & Beirut) Consulting Architects & Engineers.

Consultant Architect, responsible for the pre-tender stage documentation, design and specifications for palace project for Saudi Royal Diwan, the Mina Palace complex in Jeddah, KSA. Complex comprised Mosque, 14 luxury guest villas, (5000m2 each), central dining hall and Males for 800 persons ancillary Service buildings and Security facilities. Total contract value – USD 1.2BN. Main contractor – Bin Laden Contractors (Jeddah & Dubai).

1982 - 1985

Huckle & Partners, Muscat (Oman & London), Consultants Architects.

Project Architect, responsible for Contract administration & supervision of several projects, including 3 new technical training colleges for the Ministry of Social Affairs and Labour, new offices for Shell Markets Middle East Ltd at Mina Al Fahal, upgrading of existing oilfield facilities to PDO camp at Fahud, new sports facilities for Royal Guard Brigade at Halban and Seeb, Term contract for various technical facilities for S. O. A.F, Ministry of Defence Engineering Division. 4 New branch offices in the interior, for the British Bank of the Middle East (before merger with HSBC Group). Project values varied between USD 3.0M to USD 6.0M.

1979 – 1982

J.R.Harris & Partners, Consulting Architects, (London & Hong Kong).

Assistant Project Architect responsible for Production design drawings for private Medical facility for the AMI Group in Nottingham and new General Hospital (1500 bed spaces), at Tuen Muen in the New Territories, Hong Kong.

Contact Numbers: (June 2015).

• E-mail: nicklennon1@gmail.com

• Contact phone numbers :

Mobile No:+ (00 33) - (0)6 76 65 34 28.

Fixed No: + (00 33) - (0)4 75 25 15 20

• SKYPE: nick52946

• Home address:

31, Rue Sainte Euphemie, 26400, Crest, France .

Emiral Spa
Project Director

   Mar 2015
— Current

Senior Project Manager & Chartered Architect RIBA ,with over thirty years international experience of Construction Project Management on various projects carried out in the Commercial Office, Retail, Hotel & Leisure Telecoms, Medical, Educational, Military, Airport Infrastructure and Oil & Gas sectors .

Organized and self-motivated with over 25 years’ international and UK experience in Project Management, contract management, architectural, civil engineering design and construction supervision on a wide range of Project scopes. Highly creative, applying imagination, resources and sound research to coordinate and innovative, viable solutions. Possesses excellent interpersonal skills, enabling a good fit within teams and a natural rapport with Clients, Contractors and Stakeholders at all levels of business. An analytical and detail oriented professional with an organized methodology, who prioritizes soundly to achieve project objectives on time and under budget. Articulate and perceptive, with abilities in english and french languages, assisting with effective integration and cooperation. Committed to professional development, acquiring practical skills and knowledge, as required. Passionate about developing potential in others and with the experience of to managing and leading multi-cultural teams.

Project and Cost Management, Contract Administration & Supervision, Project planning and Logistics, Building Design & Engineering Design Coordination, preparing of Technical Documentation, Tenders, Design Feasibility Reports and Specifications, Expertise in Claims Management and resolution, knowledge of International FIDIC and JCT Contracts, knowledge of BS Design Codes, Microsoft Office Suite, Fluent in French language.

BArch (Hons) Post-Graduate Dipl.Arch (Heriot–Watt University,UK),
Chartered Member of the R.I.B.A, 1979 and member of A.R.C.U.K, 1980. Profesional Licence with the ARB. Registration No. 047739G.

February 2015 to present

Project Director for Emiral Spa, a UAE-based Real Estate Development Company, on the Forum El-Djazair Project, comprising of Four 25 storey Residential Towers (496 Luxury apartments), 3 Commercial Office Buildings, a Shopping Mall, and 15 one-off luxury Villas, located at Morreti in Algeria. First Phase value USD 280 Million

January 2014-January 2015.

Technical Core Team Manager for Hill International Inc. Project Management & Construction Risk Managers. (Marlton, New Jersey USA and Basra, Southern Iraq).Programme Management Services for the Governorate of Basra. Leading a multi-discipline of Engineers on the guidance and development of the 2014/2015 Basra Province Redevelopment Plan. Including Infrastructure repair servives, Power Transmission , Utilities services, New Public Housing,
Road network including Bridges & Highways, Social Justice, Mosques and Higher Education, Techical Training Colleges and University facility upgrades. Government Project Budget for 2014 USD 5.0 Billion

June 2012 to Dec 2013

Site Project Manager for HSIP Project & Cost Managers (Cape Town & Mauritius). Responsible for the site supervision of construction and design coordination of a new 4 Star grade 180 Bed Hotel in Conakry; Guinea, West Africa. Engineering Consultants AECOM Sa. Main Contractor China Jiangsu Guinee Ltd. Contract Value USD 30 Million

March 2010 to April 2012

Site Project Manager for BENTINI Spa .Civil & Building Contractors
(Italy & Algeria).Responsible for the design coordination, site execution & delivery of EPC contract for Civil & Building Works Pacage for new LNG Gas Treatment Facility at Gassi Touil Oil Field, Southern Algeria. Main Contractor Japan Gas Corporation
(Yokohama). Contract value USD 30 Million. Works included Construction of Industrial warehouses, Main Plant Control Building Research & Testing Laboratory ,Drainage and 11Kv & 33 Kv Substations required at the LNG Plant

March 2009 to February 2010.

