PMC-Lead HVAC Engineer/Superintendent-Oil and Gas-On Shore /Off Shore


Last Updated: 7th October 2020 (over 2 years ago)

Address
India

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
45 to 54

Qualification Level
Degree

Languages
English

Summary

Dear Sir/Madam,
Hope you are doing well.
I wish to apply for subject-Lead HVAC Engineer/Superintendent-OIL AND GAS-I have 27 Years of experience worked in HVAC OIL AND GAS-ON AND OFF SHORE in Plants as well in Infrastructure facilities-FEED, Detailed Engineering, Fabrication, Installation, Commissioning and Maintenance in India, Middle East, South Korea, Kazakhstan, Georgia.

Experience in EPC Companies:
EPC Companies as Lead HVAC Engineer was responsible for FEED, Detailed Engineering Calculations(Carrier HAP Version- 4.9 Heat loads), Duct and Chilled water Pipes sizing, Duct and Piping Lay outs, Material ordering, Coordination with various disciplines Civil, Electrical, Instrumentation, Automations(PLC-DDC, Ladder Diagram), HSE, Various Interlocks, Preparation of HVAC Construction Drawings with Cad person(Autocad Version -14), Method Statements, Job Risk Analysis, attending FAT/SAT, Fabrication, Installations, Commissioning(EPC) and Maintenance.

Experience in OIL AND GAS Operating Companies:
Oil and Gas Operating companies as Project Management Consultants-PMC- was responsible for approval review of Engineering documents for HVAC Load Calculations, Specifications, Construction drawings, Method Statement, Job Risk Analysis as well on HVAC Construction side raising RFI/TQ’s, NCR/REC, Managing the sub contractors Man Power, Equipment/ Material availability, attending FAT /SAT, Timely completion of the project within the budget allotted .

Education-Bachelor Of Engineering-Mechanical

Experience:
HVAC -FEED, Detailed Engineering-15 Years
HVAC-Construction, Fabrication, Commissioning, Maintenance-12 Years

Last 10 (Ten) years working as PMC-Project Management Consultant-with Oil and Gas Operators-as PMC-Senior HVAC Engineer

Valid U.A.E/QATAR/KUWAIT Driving License

Having used the related HVAC Codes and Standards like ASHRAE-SMACNA-DW-144-SHELL DEP’S, SOLAS, NORSOK, GOST and NIP Standards .
Attached pleased find detailed C.V.

Education

Mumbai University
Bachelor Of Mechanical Engineering

   Mar 1984
— May 1989

1.Qualifications and Membership
Highest Qualifications: Degree

Qualification Subjects Establishment/Country Year
Degree/Bachelor Of Engineering-Mechanical

Thermodynamics, Air conditioning and Refrigeration.(HVAC),Machine Design, Fluid Mechanics, Strength Of Material, Metrology and Instrumentation. Indian Mumbai University 1989

(i)Bachelor of Science in Engineering -Mechanical (BSME) from Mumbai University with Grade ‘A’, having attestation from Secretary of State Maharashtra University Of Mumbai, India, Ministry of foreign Affairs U.A.E. and Kuwait. Ministry of external affairs India/New Delhi.
Additional-
(ii)Diploma in Automation and Programmable Logic Controllers(PLC)/Instrumentation(ATEC Automations and controls)-Digital Electronic-Logic Gates, Binary, Octal, BCD, Hexadecimal System., Overall view of PLC, Types of Memory ROM/RAM Central processing unit, I/O Unit, PLC Programming Terminals/ Peripherals, Installation/Maintenance of PLC, Relay Logic/Ladder Logic, Automatic control of pumping stations, Developing of Program using XIC/XIO/LATCH/INLATCH/TIMERS/COUNTERS/COMPARISION/LOGICAL Instrumentations, Circuit reading of Ladder diagrams-HVAC, Thermocouples, RTD’s, Thermostats, Pressure Transmitters, Temperature controllers.
Membership –
-Society of Petroleum Engineers-UAE
-ISHRAE-Indian Society of Heating Refrigeration and Air conditioning Engineers
-Institution Of Mechanical Engineers-U.K.-Applied.

