I’m seeking an opportunity to work and study in a new enviroment to develop myself. With nearly 10 years experience in EPCI project (Enginnering, Procurement, Construction, Installation) for Oil and Gas Industry (Project value: 50 to 300 Million USD) with role as planning for details, from engineering descipline to fabricate/install/com/pre-com at site.

Education

University of Technology, Ho Chi Minh City, Viet Nam
Industrial and Systems Engineering (ISE)

   Sep 2001
— Oct 2006

OTHER TRAINING COURSES:
- Certificate of attendance Project management software PRIMAVERA P6
- Certificate of advanced project management in PRIMAVERA P6 Rel. 8.4
- Participating in internal training courses on project plan of PTSC Mechanical and Construction (two months)
- Certificate of participation in training of specialized knowledge on drilling, mining and oil and gas processing
- Certificate of participation in training of specialized knowledge of petroleum economics
- Certificate of participation in communication and presentation skills courses
- Certificate of participation in training courses on application deployment 5S & KAIZEN & LEAN
- Certificate of participation in training courses on biding
- Certificate of the method of making budget estimates and cost control enterprises
- Certificate of the participation in training course effective communication skills
- Certificate of internal auditor for integrating 3 systems - ISO 9001, ISO 14001, OHSAS 18001:2007
- Participating in auto cad 2&3D
- Participating in the art of personal selling training (Singapore Informatics & Business Management Education)

Experience

PETROLEUM EQUIPMENT ASSEMBLY & METAL STRUCTURE JSC (PVC-MS)
Planning leader - EPCI Project

   May 2014
— Current

- Work with project management team in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control
- Understand scope of work, quantity and familiar with logical sequences in terms of engineering, procurement and construction, pre-com, commissioning disciplines
- Review & check project control and planning & scheduling procedures from Engineering sub-contractor
- Prepare and manage overall master schedule integrating work breakdown structure using P6 version 8.2 base on manpower, equipments and materials availability, construction sequences, identify critical path and critical activities
- Work out weight factors and generating progress S-curve, resource histograms
- Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member
- Track, monitor and forecast progress of all activities relating to project such as, engineering documents, procurement, fabrication, Pre-com, commissioning status
- Report to the project manager the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work
- Prepare monthly report reflecting work progress summary

PETROVIETNAM MARINE SHIPYARD COMPANY (PVSHIPYARD)
Leader of planning section, EPCI project

   Oct 2008
— Mar 2014

1) Plan for engineering, procurement, fabrication, erection, installation, pre-com, comissioning; monitor and measure the progress of the project items (NEW BUILDING OF A 90M WATER DEPTH OFFSHORE MOBILE SELF-ELEVATING DRILLING RIG - EPC project), schedule and control progress and manpower of PVMS & Sub-contractors (PTSC M&C, PVC-PT, LILAMA 18,VINASHIN, PVSB, NARIME); and
other tasks:
 - Preparation of detailed Construction Schedule (P6), Progress Measurement System and Progress & Resources loading in the Construction
 - Prepare of miscellaneous reports for Engineering and Procurement stage of the project, preparation of miscellaneous reports for owner as per contractual requirements
 - Responsible for Construction reports for internal and to owner, responsible for preparation of Weekly & Monthly Progress Measurement System update/ S curves, attend weekly progress meeting and any other Owner meetings as required in the project
 - Project monitoring/controls and close co-ordination with Owner and Subcontractor at job site
 - Responsible for man hours monitoring and quantity tracking for progress and productivity measurement; change orders control
 - Coordinate with construction and engineering team to prepare, monitor punch list, checking list before executing project milestones
 - Monitor heavy lift order, usage consumable material, material and equipment project, prepare weekly/ monthly status of material and equipment based on the project budget
 - Evaluate the effectiveness of execution of the project items based on criteria such as man-hour, material, consumable, lifting equipment usage comparing to the budget to be distributed
 - Carry out the lesson learn for planning and coordination between the relevant sections after completion of the project
2) Responsible for man hours, monitoring progress of FABRICATION OF TRUNIONS - BIEN DONG POC and FABRICATION DECK SUPPORT FRAME - BIEN DONG POC project; REPARE MURMANSKAYA JACKUP RIG project:
- Preparation of schedule in Primavera and monitoring of progress
 - Preparing progress % calculation systems, progress measurement using S Curves
 - Preparation of weekly: One week look-ahead schedule, updating actual progress and all related information & comparison analysis;
 - Monitor heavy lift order, usage consumable material, material and equipment project, prepare weekly/ monthly status of material and equipment based on the project budget
 - Evaluate the effectiveness of execution of the project items based on criteria such as man-hour, material, consumable, lifting equipment usage comparing to the budget to be distributed
3) Responsible for MID WATER ARCHES & GRAVITY BASES TLDD - LAM SON FPSO project & HWP-DH2 FLOWLINE WELL No 19P & 21XP - PVEP POC project:
- Preparation of schedule in Primavera and monitoring of progress
- Work out detailed resource requirement, estimation of manpower requirement for the project based on standard productivity norms
 - Preparing progress % calculation systems, progress measurement using S Curves
 - Monitoring of actual resources availability & analysis using Histogram
 - Preparation of weekly: One week look-ahead schedule, updating actual progress and all related information & comparison analysis
 - Preparation progress summary to the top management on project status for review before send to Owner
 - Daily monitoring of site activities highlighting delays and advising recovery actions
4) Other tasks:
 - Preparation for Weekly Progress Measurement System (planning package) of biding documents for A NEW BUILDING SEMISUBMERSIBLE SELF-ERECTINGTENDER-ASSIST PROJECT, FABRICATION OF MRU SKIDS FOR BUNGA ORKID PROJECT, NEW BUILDING OF A 130M WATER DEPTH
OFFSHORE MOBILE SELF-ELEVATING DRILLING RIG PROJECT
 - Preparation for planning package (schedule, progress measurement, S curve, manpower loading histogram, weekly report form) of bidding document for OFFSHORE WIND FARM SUBTRUCTURE - JACKET/PILE/TOWER FABRICATION PROJECT
 - Preparation for planning package (schedule, progress measurement, S curve, manpower loading histogram, weekly report form) of bidding document for PROVISION OF PRESSURE VESSEL REPLACE AND MODIFICATION FOR FPU DH01 DRYDOCK CAMPAIGN PROJECT, PROVISION OF REPAIR FPU DH01 & CALM BUOY ON CLASS PROJECT, REPAIR WEST TELESTO PROJECT;
 - Preparation for planning package (schedule, progress measurement, S curve, manpower loading histogram, weekly report form) of bidding document for NEW BUILT OF A 120M WATER DEPTH OFFSHORE MOBILE SELF-ELEVATING DRILLING RIG PROJECT-“TAM DAO 05”
 - Established detail plan, including baseline, man-power loading and monitoring system for REPAIR MOS JACKUP RIG – SEMCO project; REPAIR ENCO 109 JACKUP RIG project; REPAIR KG1 DRILLSHIP project; NSRP - ELEVATOR STEEL STRUCTURE project; NSRP – STEEL STRUCTURE project.
 - Established manufacturing process management for PVMS's factory (especially the control of project materials, consumable materials, drawings, manpower, construction progress of workshop).

ASIA TRADE BROKERAGE JSC
Trader & consultant

   Mar 2007
— Jun 2008

1) Order buy/sell in London/New York market, control trade sheet
2) Control customer accounts in the transaction process
3) Integrated global financial information, analysis and advice to
customers

Ad
Ad
Ad