ORASCOM Construction Industries, Cairo, Eqypt, Italy and Algeria: Project Director for the Lot 6 Works –EPC Contract for a Permanent Base Camp and Industrial Area for the new LNG Train – Central Processing Plant at the EL Merk Oil and Gas Fields, Block 208 , Berkine Basin, Southern Algeria. Part of the EPC Contract Infrastructure Works awarded as as Joint Venture Agreement with Orascom CI of Egypt and Bentini Spa, of Italy .

Jan 2008 –August 2009.

Aeroports de Paris Ingenierie, (ADPi),Tripoli,Libya.Consultant Specialists in Airport Design and Engineering and Management.
Project Director in charge of Project Management and Supervision Consultancy Services Contract for the New International Airport Development at Benina Airport, Benghazi. Contract Value 400 million Euros..

Oct 2005 – Dec 2007.

Currie & Brown International, Dubai, UAE.Cost and PM Consultants.
Infinity Tower Project for CAYAN Investment and Development:
Project Manager, leading team to assist the Development Director of Cayan, a local Dubai property developer, on the new 73 storey apartment complex, known as the Infinity Tower, at Dubai Marina. Responsible from December 2006 until December 2007 on the successful completion of the Phase 1 Enabling Works.

New Dubai International Airport Expansion Project.
Senior Project Manager working on secondment for Al Abbar Aluminium Contactors, on the new Dubai International Airport Expansion Project-Concourse 2 for works packages AX323 External Envelope,(structural Glass and roof), and on AX 059 (Internal fit-out of Concourse 2 Building).

June 2005 - October 2005.

Gardiner & Theobald (Romania and UK).

Senior Project Manager assigned to assist I D Grup and Citigroup on the pre-contract phase for new office developments in Sector 1, Bucharest.

2004 - 2005

Maunsell AECOM Consultancy Services, Doha, Qatar.

Senior Project Manager for 25 site based design team in charge of the design, contract administration & supervision of the Cultural Village Project Phase 2, outside Doha: a collection of 40 individual structures, built around a central amphitheatre, with a central services compound and related infrastructure works, roads and landscaping. Contract Value (Phase 2): USD 70M. Main Contractor was Thinet Int’l, with MEP Building Services provided by Pioneer.

2003 - 2004

Biwater International Ltd .Specialist Waste Water Treatment Contractors . (UK & Lyon,France)

Contract Manager and Country Manager for the rehabilitation and extension of waste water treatment plant (increase from 100 000 persons to 200 000 persons PAX capacity), at Camberene, outside Dakar, Senegal. Preparation of claims, valuations, general contract administration and running local design team office. Design and Build Contract JV, between Civils Contractor, La Sade (France) and MEP services Contractor, Biwater Sa. Contract Value USD 6.0M.

2001 - 2003

Buro Four Project Services Ltd ( Project Managers).

Client Representative and Project Manager seconded to Exxon Mobil Global Real Estate for pre-contract management services for new offices (3000m2) in N’Djamena in Chad and Douala in Cameroon for staff management staff to oversee new 1100 km long Chad to Cameroon pipeline project. Acted as local client representative in- country responsible to find suitable sites, obtain permissions, organise all pre-contract phase up to and including, finding local contractors and conducting tender negotiations on behalf of Client. Contract Value USD 7.5M.

1999 - 2001

BPMi Paris (Cabinet d’Economistes/Project Managers).Paris, France

Project Manager for new internal fit-out of the Paris Hilton Hotel Suffren.

Client Representative/PM for refurbishment & fit-out of new (30 000m2) NewTelehouse (Neutral Carrier Co-location facility for Global Switch UK at Clichy Levallois, N.W. Paris. Responsibility to ensure all individual fit-out contractors working within MC overall programme & design parameters, organisation all requirements for new incoming Tenants, including modifications for various telecom service providers, such as, Cable & Wireless, Exodus, Above Net and Global Crossing. Total contract value GBP 60M.Main Contractor –Waterfields UK.

Site Project Manager responsible for fit-out of 3000m2 of new telecom and switch equipment space for a Point of Presence Facility (POP) for Global Crossing with Global Switch (Telehouse). Acted as PM for coordination of an Agroupement” of local Paris-based French Contractors. Contract value of fit-out Works USD 3.0M.