Experience

Kellogg Brown and Root-KBR
Lead HVAC Engineer-Oil and Gas

   Feb 2019
— Current

KELLOGG BROWN AND ROOT-KBR-Abu Dhabi-June-2019-Present-Lead HVAC Engineer-On–Off Shore Oil and Gas Projects RCC/Modular Construction Buildings for the Green/Brown field Development –Oil and Gas projects responsible for HVAC FEED, Design, Detailed Engineering, Construction/Fabrication ,Commissioning and Maintenance works.
TYPE OF BUILDINGS:
Central Control Building-Laboratory Building-Work shop and Ware House Bldg.-Jetty Harbor Bldg.-Security Gate House Bldg.-Pump House
Accommodation Building-Sub Station-Office Bldg.-Drilling Office-Clinic Bldg.-Kitchen and Laundry Bldg, Analyser House ,Battery Rooms.
- Sack Room Shale Shaker, Mud Pit, Diesel Engine,LCR-Local Control Room, LER-Local Equipment Room, Main Sub Station,Process Sub Station, MTR-Module Technical rooms,Wellhead and STP Building HVAC Works, CNIA Central Island, IFCC Electrical Sub Station, IFCC-Building, 132 KV Power Generator Building, Gas Compressor Sub Station.

Qatargas RM -N-kepler off shore Marine
Sr. HVAC Engineer-OIL AND GAS-ON OFF SHORE

   Aug 2018
— Jan 2019

Rosentti Marino(Qatar Gas)-N.-Kepler Shipyard-Senior HVAC Field Engineer-Oil and Gas-On/Off Shore-March-.-2018-Present-HVAC-Detailed Engg., Fabrication, Construction, Commissioning of the Living Quarters, Sack Room Shale Shaker, Mud Pit, Diesel Engine, LCR-Local Control Room, LER-Local Equipment Room, Main Sub Station, Process Sub Station, MTR-Module Technical rooms, CNIA Central Island, IFCC Electrical Sub Station, IFCC-Building, 132 KV Power Generator Building, Gas Compressor Sub Station.

Petrofac International Ltd.
HVAC Superintendent Manager-OIL AND GAS

   Nov 2016
— Aug 2018

PI Limited-(On Shore)-Oct.-2016-February-2018-HVAC/PLUMBING Superintendent-HVAC-Fabrication, Construction, Commissioning, Maintenance of HVAC Projects-Oil and Gas having 3# Engineers,6# Supervisors, and 125 # Trade People- Ductmen, Pipe Fitters, Welder, Millwright Fitters, Electricians, Helpers, DDC/PLC Programmers.

Punj Lloyd Ltd
HVAC Superintendent Manager

   Oct 2014
— Oct 2016

Punj Lloyd Ltd.-(On Shore)-Qatar-Oct.-2014-Oct-.2016-HVAC/PLUMBING Manager-On Shore-Oil and Gas Projects responsible for HVAC Design, Construction/Fabrication, Commissioning and Maintenance works having workforce 4# Sr. Engineers,8# Supervisors,3# HVAC Cad Person/Balance Trade People(250#)-Ductmen, Pipe Fitters, Welder, Millwright Fitters, Electricians, Helpers, DDC/PLC Programmers.
Project-QP-Ras Laffan Field Development-Qatar

ADCO(CH2MHILL)-JACOB(ADMA)-AMEC(ZADCO)
PMC-SENIOR HVAC ENGINEER-OIL AND GAS

   Jul 2009
— Jul 2014

Jacob Intl.-PMC-(ADMA-Off Shore)-S. Korea-Seoul/Abu Dhabi-2013-2014-PMC-Lead HVAC Engineer-On-Off Shore Oil and Gas Projects for the Green field Development –Oil and Gas project was responsible for HVAC Design, Construction/Fabrication, Commissioning and Maintenance works was involved in HVAC Project Detailed under, Field development in Abu Dhabi-UAE
SARB-4- Field Developments- Field development OFF SHORE Island-containing,-Sub stations and Control Plant buildings, Analyser House, Battery room and Infrastructure Facilities, Accommodation Modules, Sack Room-Shale Shaker, Mud Pit, Diesel Engine
TYPE OF BUILDINGS:
Central Control Building-Laboratory Building-Work shop and Ware House Bldg.-Jetty Harbor Bldg.-Security Gate House Bldg.-Pump House
Accommodation Building-Sub Station-Office Bldg.-Drilling Office-Clinic Bldg.-Kitchen and Laundry Bldg.
LCR-Local Control Room, LER-Local Equipment Room, Main Sub station,Process Sub Station, MTR-Module Technical rooms, CNIA Central Island, IFCC Electrical Sub Station, IFCC-Building, 132 KV Power Generator Building, Gas Compressor Sub Station,Analyser House, Battery Rooms
Projects-ADMA-SARB-4/2-Umm Lulu-South Korea-Seoul/Abu Dhabi,

