Mechanical Engineer


Last Updated: 24th May 2017 (over 5 years ago)

Address
Oman

E-mail
Locked

Phone Number
Locked

Gender
Male

Age Range
18 to 24

Qualification Level
Degree

Languages
English, Gujarati, Hindi

Summary

* Pump alignment
*Equipment Erection
*Startup and alignment
*Material coordinator
*static and rotating equipment
*Purchase order
etc

Experience

MAA KUTHARI GLOBAL
PIPING/ENGINEER ENGINEER

   Jun 2016
— Current

 Preparation of Piping Material Take offs, BOM, BOQ from drawings.
 Execute project activity with material planning and provide technical support for site work.
 Experience in working with different types of Metallic (SS, DSS, CS, MS) and nonmetallic piping (GRP, HDPE, GRVE, uPVC,)
 Ensure that welding procedures are properly documented and meet specific project requirements
 Performing duties within guidelines of health and environmental safety.
 Anticipation of Require manpower for activities (Fab. shop work, erection, welding, Lamination etc) and supportive material on site for smooth site work going.
 Pressure test and flushing for installed pipeline.
 DPR (Daily site progress report) and RFI preparation and reporting to senior.
 Provide technical assistance to the piping fabrication superintendents and crafts
 Handled personnel and client queries regarding piping systems and site activities.
 Sequencing work activity as per the requirement for speed up work progress.
 Prepare material requisitions, coordinate and review vendor drawings.
 Prepare field change documentation and as-built documentation as required.

Torrent Pharmaceutical Ltd
Executive Project Engineer

   Aug 2014
— Feb 2016

 Installation of Equipment’s Such as PSA Based Nitrogen Plant, Chiller, Cooling Tower and Heat Exchangers. Measurement of Complete and Remaining Welding Work (Inch/Diameter)
 Overseeing the maintenance work during Project.
 Evaluating of vendor document and providing recommendations.
 CS and MS piping work for Steam line, Chilled water and Hotwater system, shop fabrication for manifold and line hydrotesting.
 Exposure to Process Hazard / Risk Analysis, HAZOP / HAZID studies
 Maintain site work regarding safety regulation and permit system
 Piping spool preparation and Erection Work, BOQ, Supporting Documentation Work, TR and Heat Load Calculation for HVAC system.
 Experience in working with HVAC system and Utility piping work (Ducting installation and piping for Hot coil and chilling coil in AHU, Ducting and Insulation installation ducting)