Dear Gents,

Kindly find attached CV, Recognition Certificate & Experience Certificate ( VINCI ). I'm working as a Section Engineer in Riyadh Metro Project right now and wishing to participate your team with a good and attractive offer & position as well. I'm willing to join your team. Before that, I was working as a Station Manager for Deep Underground Station in Greater Cairo Metro – Line 3 with VINCI Construction Grands Projets.

Please read the below Achievements in Greater Cairo Metro - Line 3 as well:

In 2015: I have completed all civil works for Haroun Station milestone 2 months ahead of schedule.

In 2013: I have completed all civil works for these annexes milestone 1 month & half ahead of schedule.
Then, I have been promoted to be the Station Manager for Haroun Station.

Best Regards,
Eng. Hussein Salama
Mobile : +966 59 151 3950
Email : se7s_salama@hotmail.com

Education

Ain Shams University
Student at Faculty of Engineering - Civil

   Sep 2004
— Aug 2009

2004-2009 : Ain Shams University, Faculty of Engineering
Degree : B.Sc. of Civil Engineering

Graduation Year : June 2009
Graduation Grade : Pass

Graduation Project : Steel Structure
(Pre-heater tower).
Graduation Project Grade: Excellent

Experience

Consolidated Contractors Company CCC.
Section Engineer

   May 2015
— Current

PROFESSIONAL EXPERIENCE

1- Consolidated Contractors Company. CCC. From 05/2015-Present

Title: Section Engineer
PROJECT:
Riyadh Metro Project.
RMP. BACS Consortium
MAIN STATION DEPARTMENT: 08/2017-Present

● 1B3/2B2 Olaya Station (DUG/Transfer Station) – Construction Team: as a Section Engineer – Civil
Duties and responsibility: All Civil Works
- Site mobilization and preparation.
- Excavation Works including water tightness and deep well closer.
- Control manpower over 800 workers split into two shifts including 4 Site Engineers, 3 Superintendents and 15 Foremen.
- Formworks, Steel reinforcement, Concrete casting for (Rafts, Columns, Beams, Slabs, Suspended Slabs, External Walls, Internal Walls, Core Walls, Stairs, Elevators and Escalators).
- Finishing Works: Block works, Plastering, Painting & Tiling.
- Working together with the consultant and engineering & design team to solve technical issues on site.
- Water proofing for Raft & External Walls.
- Coordination with all suppliers.
- Following up MEP Works.
- Coordination and Supervise the following subcontractors: DOGUS, STL, CRETEC & BAIG International.

VIADUCT DEPARTMENT: 05/2015-07/2017

● Substructures / Construction Team: as a Section Engineer – Civil

Duties and responsibility: Typical Piers & Special Piers

- Traffic and utilities diversion for All Bridges.
- Site mobilization and preparation.
- Foundation works for typical piers & special piers including Spread Footing and Pile Cap.
- Control manpower over 380 workers split into two shifts including 2 Site Engineers, 2 Superintendents and 10 Foremen.
- Form works, Steel reinforcement, Concrete casting for (Typical Piers: Stem & Flare – Special Piers: Straddle Beams, Hummer Head & C-Pier – Abutment Walls).
- Working together with the consultant and engineering & design team to solve technical issues on site.
- Steel Structure & Steel Formwork assembly & Installation.
- Water proofing for Spread Footing and Pile Cap.
- Post Tension Works for Special Piers.
- Coordination with all suppliers.
- Reinstatements of the site to its previous condition.

VINCI Construction Grands Projets
Station Manager

   Jan 2010
— Apr 2015

2- VINCI Construction Grands Projets (French Company). From 01/2010-04/2015

Title: Station Manager
PROJECT:
Greater Cairo Metro Line-3.