Zadco-PMC-(Off Shore)-Abu Dhabi-2012-2013-PMC-Lead HVAC Engineer -On–Off Shore Oil and Gas Projects for the Green field Development –Oil and Gas project OFF SHORE was responsible for HVAC Design, Construction/Fabrication
Commissioning and Maintenance works
TYPE OF BUILDINGS:
Central Control Building-Laboratory Building-Work shop and Ware House Bldg.-Jetty Harbor Bldg.-Security Gate House Bldg.-Pump House
Accommodation Building-Sub Station-Office Bldg.-Drilling Office-Clinic Bldg.-Kitchen and Laundry Bldg, Analyser House ,Battery Rooms.
Sack Room-Shale Shaker, Mud Pit, Diesel Engine,LCR-Local Control Room, LER-Local Equipment Room, Main Sub Station,Process Sub Station, MTR-Module Technical rooms, CNIA Central Island, IFCC Electrical Sub Station, IFCC-Building, 132 KV Power Generator Building, Gas Compressor Sub Station.
Project-ZADCO-UZ-750-Abu Dhabi

PMC-CH2MHILL-(ADCO-On Shore)-Abu Dhabi)-(2009-2012)-PMC-Lead HVAC/PLUMBING Engineer-Projects-for the Green field Development–ASAB-SHAH-SAHIL-BQ-QUASAWIRA-Oil and Gas project was responsible for HVAC Design, Construction/Fabrication Commissioning and Maintenance works was involved in HVAC Projects.
TYPE OF BUILDINGS:
Sack Room-Shale Shaker, Mud Pit, Diesel Engine ,Central Control Building-Laboratory Building-Work shop and Ware House Bldg.-Jetty Harbor Bldg.-Security Gate House Bldg.-Pump House, Accommodation Building-Sub Station-Office Bldg.-Drilling Office-Clinic Bldg.-Kitchen and Laundry Bldg, Analyser House, Battery Rooms.
Projects-SHAH-ASAB-SAHIL-BAB-QUSAHVIRA-BQ Field Developments Plant and Infra Structure-–HVAC Works

HVAC Works for Oil and Gas Projects-ON-OFF Shore -FEED,Design, Detailed Engineering, Construction, Testing Commissioning and Maintenance-Hazardous and Non Hazardous area.Mechanical, Electrical and Instrumentation/P N ID/D AND ID-Duct and Instrumentation n Diagram, Automations/ DDC/PLC/Drainage/Interlocks-Fire and Gas/HSE/Interfaces/DCS/BMS)/Modification /Up Grade of existing HVAC Facility ON-OFF Shore-Island/Platforms FPSO.
1)Review and approve EPC Contractor’s-HVAC-FEED, Specifications, Lay Out Drawings, Process and Instrumentation /Duct and Instrumentation Diagrams
2)Approval of Heat Load Calculations and Fresh Air Calculation for maintaining sufficient conditioned air pressure inside occupied area over atmospheric pressure..
3)Calculation of Oxygen requirements for the critical occupied area in case fresh air supply need stops.
4) To compete check on contractor offered HVAC scope in line with project requirement compliance with desired HVAC-ASHRAE-SMACNA-DW-144 codes and standards.
5)To Discuss/Conduct meeting with EPC contractor weekly basis for Progress/Any short fall-ensuring projects in line with target scheduled.
6)Identification of any problem recommendation with WAY OUT solution to HOD
7)Conduct Project Interface meeting with department and EPC contractor’s for Electrical-Instrumentation-HSE-Fire and Gas-HVAC Equipment’s/Instrument’s and Unit Control Panel(UCP), Identification of location for Detectors-H2S/Hydrocarbons/Fire,Smoke detectors.
8)Attend FAT for the Equipment’s performance and Integrity
9)Support EPC Contractors and Department people for HVAC-Interface and Technical Problems with WAY OUT Solutions. Always willing eager to help contractors for their any problem concerns, related to HVAC
10)Report Department Engineering Manager towards HVAC- Project Progress and any short fall concerns.
11)Checks on EPC Contractor’s details on HVAC-Equipment’s and Accessories procurement’s in relation to Equipment’s and Instrumentation rating’s for Hazardous and Non Hazardous area for -ZONE(0-1-2)-GAS Group(II-IIA-IIB-IIC-IID-IIE)-Temperature Ratings(T1-T2-T3-T4-T5) and ATEX in consultation with Electrical and HSE Departments
12) Communicate with Operation Team and Central Engg. Department.
13) Coordinate with site people and Supervising during HVAC –Construction-Commissioning-Answering site queries to meet project requirements and compliance.