Client based PM for Paris HQ of Internet Incubator office for Speed Ventures BV, (Holland), in central Paris: responsible to coordinate int’l team of consultants for feasibility study and outline design stage.

1998-1999

Gulf Design Consultants.(Doha,Qatar)
Architects & Engineering Consultants.

Design Team Leader for the pre-contract design and documentation phase of new 23 storey AL Hodeifi Tower Office complex at West Bay, Doha. Preparation of all pre-contract documentation, including detailed design drawings, specifications and Tenders Documents. Contract value-USD 30M.

1996 - 1998

Geahing Engineering Berhad, Civil & Building Contractors, Kuala Lumpur, Malaysia.

Site Project Manager responsible for the site construction of new 42 storey RC framed Hotel and Office complex, comprising 800 hotel beds, 10 floors of offices, 3 floors of retail and restaurant space, a conference centre, several business suites and conference rooms. Responsible for the site supervision and implementation of Consultants design, organising a site supervision team of 30 strong, 50 different sub-contractors, preparing tenders for specialist site engineering works, attending Consultants meetings, preparing monthly Progress Reports and reporting back to Main Board on cost and cash flow issues. Contract Value USD 80.0M.

1995- 1996:

DAEWOO Corporation,(Seoul & Benghazi), Libya
Civil and Buildings Division

Site Project Manager on final Phase of the construction of ancillary technical services buildings for the Benghazi General Hospital Comlpex (1400 Beds).Contract Value of total works USD 35.0M.

1992 - 1994

Teknica Engineering UK Ltd (London & Tripoli) Oil & Gas Engineering Consultants.

Consultant Architect responsible for the pre-tender design and documentation for new Buildings & Infrastructure complex at A -115 Oil Field Development; New HQ , Offices , accommodation for 6oo maintenance and logistical support staff for Main NC-115 Field & Pipeline Development Project , located in southern Libya. Contract value of Total Development-including Pipeline: USD 11 BN- Operator – JV between Repsol (Spain) and NOC of Libya. Contractor –Mannesman (Germany).

1988 - 1991

Bovis International /Hazama Corporation JV (London & Tokyo).

Assistant Project Manager & Client Representative, responsible for feasibility studies for development of European Projects with Tokyo based Investors and Consultant SIN Int’l of Hong Kong. Varies development studies undertaken on sites in Reims(France), Algeiceras (Spain) and in the Landmark Hotel in Marylebone, London UK

1986-1988

Taylor Woodrow Construction Ltd.UK Design & Construction Division Project.

Project Team Leader, responsible for the design and site supervision of new City Trading floor for Yasuda Mutual Life City, London, new BHS shopping centre and private housing development in Luz bay in the Algarve, Portugal. Value of projects ranged from GPM 0.5m to GBP 3.0M; projects built by Taylor
Woodrow's Main contractor and subsidiary company Myton for all fit-outs and joinery works.

1985 - 1986

AREEN Design Consultants (London & Beirut) Consulting Architects & Engineers.

Consultant Architect, responsible for the pre-tender stage documentation, design and specifications for palace project for Saudi Royal Diwan, the Mina Palace complex in Jeddah, KSA. Complex comprised Mosque, 14 luxury guest villas, (5000m2 each), central dining hall and Males for 800 persons ancillary Service buildings and Security facilities. Total contract value – USD 1.2BN. Main contractor – Bin Laden Contractors (Jeddah & Dubai).

1982 - 1985

Huckle & Partners, Muscat (Oman & London), Consultants Architects.

Project Architect, responsible for Contract administration & supervision of several projects, including 3 new technical training colleges for the Ministry of Social Affairs and Labour, new offices for Shell Markets Middle East Ltd at Mina Al Fahal, upgrading of existing oilfield facilities to PDO camp at Fahud, new sports facilities for Royal Guard Brigade at Halban and Seeb, Term contract for various technical facilities for S. O. A.F, Ministry of Defence Engineering Division. 4 New branch offices in the interior, for the British Bank of the Middle East (before merger with HSBC Group). Project values varied between USD 3.0M to USD 6.0M.

1979 – 1982

J.R.Harris & Partners, Consulting Architects, (London & Hong Kong).

Assistant Project Architect responsible for Production design drawings for private Medical facility for the AMI Group in Nottingham and new General Hospital (1500 bed spaces), at Tuen Muen in the New Territories, Hong Kong.

Contact Numbers: (June 2015).

• E-mail: nicklennon1@gmail.com

• Contact phone numbers :

Mobile No:+ (00 33) - (0)6 76 65 34 28.

Fixed No: + (00 33) - (0)4 75 25 15 20

• SKYPE: nick52946

• Home address:

31, Rue Sainte Euphemie, 26400, Crest, France .

Search Jobs by Industry

Ad
Ad
Ad