Summary

Innovative and results-oriented professional with over 22 years’ experience as Project Controls for projects within the Oil, Gas & mine Infrastructure industries working on major refinery turnouts and upgrades, workshop fabrication projects and other onshore/offshore oil/gas developments. Focused on process improvement and on-time delivery of all projects. Offering expertise in process improvement, budgeting and forecasting.

Education

University San Martin
Business Management Specialization

   Jan 2000
— Dec 2001

University Autónoma de Colombia
Industrial Engineering

   Sep 1989
— Sep 1997

Experience

CONSORTIUM AB PROYECTOS – INGCONS
Senior Planning and Project Controls

   May 2017
— Current

Planning and project control for the EPC of 22 Km flexible flowline (Gas) 6” between Betania and Jobo substations and 84 Km flexible flowline 6” and 8” between Jobo and Bremem substation.

 Prepared detailed project schedules, resources and productivity studies, and various analysis as was required during the project
 Preparing earned value report, daily & weekly reports
 Schedule risk analysis to help forecast schedule contingencies and related cost and time impacts. TIC 25 Million Dollar

Tozzi Qatar
Senior Planning Engineer

   Oct 2015
— May 2016

Senior Project Controls Engineer for the Electrical and instrumentation works required for the construction of QSTec polysilicon production facilities in Ras Laffan Industrial City, Qatar (project cancelled due to Client financial funding).

 Collected data of all quantities and discipline deliverables, used for monitored and updating presentations for management reviews
 Prepared detailed project schedules, resources and productivity studies, and various analysis as was required during the project
 Performed critical path analysis identifying early problems allowing teams to correct shortfalls
 Managed unit price, lump sum, T&M and cost plus labor contracts. Contract in excess of 50 Million USD.

Industrial Consulting Group
Planning Engineer

   May 2014
— Sep 2015

Planning Engineer for the Pre-commissioning, Commissioning & Startup (PC&S) for the Cartagena Refinery expansion in Colombia (for Reficar, an Ecopetrol Affiliate).

 Generated and followed the schedule for Delay Coke Unit and Solid Handling Coke Unit
 Interfaced with site management regarding critical schedule activities, impacts to schedule
 Completion of the PCS as per implemented schedule with less than 5% of variation. PCS total cost was around 35 Million dollars
 Worked with project managers and superintendents to identify and resolve project claims.

Sinclair Knight Merz - SKM
Project Controls Leader

   Jun 2012
— May 2014

Project Controls Leader for the EPMC of the first phase of the Coke Mine's expansion at Cerrejon, Guajira. The scope of the work included mine facilities (welding, rail, hydraulic and wash workshops), construction of 2 new diesel tanks, infrastructure including construction of additional railways and port facilities (construction of a new coal dock, new conveyor belt system, and concrete production plant) at Puerto Bolivar.

 Led the control group (8) that provides cost control and reporting, project estimating, scheduling and change management
 Reviewed project schedule data to include records of activities, verified open/close dates, cost/budgets, structures, and associated data as applicable to activities
 Completion of mine and port works as per BLS with minimal variances
 Implementation of adapted tools for budget monitoring and global cost consolidation that was very accurate and labeled as a “success” because the estimated ended up being within 5% of the final TIC of USD 1.2 billion.

Foster Wheeler- PCIB Colombia
Planning Engineer

   Jan 2011
— May 2012

Planner & Scheduler Engineer for the execution of the Management Consulting (PMC) of a World-Class MEGA-PROJECT for the Cartagena Refinery expansion in Colombia (for Reficar, an Ecopetrol Affiliate), a huge revamp to the existing refinery from 80 kpd to 160 kpd. The simple conversion configuration was adapted to deep conversion, including new units like CDU, VDU, DCU, NHT, 2 Middle Distillate Hydrotreaters, modernization and revamp of existing FCC, HF Alky, Hydrocracker, 2 SRUs, 2 Steam Reforming units, SWS, Amine units and a new WWT.

 Established and controlled the schedule developed by contractors and worked in conjunction with contractor’s management/Lead to establish detailed schedules for all projects undertaken
 Created and maintained craft efficiency & productivity matrix and graphs and Analyzed against established schedules
 Prepared project management reports to reflect project status and/or corrective actions as was required for a project with a TIC of 8.2 Billion USD.

Cepcolsa
Project Controls Engineer

   Aug 2010
— Dec 2010

Project Controls Engineer for the Construction of pumping and water storage facilities in Caracara block, located in the Los Llanos Basin in the central portion of Colombia.

 Prepared Company standard earned value-based reports, including schedule updates, Cost Performance Reports (CPR) and earned value curves
 Coordinate with internal and external customers to obtain data concerning the status of assigned project activities or milestones
 Implement the Project controls procedures. Consistently improved cost efficiency by reducing accounting errors by 75% and decreased invoice processing cycle time by 50%. TIC was around 600 M dollar

Saipem - Eni group
Planning Engineer & Cost Controler

   Oct 2006
— Jul 2010

Cost Controller & Planner/Scheduler Coordinator for the offshore fabrication facilities (platforms, jumpers/spools anchor piles, PLETs & PLEMs, tanks, spools and pipelines section (8” to 40”) ongoing in parallel. Fabrication and installation spools for LNG plant Kwanda Soyo Base.

 Led the cost controller & scheduling team (12) and coordinate the yard planning with annual capital projects portfolio of more than 460 M dollar and 1.8 Million productive hours done per year
 Identify risks based on schedule updates with team leads, issues arising from team meetings and project and program-wide meetings
 Participated in team collaboration successfully reducing in average 70% of production backlog per project.

Bohorquez Ingeniería Ltda
Project Controls Coordinator

   Jul 1993
— Oct 2006

Project Control Leader and Quality Assurance Coordinator in Several EPc services for customers from the Power, Petrochemical, Oil, Gas and Infrastructure sector.

 Managed all project controls functions (Estimating, Cost reporting and forecasting, and Scheduling) on the more than 15 projects per year within the budget and schedule without any claims
 Led the implementation and maintenance of ISO 9001 quality management system and get Company ISO 9001 Certification
 Performed internal and external audits on projects and departments and follow-up on non-conformances and correctible actions.