FEED/Conceptual Design/Detailed and Air pressurization Design Engineering-Installation-Commissioning Start Up Phase, for Plant Buildings and Infrastructure Projects. .
-Review/Preparation/Approving FEED Document/Detailed Engineering-Specifications lay outs
-Calculation/approval Heat Load Calculation CARRIER-Hourly Analysis Programme-HAP-4.1 & 4.3/4.4/ASHRAE Standards, Fresh air, Pressurization, Exhaust air, Recirculation air quantity, Heaters and Humidifier requirements, Air quantity for Pressure gradient, Battery room fresh air/exhaust air.
-Pressure drop calculation for chilled water pipes-Pump HP
-Pressure drop calculation ducts- AHU motor
-Calculation of Expansion vessel/Pressurization Unit
-HVAC Process and Instrumentation Diagram
-Preparation of Duct /Chilled water/Refrigerant piping/Plant room lay outs.
-Preparation of Duct and Instrumentation diagram for HVAC
-PLC/DDC- HVAC Control Panel specification Processors/Modules specifications, In put/Out put digital-Analog points, Programs Logic approvals, HMI set up, HVAC Pre requisites, HVAC plant–Operation and Principle philosophy with Fire and Gas signal/Gas detections signal received from Fire and Gas panels.
-Answering all technical Query from site in Construction, Maintenance and Design related–HVAC Works
-EPC Contractor, Vendor and Sub contractors management/Equipments/Material approvals, Equipments pressure witness tests for Chillers, Condensing units, AHU’S at manufacturing place
Involved in Preparation/Approving of FEED document-HVAC Specifications, Single line diagrams/HVAC Process flow/Process and Instruments diagrams, HVAC System(Chilled water/Dx. System) deciding, Equipment sizing/locations/lay outs-Chilled water/Refrigerant piping/Duct/Plant Room for HVAC Equipments ON/OFF Shore projects.
Technical/Site Queries. Ensuring of project specification implemented by detailed design contractor, covering all clarifications and project concerns of FEED design team and Client.

