Electrical Engineer with more than 11 years of working experience in large EPC projects in Oil and Gas sector


Last Updated: 30th May 2017 (over 5 years ago)

Address
Saudi Arabia

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
35 to 44

Qualification Level
Degree

Languages
English, Hindi, Urdu

Summary

1. Testing and Commissioning of Electrical Power & Control System:-
*Start-up, Pre-commissioning and Commissioning of HV/MV/LV Switch gears, Control Gears, UPS, Power Transformers, Emergency Diesel Generator etc.
*Testing and Commissioning of Industrial AC/DC UPS System (Gutor Make) including the 1400 AH Ni-Cd Batteries without vendor visit at site.
*UPS function test i.e. Switchover UPS from Mains to Bypass and Vice Versa by Static Switches Transfer
*Batteries Load Performance test (Autonomy test) by charging in Boost mode and then discharging for a specified time.
*Testing and Commissioning of Micom numerical Relay for the various protection functions e.g. Thermal overload 49, Blocked Rotor 51LR, Stall detection 48, Over current 50/51, Earth Fault 51N, Sensitive earth fault, Negative Sequence 46, number of cold and hot starts 66 etc.
*To review during the construction phase the status of testing and punch listing to ensure systems are turned over to commissioning and start-up in a smooth, safe and efficient manner.
*Interact with EPCC Contractor and client’s operation staff to keep commissioning management informed of system completion status.
*To supervise, co-ordinate and review the work of assigned commissioning engineers and supervisors, and assign work to meet completion dates.
*Managing the testing team and witnessing the various electrical tests.

2. Field Engineering (Design Review):-

*Reviews the design works and studies performed by the Engineering Consultants and ensure that they are in accordance with the technical requirements and meet the standards.
*Complete take-off from project one-line drawings, outline and specifications
*Develop test procedures and assist in testing of switchgear equipment.
*Support manufacturing and purchasing team.

Education

Visveswaraiah Technological University
Degree Engineering

   Aug 2000
— Aug 2004

Bachelor of Engineering passed with First Div in the year 2004 from Visveswaraiah Technological University, Karnataka, India

Experience

SIDEM SAUDI LTD.
ELECTRICAL COMMISSIONING ENGINEER

   Oct 2014
— Current

Commissioning of 34.5 kV Electrical power substation consisting of Power Transformers, MV Switchgears and MCCs, Industrial AC/DC UPS, EDG, MV and LV Motors, Smart LV switchgears having E3Plus relays (Earth fault, JAM, Overload etc) controlled by RS Logix Networks PLC.

Dayim Punj Lloyd Ltd.
Lead Electrical Engineer

   Sep 2012
— Jul 2014

Commissioning of Electrical Power and Control System:-
Aranging testing team for the full testing and Commissioning of electrical panels, MV-MV transformers, Motors, UPS, MOV stroke test.
Trouble shooting for the control circuitry for the MV and LV DOL Motors,
Testing of ABB make REF534 Plus relays etc.

Punj Lloyd Ltd.
Senior Electrical Engineer

   Aug 2007
— Nov 2011

Design Review, Coordination with Engineering consultant for the design modification or comments incorporation,
Taking waiver off for the deviation in the design against contract requirement.
Review of Vendor technical particulars and taking approval before procurement
calculation of MTO/ BOQ
Attending SAT/FAT

ATPL Project Division
Assistant Project Manager

   Oct 2004
— Aug 2007

Construction of 33/11 kV Electrical Power Substation, 33 kV and 11 kV Power distribution lines:-

*Installation, Testing and Commissioning of 33/11 kV Power Transformers and 11 kV Switchgears etc.
*Monitoring the progress of project work, preparing progress reports depicting the status of ongoing work.
*Preparation of substations layouts and drawings and getting approval.
*Supervise & check quality of works and compliance to technical specifications.
*Timely completion of works & to ensure quality and performance standards.
*Assist contractors/Engineers in day to day activities.
*Payment certificates preparations.
*Identifying actual causes of delay which impact the completion of work and recommending remedial solutions.
*Liaison with Govt. Officers and arranging shut down
*Survey of sites

Search Jobs by Industry

Ad
Ad
Ad