Program Manager


Last Updated: 17th September 2019 (over 3 years ago)

Address
Australia

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
55 to 64

Qualification Level
Masters

Languages
Arabic, English

Summary

Issa is a Program Manager with over 35 years’ experience in the planning and delivery of road, rail, infrastructure and building projects. He has a demonstrated track record in project planning and delivery, building teams and exceeding client expectations through a highly developed expertise in the management of complex multidisciplinary concurrent projects requiring the management of a diverse range of stakeholders’ interests and expectations.

Education

University of New South Wales
Master Project Management

   Mar 1994
— Dec 1997

The Institution of Engineers Australia
Member - Chartered Professional Engineer

   Feb 1991
— Current

Australian Institute of Project Management
Member

   Feb 1991
— Current

University of Manchester
BSc. Civil Engineering

   Sep 1978
— Jun 1981

Experience

Sydney Motorway Corporation (Transurban)
Program Manager

   Feb 2018
— Current

Scope/Description: Program and Reporting Management for the delivery of Stage 1B M4 East and Stage 3A M4-M5 Link of Westconnex.

Responsibilities: Reviewing the contractor’s project programs and reports for compliance with the contract requirements. Identifying critical issues and advising the client and the contractor on control measures. Preparing program and progress reports for Sydney Motorway Company and RMS.

Sydney Metro
Program Manager

   Jan 2013
— Feb 2018

Scope/Description: Contract Management for the delivery of the civil works for the Sydney Metro Northwest and Program Management for the development phase of the Sydney Metro City and Southwest including the Integrated Station Development.

Responsibilities: Developed the program for the procurement and construction of each of the Sydney Metro City and Southwest contract packages. Reviewed project plans and programs for compliance with the contract requirements. Prepared monthly project program report and measured progress against baseline program. Identified project critical issues and assisted the client and contractors in developing control measures. Developed time, cost and schedule risk assessment procedures as part of the Sydney Metro Integrated Management System.

RailCorp (currently Sydney Trains)
Program/Contract Manager

   Apr 2002
— Dec 2012

Scope/Description: Procurement management for the delivery of the new rolling stock in New South Wales. Projects included; Hunter Rail Cars, Outer Suburban Rail Cars, Waratah fleet including the maintenance facility and training simulators. The first run into service was successful for all of the projects as a result of the well-coordinated transition into service programs.

Responsibilities: Reviewed project plans and programs for compliance with the contract requirements, prepared regular reports and visual management tools for the Executives, developed project management systems that gained accreditation to ISO 9001 and participated in the assessment of contractual claims.

Bovis Lend Lease
Planning Manager

   Jun 2000
— Apr 2002

Scope/Description: Procurement management for Epping to Chatswood Rail Link (13km rail tunnel and 5 new stations).

Responsibilities: Prepared the project master program utilizing Primavera and monitored progress on; design, environment impact assessment and procurement activities ensuring that the contract award date was met. Prepared the cash flow scenarios, analysed various construction methodologies for the tunnelling works, prepared tender schedules, evaluated tender programs and prepared detailed programs for the staging of the works including detailed planning for early works and possessions.

Bovis Asia Pacific
Planning Manager

   Oct 1996
— Jun 2000

Scope/Description: Project planning and control for the construction of the new headquarters for the securities commission. The challenges on the project were the coordination between the 45 trade contractors and the top-down construction method.

Responsibilities: Established the project master program for the 45 trade packages utilizing Primavera, reviewed trade contractors programs, prepared progress reports and assessed extension of time claims.

PMRT Management Consulting
Project Manager

   May 1994
— Oct 1996

Scope/Description: Various project management consulting assignments.

Responsibilities: Procurement management for three marksmanship training ranges, project management for the refurbishment of Ku-ring-gai Campus for UTS, contract administration for the construction of access tunnel shaft for the Airport Link and prepared annual capital works program and cash flow for Waste Service NSW.

Buro Happold Consulting Engineers
Project Manager

   Jun 1991
— May 1994

Scope/Description: Assisted the contractor in the planning and construction of 27 sliding domes and 12 shading structures. The challenge was that this is a one of project and managed to complete ahead of time, within budget and to a high quality standard.

Responsibilities: team building, planning, cost control and site logistics management.

Arabian Consulting Enginineering Services
Planning and Cost Engineer

   Oct 1988
— Feb 1991

Scope/Description: Assisted the contractor in the planning and control for the construction of an Army Aviation Centre.

Responsibilities: project scheduling and control, resource scheduling, materials scheduling, shop drawings scheduling and prepared progress and cost reports.

Al-Arab Construction Company
Project Engineer

   Jul 1981
— Oct 1988

Scope/Description: Construction of two schools and 64 new homes.

Responsibilities: site management, project planning and control, resource planning, quality control and co-ordination between subcontractors.

Search Jobs by Industry

Ad
Ad
Ad