Qatar Petroleum
HVAC Engineer

   Jun 2006
— Jul 2009

Petro chemical Co.-QP-2006-2009-Sr. HVAC Engineer-looking after maintenance of HVAC System containing chillers, Condensing units, Evaporating units, AHU’S, Fresh Air Handling unit(Twin Fan), Chilled water Pumps, Fan coil units Packaged units, Split units, Fire dampers, Back draft dampers, Motorized volume control dampers, Anti blast Valves/dampers, Pressure relief dampers, Humidity transmitters, Thermostat, Analyzer room specialized air conditioners, Relays, Temperature and Pressure transmitters, Humidifiers, Heaters, serving air conditioning need for Sub Station, Control building, Pump room, Process interface buildings, Process management system. Critical to maintain temperature, Humidity and pressure 24X7 Days a week. I was responsible for guiding in house discipline Engineers, Supervisor, Mechanics and Cup, HVAC System contractors man power to perform satisfactory the following task,for ON-OFF Shore fields- modifications-Al Rayyan, Mydan Mahzam and Bul Hanine
▪Preventive and Breakdown maintenance through SAP
▪Details of spares from site criticality, Checking practically site conditions.
▪Ordering of spares through SAP, follow up, Maintenance of critical spares required through SAP
▪Making notification of breakdown in SAP, creating order in SAP, clearing order afAEter completion of work in SAP
▪Maintaining the history of particular Equipment/Instrument in SAP with regard to number of break down replacement
▪Analyzing/Preparing the report for frequent break down, detecting grass root cause suggesting/implementing remedy, Preparing regular scheduled for preventive maintenance to be feed in SAP for automatic generation of order to be executed. Maintaining inventory spares in SAP, withdrawing spares from SAP against work order ref.
▪Sequencing between A/c Equipments running/Stand by as per plans or for preparing shut down or optimizing balancing the system on account of run hours of HVAC Equipments, performance for cost effective /trouble free continues running for longer time for day and night.
▪Arranging the manpower to take the break down work considering cost/time frame in mind with minimum down time.
▪Also looking after any new installation/replacement within complex on Concept, Design, and preparation of specification, approval of Equipment/Material, construction and commissioning of the HVAC Works. ▪Supervision, Inspection, Witness of contractor work ensuring continues running of the HVAC system without break down regular periodic site visits and checks on for-Compressor-check oil level, operating pressure, Bearing temperature unusual noise, Removing head to check valves/Inspect oil for specific coded colors identification or contamination Check crank shaft journals/misalignment of connecting rods/Check piston rings/cylinder liners/Check oil passages. Chilled water /Condenser water pumps- Check Packing/Mechanical seal for leak/Noise/Vibration, Alignment/Lubrication of bearing, Shaft sleeves/Erosion & Corrosion of impeller Heat Exchanger (Chiller) - Check Entering/Leaving. Temperature & pressure, Check P.H. value of water and make up water consumption, removing head check tubes for scaling; clean it with detergent or de scaling chemicals. Cooling coils- Check for dirt/ice formation/Inspect distributor for uniform feed, Clean it with compress air(from distance)/ Detergent- Piping(Chilled /Condenser water)- Check for unusual vibration ,Check for leak at the joints, Check for wear and tear of valves/ Damage to Insulation Air Handling Unit Check drives(‘V’ belts) Clean filters (Based on surroundings), Check Housing/ Wheel for rust/dirt- Excessive vibration of fans/Mounting botightness, Dampers- Check for loose linkages, Lubricate pins, Check leaves for distributions, Electrical: Check Contactors for carbon formation or tripping due to overheating,, solenoid Coils, Magnets, Overload relays for proper workings, Instruments: Check Thermostats, Resistance

Temperature Detectors, Solenoid valves, Humidistat, Heaters(Coil continuity) for satisfactory ON/OFF functioning . PLC –Preparing programmed to run HVAC system for weekly/monthly schedules based on availability of HVAC equipments/instruments components giving thought to serve continuously the critical areas like Switch gear rooms, process interface buildings, control buildings and analyzer rooms

Petrofac International Limited
HVAC Engineer

   Apr 2003
— Jun 2005

Petrofac Int.-On Shore-Georgia-2003-2005-HVAC Engineer-BTC Project-Georgia (British Petroleum Project)was looking after Construction, Commissioning,Maintenance of HVAC facility for British Petroleum ,Pumping Stations (Four Numbers) project in Georgia, Baku, Turkey, and CHEHAN –BTC –Pipe line.
HVAC Facilities (Centralized Direct Expansion System) in the Sub Station building, Control building, Ware House, Accommodation block, Analyzer room, and Pump room. Review /Approve Contractor/ Vendor design, data, drawings. so that required objectives and industrial standards and codes are met,Area classification-Hazardous/Non Hazardous Area Classification based on Zone system or latest Class/Division/Group System, U.S.A.▪Fire, Gas and Smoke criteria-Control logic for PLC/DCS in relation to safety.
▪Temperature (23 Deg. Cent.±1.5DegCent.)and Relative Humidity(50%±5),Higher temperature, generally above 40 Deg. Centigrade. will malfunction Electronic Chips, microchips, PCB’S other electronic components and electrical panels/High humidity will tend to deposit water moisture on electronic/electrical component ,will malfunction plant operation. With very low humidity/dry atmosphere there is possibility of static discharge(possibility of ignition flammable gas and dry air) in the dry area like battery room.
▪HVAC system equipments layouts-Location, Selection of HVAC equipments respect to space available and routine of refrigerant pipes / (Dx. System) and routine layout of Chilled water pipes in chilled water system.
▪Air cleaning and Filtration-Removal of air borne Particles, Dust and Gaseous contaminants from the Fresh air, Exhaust air and Flue gas for air pollution control. Reduce the salt in fresh air concentrations to 0.05ppm by weight from an input of 3.6ppm, based on NGTE(National Gas Turbine Establishment, USA) Standard 30 knot aerosol and (ii) dust particle removal efficiency of 98% at 6 microns to BS 540 Part I or equivalent.
▪Pressurization-Prevent smoke spreading and keep enclosed escape ways free of smoke in case of fire and prevents ingress of potentially explosive / toxic gas-air mixtures into non hazardous areas, electrical switch rooms and equipment rooms.
▪Air dilution ventilation-To maintain an atmosphere where the gas/air mixture is kept below lower explosion limit (LEL) during normal operation and also to reduce the risk from build-up of potentially explosive / toxic gases within these spaces
▪Selection of Refrigerant- Never Use of flammable and explosive refrigerant like Ammonia, recommend to use HCFC-R407C /R-134A/R123and R410
▪HVAC Control Philosophy-It is very important feature, on Safety, detection of Fire, Gas, Smoke will be alarm as well logic sequencing of stopping/Running of HVAC Equipments. and Economical-Part load running of the HVAC system based on ambient air condition.