Responsibilities:
Responsible for advising on a construction site for subcontractors, crafts people and operatives, day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors, overseeing quality control and safety matters on site , resolving any unexpected technical difficulties, and other problems that may arise, managing and monitoring the contract design documents supplied by the client/architect , planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
CIVIL WORKS DEPARTMENT: 01/2010-04/2015

PHASE ( 2 ): 09/2011-04/2015

HAROUN STATION : Title : Station Manager ( 03/2013-04/2015 )

Duties and responsibility for Station civil works Phase 2 :

- Traffic and utilities diversion for the Station.
- Site mobilization and preparation.
- Foundation works for the station done by subcontractor ( Bauer Egypt ).
Included Diaphragm walls 30 m depth , 0.8 m width and Barrett installation for
Composite columns and water tightness.
- Control manpower over 130 workers split into two shifts including 2 junior engineers and 10 foremen.
- Form works, Steel reinforcement, Concrete casting for ( Columns, Struts, Beams, Slabs, Walls, stairs, Composite Columns, Elevators and Escalators).
- Finishing Works: Block works, Plastering, Painting & Tiling.
- Working together with the consultant and engineering & design team to solve technical issues on site.
- External Access execution using Berlin walls method.
- Water proofing for the raft, roof and external access.
- Super structure for external accesses.
- Reinstatements of the site to its previous condition.
Achievement: I have completed all civil works for station milestone 2 months ahead of schedule.

ANNEX ( 11A , 11B , 13A , 13B , 15A , 17A , 19A ) : ( 09/2011-03/2013 )

Title : Senior Site Engineer

Duties and responsibility for Annexes civil works Phase 2 :

- Traffic and utilities diversion for all 7 Annexes.
- Site mobilization and preparation.
- Foundation works including Diaphragm walls, water tightness and deep well closer.
- Fabrication of precast walls and stairs.
- Precast walls and stairs installation.
- Form works, Steel reinforcement, Concrete casting for (Columns, Beams, Slabs, stairs).
- Working together with the consultant and engineering & design team to solve technical issues on site.
- External access execution using Berlin walls method.
- Water proofing for the raft, roof, external access and super structure.
- Super structure for external access.
- Opening gallery to the tunnel works including cutting segments using core machine and diamond wire sow.
- Tunnel concrete filling works including earthing and concrete filling pipes installation and concrete pouring.
Achievement: I have completed all civil works for these annexes milestone 1 month & half ahead of schedule.
Then, I have been promoted to be the Station Manager for Haroun Station.
PHASE ( 1 ): 01/2010-09/2011

ANNEX ( 2A , 4A , 6A , 8A ) : ( 09/2010-09/2011 )

Title : Site Engineer

Duties and responsibility for Annexes civil works Phase 1 :

- Traffic and utilities diversion for all 4 Annexes.
- Site mobilization and preparation.
- Foundation works including Diaphragm walls, water tightness and deep well closer.
- Fabrication of precast walls and stairs.
- Precast walls and stairs installation.
- Form works, Steel reinforcement, Concrete casting for (Columns, Struts, Beams, Slabs, stairs).
- Working together with the consultant and engineering & design team to solve technical issues on site.
- External access execution using Berlin walls method.
- Water proofing for the raft, roof, external access and super structure.
- Super structure for external access.
- Opening gallery to the tunnel works including cutting segments using core machine and diamond wire sow.
- Tunnel concrete filling works including earthing and concrete filling pipes installation and concrete pouring.

ATTABA STATION : ( 01/2010-09/2010 )

Title : Site Engineer

Duties and responsibility for Station civil works Phase 1 :

- Traffic and utilities diversion for the Station.
- Site mobilization and preparation.
- Foundation works for the station done by subcontractor ( Bauer Egypt ).
Included Diaphragm walls 80 m depth , 1.20 m width and Barrett installation for
Composite columns, water tightness and deep well closer.
- Control manpower over 65 workers in day shift or night shift including 5 foremen.
- Form works, Steel reinforcement, Concrete casting for ( Columns, Struts, Beams, Slabs, Walls, stairs, Composite Columns, Elevators and Escalators).
- Finishing Works: Block works, Plastering, Painting & Tiling.
- Working together with the consultant and engineering & design team to solve technical issues on site.
- External Access execution using Berlin walls method.
- Water proofing for the raft, roof and external access.
- Super structure for external accesses.
- Reinstatements of the site to its previous condition.