Sr. Construction Engineer-Civil


Last Updated: 17th November 2018 (over 3 years ago)

Address
United Arab Emirates

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
Arabic, English, Urdu

Summary

Certified Professional Engineer-Civil carrying 24 years practical experience of construction through multiple functions of construction management, supervision, monitoring, reporting, planning, field engineering and coordination for Urban Development Projects of Public sector and Oil & Gas industries projects at green & brown fields both in upstream and downstream locations having SIMOPS and toxic gases conditions.
Contribution to the development and definition of project parameter (such as defining scope of work, schedule and completion and budgetary cost estimates) in order to ensure that projects are properly planned and meet end user requirements.
Experience of working with multi-trade, multi-national teams with the potential to take a leading role when the situation arises.

Education

N.W.FP University of Engineerg&Technology-Peshawar-Pakistan-PK
B.E-Civil

   Jun 1989
— Dec 1994

Experience

JACOBS Intl Holdings-UAE
Sr. Construction Engineer-Civil

   Feb 2015
— Current

PMC Services for this Oil & Gas mega EPC project cost ($2.2B US) of national interest. The Scope covers development of process plant facilities at Zirku and hook ups with the Artificial Islands Satah Al Razboot upstream Oil fields, located approx.120 km northwest in Arabian Gulf Sea Abu Dhabi. The project include the well Gathering facilities, & support requirements at artificial Islands S1& S2 and Crude Stabilization, Water Injection, Gas Injection, Crude Storage tanks construction, utilities buildings,CCB, Warehouses, Laboratory, Packages Shelters and district cooling plants construction, crude processing & Export of SARB and Umm Lulu Crud, The Facilities is designed for:.
• 300 MBD Crude Processing Capacity (SARB + Umm Lulu + Spare)
• 300 to 400 MMSCFD Annual Average Gas Injections (SARB Only).
• 90 MBD Annual Average Water Injection (SARB Only)
Scheme consists of two new Artificial Islands for Drilling. New facilities at Zirku Island for Processing Stor-age and export of 100,000 BPD of SARB production and 105,000 BPD of Umm Lulu production and the associated subsea pipelines and cables.

Ad
Ad
Ad