HVAC SYSTEM COMMISSIONING
A)HVAC-Chilled water system-Commissioning (Short Note)-Entire chilled water pipes are clean flushed for 2-3- hours with plane water with the help of pump, to remove foreign particles, dust debris formed during welding(Pipes).First chemical is added- DEARBONE in to the closed chilled water pipe loop, system pressure is increased to 2-3 BAR with hand pump, run the system for 10-12 hours with continues water circulation with pump as desired by the consultant. Flush entire system, add chemicals(cleaning),inside water circulation check water sample in laboratory for PH value should be between 7-8.Seprate temporary Pump, Butterfly valve funnel assembly is made for this purpose. During flushing care should be taken that water should not enter chilled water coil in order to prevent any damage to coil. Check alignment of pulley for AHU Blower, fixing of Pre and Bag filters, Temperature and RH measurement, CFM fresh/recirculation air measurement etc.
Organize site visits when required,Site walk down, Preparing Punch list/Check list-Preparation of Mechanical Completion Packaged-MCP Documentation-HVAC System Commissioning, HVAC Run/Performance Test (Summer/Winter)/Compliance Report as per Client Documents requirements/System Hand Over/Client HVAC hand over.

B)Commissioning of Direct Expansion HVAC System: Fixing of the filters, Checking thermostat functioning on FAN-COOL-HEAT Mode, Leak test with nitrogen(Halide torch/electronic leak detector/soap solution),.Dehydration and Vaccumisation, Charging oil for compressor, charging with refrigerant-R-407C,Adjusting suction and discharge pressure, Checking various parameter inside conditioned room, Air off temperature from coil, Setting HP/LP Cut outs, Return/fresh air mixture temperature on coil, Checking inside temperature/Relative humidity, cool down time.

Preparation, Checking ,Evaluating, Approving of Project/Product specification, keeping in mind industrial norms and project requirements towards Process and Instrumentation diagrams for HVAC System, Material take off, HVAC Equipments selection, Evaluation of HVAC Vendor/HVAC Contractors, Preparation of workshop drawings with CAD
person, Location of thermostat, humidistat pressure transmitter, temperature transmitter to hook up same with PLC further to DCS for generating alarms on FAULTS /TRIP/RESET/RUN HOUR check for HVAC Equipments.
Control logic for HVAC system to feed in to PLC (Further to DCS alarms) for effective and safer sequence of operation of HVAC System on detection of fire, smoke and gas.
The system logic need be set in such a way that all the critical equipments, components like PLC, Motorized damper, Pressure and Temperature transmitters running on 24 Volts AC Supply will switch over to Generator/UPS/Battery mode in case of main power from Electricity supply board fails. Few important air handling units are also covered to switch over to Generator mode in case of main power fails.
Dealing with Client, Supervising discipline Engineers, designers, CAD person, various agencies ,Approval/Clearance from consultant/Area authority. Supervise various agencies/Contractors involved. Manpower requirements on installation, Testing, Commissioning front in relation to project completion time/Cost concerns. Supervising interfacing/hook up for HVAC system with major Contractors/Agencies working ,
Testing Adjusting and Balanlcing of the HVAC System
Organize site visits when required,Site walk down, Preparing Punch list/Check list-Preparation of Mechanical Completion Packaged-MCP Documentation-HVAC System Commissioning, HVAC Run/Performance Test (Summer/Winter)/Compliance Report as per Client requirements/System Hand Over/Client HVAC hand over.

YUSUFI BROS
HVAC Incharge-Projects and Service

   Sep 1999
— Sep 2003

YUSUFI Bros.-Kuwait–1999-2003-HVAC Projects and Service Incharge-Industrial HVAC Projects-was looking after HVAC - Design, Detailed Engineering Inspection, Construction Supervision, Testing & Commissioning. Maintenance of Direct expansion system as well chilled water system for Oil pier building, KOC, Training center for KNPC and Resorts Commercial complex involving chilled water system up to 750 T.R.
Responsible for EPCM of HVAC system for Chillers(Air cooled condenser with copper tubes/fins with anti corrosive resistance painting/Water cooled condenser with Cu./Ni. tubes, chilled water/condenser water pumps with Mechanical seal and SS impeller, Air Handling units, double deck air handling units, Fan coil units, gate valves, globe valves, isolating valves, Balancing valves, Flexible connection at In/Out on water and air side of AHU/FCU, Test points, Scrubber(Dilution of toxic H2S gases/Purge system), Fume extractors, drain cock, Binder test point, air vents. Strainers ,check valves,2/3 way valves with proportion ting/on-off thermostats, pressurizing tanks, Expansion tanks, flow switch, Chemical dosing pot, Read, Prepare, Evaluate–Consultant specification/B.O.Q./Contract Condition, prepare if any deviation require from specification and approval of same from client/Consultant.

Plan, Organize & implement a design built project ensuring timely completion ,in addition to preparing cash flow forecast, Vendor awarding & developments. Preparation of process and Instrumentation (PID) diagrams.
Checks, Prepare, Approve, Certify on Chilled/condenser water or Refrigerant piping layout drawing, showing size of chilled/condenser/refrigerant water pipes, location of Gate/butterfly/double regulating Valve, Balancing Valve, Strainer, air vent, mixing/modulating valve, coupling, Duct layout drawings, showing size and location of supply air/return air diffusers/grills/risers, volume control damper, fire damper etc. Plant room layout drawings showing location of chillers, chilled/condenser water pumps, noise level below 82 dB at distance of 3 ft, pressurization unit, chemical dosing pot etc.
Central toilet/kitchen ventilation/Separate dedicated hydrogen Battery room ventilation system sizing exhaust fan, fuel storage ventilation, Chilled water pipes/ duct riser diagram. Pressure testing of chilled water pipes (7-8 Bar)/Copper refrigerant pipes 20 Bar in Dx system, Commissioning, pre-commissioning and testing,
▪Air Handling Unit run test, inspection of fan belt tension, and pulley alignment
▪Chemical cleaning/dosing of chilled water loop with chemical to flush burr, debris, foreign particles
▪Activation of heater banks in step with desired set temperatures
▪ACCU/CHILLERS testing of high pressure and low pressure refrigerant, Oil pressure checks
▪Chilled water pumps checking for Mechanical seal, flow switch operation, Impeller balancing.
▪Functioning of Solenoid valve/coil activation, Condition of filter drier, Color of refrigerant after starting the unit in sight glass indicates moisture, air present in the refrigerant system
▪ACCU cut In/Out refrigerant Pressure testing, leak test(Refrigerant torch, Soap solutions),flushing with nitrogen, ▪Creating vacuum and gas charging
▪Airflow balancing, Water flow balancing.
Design, Engineering, Inspection, Construction Supervision Testing and Commissioning of HVAC System for -following Projects Completed Successfully,
-HVAC system for Ministry of Oil and Gas for KNPC in Kuwait for their Oil Pier facility worked as Senior HVAC Engineer for HVAC scope Hyundai Engineering and Construction.
-HVAC facility for training center of Kuwait Oil company involving Reciprocating Air Cooled Chillers(Carrier), Micro processor panels, Air handling units, Chilled water pumps, Fan coil units, Chemical Dosing system, Pressurization pumps, BMS/DDC controls and PLC.
-Refrigerant pipe Sizing, Chilled/Condenser water pipe sizing, Design/Selection of Double deck air handling units with fixing amount of fresh air(Need for positive pressure to be maintain) and circulation air quantity fixing, Pressure drop calculation for chilled water loop, friction loss in chilled water/Dx. coil, Valves, Pipes, Bend, Elbows. Design of Air handling unit required sections Pre Filter, Bag Filter, Chilled water coils, Humidifying Section, Water Eliminators, Fan Section, and Pre Heaters based on Out door air ambient condition, psychometric plotting and Indoor Air Temperature and Relative Humidity air condition parameters requirements.

Blue Star Limited
HVAC Manager

   Jan 1990
— Jan 1999

Blue Star Limited-India-1990 to 1999-Assistant Manager HVAC-FEED, Concept and Detailed Engg.-Oil and Gas facility, Pharmaceutical, Synthetic fiber, Power plant, Hospitals in which all critical air parameters like Temperature, Relative Humidity, Pressure differential, Safety affects comforts of people and malfunctioning of various industrial equipments/components/material with respect to condition/quantity of air surroundings with time.
I was responsible for Design, Detailed Engineering Inspection, Construction Supervision, Testing & Commissioning of special HVAC projects related to Laboratories, Pharmaceuticals, Oil and Gas, Power plants with HVAC-chilled water and Direct expansion system of air conditioning, occasionally chilled brine system of HVAC to cover low temperature and low relative humidity. Also worked on air washer system for forced ventilation which is widely used in power plants.
Objectives achieved,
-Feed-Concept of HVAC system Design and Detailed Engineering.
-Heat load calculations with Carrie USA Corporation Software
-Pressure drop calculations in Chilled water pumps for working out motor Horse power to overcome friction loss in pipes, Valves, Elbows, “T”s,
Coils, Heat exchangers.
-Pressure drop calculation to work out pressure loss of air friction in Ducts, Filters(Pre and Bag),Dampers, Eliminators, Elbows, Chilled water/Dx. coils, Sound attenuators, Supply/Return air Grills/Diffusers finally to arrive at motor horse power for Air Handling units/Fan coil units.
-Preparation of Process and Instrumentation diagrams for HVAC System.
-Estimation of HVAC System/Preparation of Bill of Quantity/Material takes off/HVAC Equipments selection.
-Preparation of Project/Product specification.
Technical specification/Bid/Process and instrumentation diagrams, and Techno-Commercial Evaluation Checking various design data Of Supplier/Vendor/Consultant critical for HVAC functioning- Heat Load CalculationsHAP-4.4-Carrier Corp. U.S.A-Temperature and relative humidity subject to application requirements. Number of fresh air based on ASHRAE-on shore /off shore standard application guide lines, positive /pressure differential to be maintain.-Sensible load-Latent Load/ADP Temperature-Dehumidified CFM & Fresh Air CFM-Tons of Refrigeration Sensible Heating required to maintain desired sensible heat factor to avoid condensation.-Plotting on Psychometric chart, Selection of Refrigerant(R-407C/R-410A/R-134A/R123)Sizing of chilled water and refrigerant pipes based on velocity friction consideration, Pressure drop calculation for chilled water in pipes, in closed chilled water system for selecting pump head. Internal and External static Pressure drop calculation for the equipments and connected Plenum/Ducts in order to arrive total static pressure hence BHP of the equipment required. Central toilet/kitchen, Battery room, Fuel storage tank ventilation/exhaust system air changes and pressure drop.
Design, Engineering, Inspection, Construction Supervision Testing and Commissioning HVAC System Systems for -following Projects Completed Successfully,
-HVAC works for Bharat Petroleum Corporation Limited, 75T.R. x 2 Nos. Air cooled Central Direct expansion air conditioning system involving, Air cooled chillers, Double deck air handling units, Variable speed chilled water pumps, Chilled water piping, MCCB/MCB/PCB/ELCB with Automatic expansion tank, Dosing pot Electrical wired to DCS for alarms on equipment run hours, TRIP/FAULT/RESET was working as lead HVAC Engineer
- Air Conditioning facility for Thane Municipal Hospital involving Operation theater with 100 % treated air facility without recirculation of air. The temperature was maintained at 21 Deg. Centigrade and controlled Relative Humidity 50%.The positive pressure were maintained inside operation theater and filtration level was 99.99% down to 0.3 microns (HEPA Filters) .The water cooled condenser chilled water system system with air handling unit were having Chilled water coil back to back Direct expansion coil this coil is connected to condensing units located on the roof. In emergency in case chilled water system trips or fails, the stand by Direct expansion system will start, hence during critical time HVAC facility will not get effected.

Search Jobs by Industry

Ad
Ad
Ad